CUY-Monticello Blvd Signals
CUY County · est $0.8M
Bid dateThursday, March 30—
CUY County · est $0.8M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 46 more items below.
| Item | Quantity | R1Miller Cable Company | R2Perram Electric INC | R3S E T INC | R4Perk Company INC | % of bid |
|---|---|---|---|---|---|---|
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 18 EACH | $9,300 | $9,600 | $10,250 | $9,105 | 24% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $77,300 | $27,500 | $48,000 | $40,000 | 11% |
| 633E68511 COMMUNICATIONS, AS PER PLAN | 6 EACH | $7,700 | $7,220 | $9,000 | $9,269 | 7% |
| 608E10000 4" CONCRETE WALK | 2,699 SF | $17.00 | $17.00 | $17.00 | $18.00 | 7% |
| 608E52001 CURB RAMP, AS PER PLAN | 2,686 SF | $17.00 | $17.00 | $28.00 | $68.00 | 7% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 4 EACH | $10,500 | $11,395 | $12,000 |
| Item | Quantity | R1Miller Cable Company | R2Perram Electric INC | R3S E T INC | R4Perk Company INC |
|---|---|---|---|---|---|
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $8,000 | $7,000 | $10,000 | $1,500 |
| 202E32000 CURB REMOVED | 550 FT | $17.50 | $17.50 | $12.00 | $14.50 |
| 202E38000 GUARDRAIL REMOVED | 6 FT | $95.00 | $114 | $110 | $25.00 |
| 659E00100 SOIL ANALYSIS TEST | 1 EACH | $400 | $400 | $250 | $10.00 |
| 659E00300 TOPSOIL | 22.2 CY | $80.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $13,328 |
| 6% |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 42 EACH | $700 | $1,020 | $620 | $616 | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $28,500 | $1,000 | $12,396 | $10,000 | 4% |
| 202E30000 WALK REMOVED | 5,376 SF | $5.25 | $5.25 | $4.00 | $4.00 | 4% |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 5 EACH | $5,200 | $4,915 | $6,000 | $5,157 | 4% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 122 SY | $185 | $217 | $200 | $300 | 3% |
| 632E64020 PEDESTAL FOUNDATION | 22 EACH | $1,000 | $1,830 | $960 | $1,045 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | $20,000 | $20,500 | 3% |
| 609E26000 CURB, TYPE 6 | 550 FT | $32.00 | $32.00 | $58.00 | $75.00 | 3% |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 5,508 FT | $3.00 | $4.16 | $4.00 | $2.95 | 2% |
| 255E10011 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 78 SY | $180 | $180 | $135 | $375 | 2% |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL, LOCATIONS IN TRA | 4 EACH | $3,300 | $3,000 | $3,200 | $1,695 | 2% |
| 632E89900 PEDESTAL, 8', TRANSFORMER BASE | 22 EACH | $600 | $1,408 | $715 | $715 | 2% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 201 FT | $65.00 | $88.95 | $100 | $101 | 2% |
| 625E25400 CONDUIT, 2", 725.04 | 455 FT | $22.00 | $29.80 | $18.00 | $26.84 | 1% |
| $80.00 |
| $75.00 |
| $100 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 200 SY | $6.00 | $6.00 | $4.00 | $15.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 10 SY | $8.00 | $8.00 | $10.00 | $1.00 |
| 659E15000 INTER-SEEDING | 10 SY | $8.00 | $8.00 | $10.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.03 TON | $1,500 | $1,500 | $5,000 | $950 |
| 659E31000 LIME | 0.41 ACRE | $500 | $500 | $500 | $450 |
| 659E35000 WATER | 1.1 MGAL | $20.00 | $20.00 | $100 | $50.00 |
| 832E30001 EROSION CONTROL, AS PER PLAN | 2,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 304E20000 AGGREGATE BASE | 10 CY | $80.00 | $80.00 | $150 | $125 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 5 EACH | $350 | $350 | $100 | $1,500 |
