How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
$25,000
1%
624E10000MOBILIZATION
1 LS
$8,500
$28,000
$100,000
1%
659E20000COMMERCIAL FERTILIZER
5.29 TON
$1,575
$330
$2,000
1%
606E35000BRIDGE TERMINAL ASSEMBLY, TYPE 1
4 EACH
$1,900
$2,500
$1,750
1%
606E35150BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 4
10 EACH
$740
$820
$1,000
1%
626E00112BARRIER REFLECTOR, TYPE 3 BIDIRECTIONAL
798 EACH
$8.00
$9.00
$9.00
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$6,100
$7,500
$10,000
1%
209E60201LINEAR GRADING, AS PER PLAN
421 STA
$10.00
$25.00
$115
0%
202E47000BRIDGE TERMINAL ASSEMBLY REMOVED
14 EACH
$120
$75.00
$115
0%
630E85100REMOVAL OF GROUND MOUNTED SIGN AND REERECTION
50 EACH
$25.00
$50.00
$40.00
0%
630E86010REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT