JEF-SR 150-04.80
JEF County · est $0.5M
Bid dateThursday, February 17—
JEF County · est $0.5M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 25 more items below.
| Item | Quantity | R1Craig Edward Susany INC | R2Alan Stone CO INC | R3Ohio-west Virginia Excavating CO | R4Shelly & Sands INC | R5Litman Excavating INC | % of bid |
|---|---|---|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: STEEL PILES W16x50, FURNISHED | 2,280 FT | $40.00 | $45.50 | $43.00 | $43.00 | $41.30 | 22% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 1,558 FT | $40.00 | $35.00 | $40.00 | $42.00 | $51.11 | 15% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 30" DIAMETER, UN | 893 FT | $60.00 | $40.00 | $60.00 | $63.00 | $69.70 | 13% |
| 615E25001 |
| Item | Quantity | R1Craig Edward Susany INC | R2Alan Stone CO INC | R3Ohio-west Virginia Excavating CO | R4Shelly & Sands INC | R5Litman Excavating INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $5,000 | $4,800 | $2,500 | $2,337 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 42 FT | $35.00 | $20.00 | $35.00 | $15.00 | $66.44 |
| 202E38000 GUARDRAIL REMOVED | 325 FT | $3.00 | $3.00 | $6.00 | $2.50 | $7.61 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 215 SY |
| $146 |
| $125 |
| $105 |
| $125 |
| $79.73 |
| 7% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $27,000 | $33,500 | $30,000 | $34,410 | $17,600 | 6% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 608 FT | $40.00 | $38.00 | $72.00 | $80.00 | $60.17 | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 83 CY | $276 | $288 | $185 | $288 | $308 | 5% |
| 304E20000 AGGREGATE BASE | 183 CY | $96.00 | $90.00 | $100 | $90.00 | $123 | 4% |
| 606E15151 GUARDRAIL, TYPE MGS HALF POST SPACING, AS PER PLAN | 325 FT | $37.00 | $32.50 | $33.00 | $32.50 | $45.39 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,000 | $6,500 | $7,500 | $3,607 | $7,200 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $15,000 | $10,000 | $10,000 | $10,662 | 2% |
| 611E10400 24" CONDUIT, TYPE B, 706.02, 707.33, OR 707.01 ALU | 40 FT | $200 | $238 | $125 | $225 | $83.35 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (25 CY | $297 | $308 | $225 | $308 | $374 | 2% |
| 202E23000 PAVEMENT REMOVED | 477 SY | $15.00 | $15.00 | $18.00 | $15.00 | $6.00 | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 18 CY | $357 | $428 | $265 | $428 | $520 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 500 FT | $12.00 | $21.00 | $14.00 | $22.00 | $67.75 | 1% |
| 646E10200 CENTER LINE | 0.08 MILE | $65,000 | $17,500 | $52,000 | $28,000 | $38,278 | 1% |
| 646E10010 EDGE LINE, 6" | 0.08 MILE | $63,500 | $16,000 | $52,000 | $28,000 | $36,778 | 1% |
| 605E06020 4" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 390 FT | $13.00 | $25.00 | $15.00 | $13.00 | $7.26 | 1% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,500 | $2,250 | $2,300 | $2,250 | $8,331 | 1% |
| $1,200 |
| $500 |
| $150 |
| $2,647 |
| 203E20000 EMBANKMENT | 40 CY | $25.00 | $16.00 | $55.00 | $18.00 | $57.61 |
| 204E10000 SUBGRADE COMPACTION | 547 SY | $2.00 | $2.00 | $4.50 | $5.00 | $4.55 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 2 CY | $150 | $1,200 | $278 | $350 | $971 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 712 SY | $3.00 | $2.50 | $4.50 | $4.25 | $4.58 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 12 FT | $13.00 | $86.50 | $22.00 | $18.00 | $160 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $2,100 | $4,500 | $3,000 | $3,500 | $4,918 |
| 611E99711 PRECAST REINFORCED CONCRETE OUTLET, AS PER PLAN | 1 EACH | $150 | $250 | $250 | $225 | $2,046 |
| 407E10000 TACK COAT | 80 GAL | $5.00 | $2.00 | $8.00 | $2.00 | $22.78 |
| 408E10001 PRIME COAT, AS PER PLAN | 44 GAL | $30.00 | $16.00 | $12.00 | $16.00 | $53.78 |
| 621E00100 RPM | 5 EACH | $410 | $410 | $425 | $400 | $742 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 5 EACH | $10.00 | $37.00 | $25.00 | $35.00 | $382 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 4 EACH | $10.00 | $10.00 | $11.00 | $10.00 | $426 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 3 FT | $25.00 | $50.00 | $50.00 | $50.00 | $569 |
| 630E08600 SIGN POST REFLECTOR | 3 EACH | $25.00 | $50.00 | $50.00 | $50.00 | $579 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $75.00 | $65.00 | $68.00 | $65.00 | $881 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $10.00 | $20.00 | $22.00 | $20.00 | $574 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.1 MILE | $7,300 | $7,275 | $7,300 | $7,275 | $23,897 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.1 MILE | $7,300 | $7,250 | $7,300 | $7,250 | $23,872 |
| 530E50010 SPECIAL - RETAINING WALL, CAST-IN-PLACE CONCRETE L | 28 SF | $70.00 | $100 | $60.00 | $150 | $42.86 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,000 | $6,500 | $1,500 | $7,000 | $3,662 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: STEEL PILES W16x50, FURNISHED | 2,280 FT | $40 | $91k | 21% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 1,558 FT | $40 | $62k | 14% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 30" DIAMETER, UN | 893 FT | $60 | $54k | 12% |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 215 SY | $146 | $31k | 7% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $27,000 | $27k | 6% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 608 FT | $40 | $24k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 83 CY | $276 | $23k | 5% |
| 304E20000 AGGREGATE BASE | 183 CY | $96 | $18k | 4% |
| 606E15151 GUARDRAIL, TYPE MGS HALF POST SPACING, AS PER PLAN | 325 FT | $37 | $12k | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,000 | $12k | 3% |