| 611E99700 SPECIAL - GAS VALVE BOX ADJUSTED TO GRADE | 4 EACH | $350 | $350 | $75.00 | $750 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 77.6 FT | $25.00 | $17.85 | $10.00 | $8.85 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 28.2 FT | $30.00 | $16.75 | $15.00 | $13.40 |
| 630E08600 SIGN POST REFLECTOR | 4 EACH | $49.00 | $100 | $65.00 | $61.95 |
| 630E80100 SIGN, FLAT SHEET | 48.8 SF | $35.00 | $28.95 | $25.00 | $24.60 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 5 EACH | $10.00 | $34.00 | $35.00 | $33.65 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $20.00 | $42.50 | $45.00 | $42.50 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 22 EACH | $30.00 | $30.90 | $36.00 | $34.75 |
| 642E00300 CENTER LINE, TYPE 1 | 0.01 MILE | $100,000 | $100,000 | $10,000 | $3,000 |
| 642E00500 STOP LINE, TYPE 1 | 326 FT | $3.00 | $3.00 | $4.00 | $3.00 |
| 642E00620 CROSSWALK LINE, 12", TYPE 1 | 3,285 FT | $2.40 | $2.40 | $2.50 | $2.25 |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 4,214 FT | $0.55 | $0.55 | $3.00 | $3.00 |
| 642E30020 REMOVAL OF PAVEMENT MARKING | 1 EACH | $200 | $200 | $150 | $125 |
| 625E25500 CONDUIT, 3", 725.04 | 17 FT | $65.00 | $49.80 | $50.00 | $37.10 |
| 625E25911 CONDUIT CLEANED AND CABLES REMOVED, AS PER PLAN | 361 FT | $1.00 | $3.30 | $9.00 | $1.24 |
| 625E29000 TRENCH | 435 FT | $18.00 | $21.72 | $12.00 | $14.57 |
| 625E29400 TRENCH IN PAVED AREA | 37 FT | $45.00 | $125 | $90.00 | $105 |
| 625E30700 PULL BOX, 725.08, 18" | 5 EACH | $1,100 | $2,132 | $980 | $1,024 |
| 625E30706 PULL BOX, 725.08, 24" | 3 EACH | $1,300 | $2,300 | $1,200 | $1,276 |
| 625E32000 GROUND ROD | 26 EACH | $275 | $290 | $450 | $265 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 472 FT | $3.00 | $1.35 | $1.00 | $1.30 |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 8 EACH | $1,250 | $1,375 | $1,000 | $905 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 42 EACH | $70.00 | $5.00 | $42.00 | $40.00 |
| 632E26001 PEDESTRIAN PUSHBUTTON, AS PER PLAN | 26 EACH | $250 | $594 | $250 | $300 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 3,936 FT | $1.50 | $3.81 | $3.00 | $1.97 |
| 632E70001 POWER SERVICE, AS PER PLAN | 4 EACH | $750 | $2,820 | $3,200 | $3,725 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 4 EACH | $400 | $760 | $1,100 | $1,015 |
| 632E89300 WOOD POLE | 1 EACH | $2,000 | $1,520 | $1,800 | $1,776 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 8 EACH | $440 | $1,850 | $3,600 | $3,689 |
| 633E99000 CONTROLLER ITEM, MISC.: CONTROLLER MODIFICATIONS | 1 EACH | $1,300 | $1,780 | $2,000 | $1,820 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $80.00 | $70.00 | $68.00 | $85.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,218 | $14,893 | $8,000 | $12,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 18 EACH | $9,300 | $167k | 20% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $77,300 | $77k | 9% |
| 633E68511 COMMUNICATIONS, AS PER PLAN | 6 EACH | $7,700 | $46k | 6% |
| 608E10000 4" CONCRETE WALK | 2,699 SF | $17 | $46k | 6% |
| 608E52001 CURB RAMP, AS PER PLAN | 2,686 SF | $17 | $46k | 6% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 4 EACH | $10,500 | $42k | 5% |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 42 EACH | $700 | $29k | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $28,500 | $29k | 3% |
| 202E30000 WALK REMOVED | 5,376 SF | $5.25 | $28k | 3% |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 5 EACH | $5,200 | $26k | 3% |