D04-SIGN FY2023 (Systematic)
D04 County · est $1.2M
Bid dateThursday, March 30—
D04 County · est $1.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 47 more items below.
| Item | Quantity | R1Lake Erie Construction Company | R2Cleveland Barricading Systems LLC | % of bid |
|---|---|---|---|---|
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 20,484.6 FT | $10.00 | $8.45 | 21% |
| 630E72420 OVERHEAD SIGN SUPPORT, TYPE TC-15.116, DESIGN 2 | 2 EACH | $94,125 | $95,225 | 20% |
| 630E80100 SIGN, FLAT SHEET | 12,685.1 SF | $10.00 | $10.75 | 13% |
| 630E72410 OVERHEAD SIGN SUPPORT, TYPE TC-15.116, DESIGN 1 | 2 EACH | $57,850 | $59,125 | 12% |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 8 EACH | $8,500 | $12,525 | 7% |
| AB1 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 3,355.8 FT | $10.00 | $8.45 | 3% |
| AA1 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 2,234 FT | $10.00 | $8.45 | 2% |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1,773 EACH | $12.50 | $11.35 | 2% |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2,227 EACH | $9.00 | $8.85 | 2% |
| AB1 630E80100 SIGN, FLAT SHEET | 1,961 SF | $10.00 | $10.75 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $19,370 | $48,000 | 2% |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 930 SF | $19.50 | $16.25 | 2% |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 52 EACH | $345 | $211 | 2% |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 100 EACH | $145 | $74.00 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $14,500 | $36,000 | 2% |
| AA1 630E80100 SIGN, FLAT SHEET | 1,397 SF | $10.00 | $10.75 | 1% |
| 630E08600 SIGN POST REFLECTOR (RED) | 364 EACH | $35.00 | $12.75 | 1% |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 15 EACH | $750 | $660 | 1% |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 975 FT | $9.00 | $7.05 | 1% |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 421 SF | $19.50 | $32.15 | 1% |
| Item | Quantity | R1Lake Erie Construction Company | R2Cleveland Barricading Systems LLC |
|---|---|---|---|
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $3,650 | $1,000 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 1 EACH | $200 | $985 |
| 606E15050 GUARDRAIL, TYPE MGS | 263 FT | $21.60 | $31.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 1 EACH | $3,425 | $2,630 |
| 625E32000 GROUND ROD | 5 EACH | $320 | $575 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 192 FT |
| $19.00 |
| $15.20 |
| 630E06400 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, S4X7.7 | 27.5 FT | $38.00 | $37.95 |
| 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 | 31.5 FT | $42.00 | $37.85 |
| 630E08600 SIGN POST REFLECTOR (YELLOW) | 119 EACH | $35.00 | $12.75 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 4 EACH | $425 | $300 |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 2 EACH | $425 | $338 |
| 630E79200 SIGN ATTACHMENT ASSEMBLY, MAST ARM | 9 EACH | $495 | $295 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 18 SF | $22.00 | $19.25 |
| 630E82000 SIGN BACKING ASSEMBLY | 31 EACH | $185 | $81.00 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 4 EACH | $820 | $1,515 |
| 630E85001 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE, AS PER | 1 EACH | $50.00 | $198 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 48 EACH | $60.00 | $24.80 |
| 630E85101 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, AS | 9 EACH | $95.00 | $16.59 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 9 EACH | $225 | $273 |
| 630E86292 REMOVAL OF GROUND MOUNTED WOODEN BOX BEAM SUPPORT | 2 EACH | $525 | $148 |
| 630E87100 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION | 14 EACH | $575 | $580 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 70 EACH | $65.00 | $72.55 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 97 EACH | $20.00 | $16.50 |
| 630E89804 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 4 EACH | $1,450 | $2,475 |
| AA1 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 72 FT | $9.00 | $7.05 |
| AA1 630E08600 SIGN POST REFLECTOR (RED) | 37 EACH | $35.00 | $12.75 |
| AA1 630E08600 SIGN POST REFLECTOR (YELLOW) | 69 EACH | $35.00 | $12.75 |
| AA1 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 22 EACH | $145 | $74.00 |
| AA1 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 249 EACH | $9.00 | $8.85 |
| AA1 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 7 EACH | $50.00 | $24.80 |
| AA1 630E85101 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, AS | 3 EACH | $95.00 | $24.80 |
| AA1 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 199 EACH | $12.50 | $11.35 |
| AA1 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 22 EACH | $20.00 | $16.50 |
| AB1 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 146 FT | $9.00 | $7.05 |
| AB1 630E08600 SIGN POST REFLECTOR (RED) | 44 EACH | $35.00 | $12.75 |
| AB1 630E08600 SIGN POST REFLECTOR (YELLOW) | 41 EACH | $35.00 | $12.75 |
| AB1 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 12 EACH | $145 | $74.00 |
| AB1 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 386 EACH | $9.00 | $8.85 |
| AB1 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 10 EACH | $50.00 | $24.80 |
| AB1 630E85101 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, AS | 13 EACH | $95.00 | $24.80 |
| AB1 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 291 EACH | $12.50 | $11.35 |
| AB1 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 11 EACH | $20.00 | $16.50 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $50.00 | $85.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,500 | $5,793 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $350 | $615 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,200 | $14,925 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 20,484.6 FT | $10 | $205k | 19% |
| 630E72420 OVERHEAD SIGN SUPPORT, TYPE TC-15.116, DESIGN 2 | 2 EACH | $94,125 | $188k | 18% |
| 630E80100 SIGN, FLAT SHEET | 12,685.1 SF | $10 | $127k | 12% |
| 630E72410 OVERHEAD SIGN SUPPORT, TYPE TC-15.116, DESIGN 1 | 2 EACH | $57,850 | $116k | 11% |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 8 EACH | $8,500 | $68k | 6% |
| AB1 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 3,355.8 FT | $10 | $34k | 3% |
| AA1 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 2,234 FT | $10 | $22k | 2% |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1,773 EACH | $12.5 | $22k | 2% |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2,227 EACH | $9 | $20k | 2% |
| AB1 630E80100 SIGN, FLAT SHEET | 1,961 SF | $10 | $20k | 2% |