| Item | Quantity | R1Shelly & Sands INC | R2Alan Stone CO INC | R3Ohio-west Virginia Excavating CO | % of bid |
|---|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES W24x117 | 2,927 FT | $100 | $99.50 | $100 | 21% |
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES W21x101 | 2,250 FT | $91.00 | $91.00 | $96.60 | 15% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 2,170 FT | $65.00 | $57.00 | $71.00 | 10% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 991 FT | $80.00 | $78.50 | $103 | 6% |
| 530E00400 SPECIAL - STRUCTURES - PRECAST CONCRETE PANEL | 228 EACH | $325 | $260 |
| Item | Quantity | R1Shelly & Sands INC | R2Alan Stone CO INC | R3Ohio-west Virginia Excavating CO |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,440 | $3,900 | $6,000 |
| 202E23000 PAVEMENT REMOVED | 890 SY | $15.00 | $6.00 | $22.00 |
| 203E10000 EXCAVATION | 110 CY | $7.00 | $11.00 | $27.00 |
| 203E20000 EMBANKMENT | 407 CY | $15.00 | $2.50 | $10.00 |
| 203E98000 ROADWAY, MISC.:BARRIER GROUT | 55 CY | $280 | $489 | $285 |
| 203E98000 ROADWAY, MISC.:PRODUCTION GROUT | 53 CY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $325 |
| 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 197 CY | $300 | $299 | $215 | 4% |
| 530E00400 SPECIAL - STRUCTURES - PRECAST CONCRETE PANEL | 178 EACH | $325 | $270 | $300 | 4% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 36" DIAMETER, UN | 620 FT | $82.00 | $65.50 | $87.00 | 4% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 36" DIAMETER, UN | 600 FT | $82.00 | $65.50 | $83.00 | 4% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 736 FT | $65.00 | $69.50 | $65.00 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 126 CY | $375 | $409 | $242 | 3% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 2 EACH | $21,000 | $3,400 | $2,000 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $20,000 | $73,000 | 3% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 359 SY | $87.00 | $59.00 | $100 | 2% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 217 CY | $125 | $105 | $80.00 | 2% |
| 203E98500 ROADWAY, MISC.:TEST TRENCH | 1 LS | $27,000 | $47,000 | $28,000 | 2% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 351 FT | $75.00 | $133 | $135 | 2% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $25,000 | $9,100 | $8,500 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $24,000 | $77,000 | $67,000 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,350 FT | $15.00 | $21.00 | $19.00 | 1% |
| $245 |
| $428 |
| $245 |
| 203E98300 ROADWAY, MISC.:ANGLED 6-INCH INJECTION BOREHOLE | 673 FT | $20.00 | $36.50 | $20.00 |
| 203E98300 ROADWAY, MISC.:VERTICAL 6-INCH INJECTION BOREHOLE | 620 FT | $21.00 | $35.00 | $21.00 |
| 203E98500 ROADWAY, MISC.:EMERGENCY ACTION PLAN | 1 LS | $3,000 | $5,200 | $3,000 |
| 203E98500 ROADWAY, MISC.:SITE MONITORING PLAN | 1 LS | $3,000 | $5,200 | $3,000 |
| 203E98500 ROADWAY, MISC.:UNDERGROUND VOID PRESSURE MONITORIN | 1 LS | $3,000 | $5,200 | $3,000 |
| 204E10000 SUBGRADE COMPACTION | 1,101 SY | $3.50 | $2.00 | $4.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 675 FT | $24.00 | $28.50 | $31.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 250 FT | $25.00 | $29.50 | $36.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350/MASH 2016) | 3 EACH | $2,700 | $3,200 | $2,400 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,350 | $1,600 | $1,500 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 4 SY | $100 | $190 | $350 |
| 659E10000 SEEDING AND MULCHING | 1,603 SY | $1.80 | $3.50 | $2.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.22 TON | $800 | $1,200 | $800 |
| 659E31000 LIME | 0.33 ACRE | $80.00 | $237 | $80.00 |
| 659E35000 WATER | 10 MGAL | $1.00 | $0.01 | $1.00 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 240 FT | $15.00 | $13.00 | $22.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 10 FT | $40.00 | $12.00 | $25.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $225 | $295 | $500 |
| 304E20000 AGGREGATE BASE | 176 CY | $65.00 | $79.50 | $98.00 |
| 407E20000 NON-TRACKING TACK COAT | 239 GAL | $3.00 | $5.00 | $3.00 |
| 408E10000 PRIME COAT | 88 GAL | $25.00 | $37.00 | $5.00 |
| 617E10100 COMPACTED AGGREGATE | 5 CY | $115 | $159 | $200 |
| 621E00100 RPM | 9 EACH | $335 | $397 | $340 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 18 EACH | $20.00 | $10.00 | $33.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 23 EACH | $10.00 | $12.00 | $15.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.4 MILE | $4,450 | $5,300 | $4,500 |
| 642E00300 CENTER LINE, TYPE 1 | 0.2 MILE | $8,440 | $10,000 | $8,500 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,200 | $2,600 | $2,400 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 23 EACH | $7.00 | $38.00 | $32.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 23 EACH | $15.00 | $45.00 | $40.00 |
| 616E10000 WATER | 2 MGAL | $35.00 | $1.00 | $1.00 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 23 CY | $295 | $677 | $295 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 347 FT | $4.50 | $6.50 | $15.00 |
| 524E95000 DRILLED SHAFTS, MISC.: EXTENSION | 26 FT | $50.00 | $67.50 | $90.00 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 24 CY | $265 | $664 | $290 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 152 CY | $125 | $86.00 | $85.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 358 FT | $4.50 | $6.50 | $12.00 |
| 524E95000 DRILLED SHAFTS, MISC.: EXTENSION | 12 FT | $50.00 | $67.00 | $90.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,533 | $15,000 | $18,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $13,500 | $3,700 | $2,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES W24x117 | 2,927 FT | $100 | $293k | 18% |
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES W21x101 | 2,250 FT | $91 | $205k | 13% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 2,170 FT | $65 | $141k | 9% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 991 FT | $80 | $79k | 5% |
| 530E00400 SPECIAL - STRUCTURES - PRECAST CONCRETE PANEL | 228 EACH | $325 | $74k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 197 CY | $300 | $59k | 4% |
| 530E00400 SPECIAL - STRUCTURES - PRECAST CONCRETE PANEL | 178 EACH | $325 | $58k | 4% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 36" DIAMETER, UN | 620 FT | $82 | $51k | 3% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 36" DIAMETER, UN | 600 FT | $82 | $49k | 3% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 736 FT | $65 | $48k | 3% |