631E93241SCHOOL SPEED LIMIT SIGN ASSEMBLY, SOLAR-POWERED, A
22 EACH
$11,000
$10,615
$11,450
$12,300
80%
631E94490REMOVAL, MISC.: SCHOOL SPEED LIMIT ASSEMBLY AND CO
22 EACH
$470
$680
$700
$1,950
3%
624E10000MOBILIZATION
1 LS
$10,000
$10,000
$10,000
$10,000
3%
623E10000CONSTRUCTION LAYOUT STAKES AND SURVEYING
1 LS
$9,760
$200
$500
$3,300
3%
630E80100SIGN, FLAT SHEET
310 SF
$21.50
$27.10
$29.00
$30.00
2%
625E32000GROUND ROD
22 EACH
$300
$307
Project details
Description
D05-FY 2023 School Flasher
Type of work
Signals
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
$385
$340
2%
614E11000MAINTAINING TRAFFIC
1 LS
$6,200
$14,550
$8,000
$15,000
2%
630E03101GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN
350 FT
$17.50
$22.65
$22.00
$25.00
2%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$2,775
$5,404
$3,000
$2,300
1%
630E84900REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL
40 EACH
$15.00
$37.40
$120
$30.00
0%
630E85100REMOVAL OF GROUND MOUNTED SIGN AND REERECTION
9 EACH
$65.00
$374
$400
$500
0%
630E86002REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA
24 EACH
$20.00
$187
$120
$60.00
0%
630E79500SIGN SUPPORT ASSEMBLY, POLE MOUNTED
2 EACH
$185
$237
$150
$300
0%
$11,000
$242k
80%
631E94490REMOVAL, MISC.: SCHOOL SPEED LIMIT ASSEMBLY AND CO
22 EACH
$470
$10k
3%
624E10000MOBILIZATION
1 LS
$10,000
$10k
3%
623E10000CONSTRUCTION LAYOUT STAKES AND SURVEYING
1 LS
$9,760
$10k
3%
630E80100SIGN, FLAT SHEET
310 SF
$21.5
$7k
2%
625E32000GROUND ROD
22 EACH
$300
$7k
2%
614E11000MAINTAINING TRAFFIC
1 LS
$6,200
$6k
2%
630E03101GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN
350 FT
$17.5
$6k
2%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$2,775
$3k
1%
630E84900REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL