D11-GR-FY2023
D11 County · est $2.5M
Bid dateThursday, March 9—
D11 County · est $2.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 38 more items below.
| Item | Quantity | R1Lake Erie Construction Company | R2Pdk Construction INC | R3Cuyahoga Fence LLC | % of bid |
|---|---|---|---|---|---|
| 606E15050 GUARDRAIL, TYPE MGS | 66,093.75 FT | $15.36 | $16.44 | $19.00 | 60% |
| 606E27810 ANCHOR ASSEMBLY REBUILT, MGS TYPE A | 230 EACH | $445 | $820 | $925 | 6% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 5,500 FT | $16.80 | $17.70 | $21.00 | 5% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 34 EACH | $2,450 | $2,260 | $2,250 | 5% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 71 EACH | $1,125 | $1,100 | $1,000 | 5% |
| 202E38000 GUARDRAIL REMOVED | 26,504 FT | $2.80 | $2.30 | $1.50 | 4% |
| 606E60029 IMPACT ATTENUATOR, TYPE 2 (BIDIRECTIONAL), AS PER | 2 EACH | $22,500 |
| Item | Quantity | R1Lake Erie Construction Company | R2Pdk Construction INC | R3Cuyahoga Fence LLC |
|---|---|---|---|---|
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN (B) | 288 FT | $3.50 | $2.00 | $2.00 |
| 203E20000 EMBANKMENT | 100 CY | $62.50 | $50.00 | $70.00 |
| 203E40000 BORROW | 50 CY | $60.00 | $45.00 | $50.00 |
| 209E15050 RESHAPING UNDER GUARDRAIL | 14.73 MILE | $500 | $550 | $200 |
| 606E13050 GUARDRAIL, TYPE 5A | 100 FT | $24.00 | $27.00 | $23.00 |
| 606E18500 GUARDRAIL POST, 9 FEET |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $29,500 |
| $24,000 |
| 3% |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 31 EACH | $1,240 | $1,200 | $1,200 | 2% |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 893.75 FT | $24.80 | $17.72 | $29.00 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $17,500 | $34,900 | $30,000 | 1% |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN (A) | 5,750 FT | $3.00 | $2.00 | $2.00 | 1% |
| 614E18000 MAINTAINING TRAFFIC, MISC.:GUARDRAIL REPAIR | 30 EACH | $525 | $600 | $350 | 1% |
| 606E13000 GUARDRAIL, TYPE 5 | 1,000 FT | $15.40 | $20.10 | $20.00 | 1% |
| 659E10000 SEEDING AND MULCHING | 34,537 SY | $0.40 | $0.76 | $0.90 | 1% |
| 606E55210 SPECIAL - CABLE BARRIER, ANCHOR RECONSTRUCTED | 10 EACH | $1,350 | $1,200 | $1,200 | 1% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 6 EACH | $2,240 | $1,990 | $1,800 | 1% |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 475 FT | $25.20 | $25.18 | $25.25 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $11,495 | $21,600 | $25,000 | 1% |
| 606E98000 GUARDRAIL, MISC.:RAIL PANEL | 1,137.5 FT | $10.00 | $10.80 | $11.00 | 1% |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN | 287.5 FT | $39.40 | $55.76 | $43.25 | 1% |
| 25 EACH |
| $25.00 |
| $27.00 |
| $36.00 |
| 606E20050 ROUNDED END SECTION | 58 EACH | $50.00 | $50.00 | $50.00 |
| 606E25000 ANCHOR ASSEMBLY, TYPE A | 3 EACH | $1,320 | $1,600 | $1,300 |
| 606E26000 ANCHOR ASSEMBLY, TYPE B | 2 EACH | $2,120 | $2,100 | $1,675 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 4 EACH | $2,140 | $1,990 | $1,675 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E (NCHRP 350 OR MASH 2016) | 2 EACH | $2,840 | $2,380 | $2,050 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 3 EACH | $875 | $860 | $875 |
| 606E27800 ANCHOR ASSEMBLY REBUILT, TYPE A | 2 EACH | $495 | $1,300 | $950 |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 1 EACH | $2,500 | $2,200 | $2,400 |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 1 EACH | $2,500 | $2,270 | $2,400 |
| 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN (A) | 15 EACH | $700 | $600 | $875 |
| 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN (B) | 3 EACH | $700 | $700 | $875 |
| 606E55020 SPECIAL - CABLE BARRIER, REPLACEMENT CABLE | 100 FT | $8.00 | $9.00 | $9.00 |
| 606E55100 SPECIAL - CABLE BARRIER, CONCRETE LINE POST FOUNDA | 5 EACH | $280 | $300 | $225 |
| 606E55110 SPECIAL - CABLE BARRIER, CONCRETE ANCHOR FOUNDATIO | 2 EACH | $1,375 | $350 | $375 |
| 606E55140 SPECIAL - CABLE BARRIER, ANCHOR POST | 5 EACH | $220 | $210 | $200 |
| 606E55160 SPECIAL - CABLE BARRIER, TERMINAL STRUT | 5 EACH | $225 | $220 | $225 |
| 606E55170 SPECIAL - CABLE BARRIER, TURNBUCKLE | 4 EACH | $300 | $300 | $295 |
| 606E55180 SPECIAL - CABLE BARRIER, SPLICE | 10 EACH | $275 | $280 | $225 |
| 606E55190 SPECIAL - CABLE BARRIER, POST REFLECTOR | 100 EACH | $12.50 | $10.00 | $10.00 |
| 606E55200 SPECIAL - CABLE BARRIER, TENSIONING | 4 EACH | $295 | $500 | $225 |
| 606E55220 SPECIAL - CABLE BARRIER, ANCHOR POST RESET | 5 EACH | $180 | $200 | $200 |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) | 2 EACH | $4,925 | $4,200 | $4,650 |
| 606E98100 GUARDRAIL, MISC.: LINE POST | 100 EACH | $90.00 | $125 | $100 |
| 606E98100 GUARDRAIL, MISC.:NCHOR TRIGGER POST | 2 EACH | $420 | $400 | $550 |
| 606E98100 GUARDRAIL, MISC.:TENSIONED CABLE ANCHOR TERMINAL | 5 EACH | $1,350 | $1,500 | $1,500 |
| 659E20000 COMMERCIAL FERTILIZER | 4.66 TON | $200 | $200 | $375 |
| 659E31000 LIME | 7.14 ACRE | $10.00 | $50.00 | $85.00 |
| 659E35000 WATER | 187 MGAL | $0.30 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 1,106 EACH | $9.00 | $9.00 | $7.25 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $10,400 | $27,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,250 | $1.00 | $2,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 606E15050 GUARDRAIL, TYPE MGS | 66,093.75 FT | $15.36 | $1.02M | 55% |
| 606E27810 ANCHOR ASSEMBLY REBUILT, MGS TYPE A | 230 EACH | $445 | $102k | 6% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 5,500 FT | $16.8 | $92k | 5% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 34 EACH | $2,450 | $83k | 5% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 71 EACH | $1,125 | $80k | 4% |
| 202E38000 GUARDRAIL REMOVED | 26,504 FT | $2.8 | $74k | 4% |
| 606E60029 IMPACT ATTENUATOR, TYPE 2 (BIDIRECTIONAL), AS PER | 2 EACH | $22,500 | $45k | 2% |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 31 EACH | $1,240 | $38k | 2% |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 893.75 FT | $24.8 | $22k | 1% |
| 624E10000 MOBILIZATION | 1 LS | $17,500 | $18k | 1% |