KNO-SR 3-19.76
KNO County · est $0.9M
Bid dateThursday, May 11—
KNO County · est $0.9M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 9 more items below.
| Item | Quantity | R1Lake Erie Construction Company | R2Pdk Construction INC | R3M P Dory CO | R4Cuyahoga Fence LLC | % of bid |
|---|---|---|---|---|---|---|
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 16,250 FT | $18.60 | $20.08 | $20.50 | $25.50 | 36% |
| 203E20001 EMBANKMENT, AS PER PLAN | 2,187 CY | $66.50 | $66.00 | $38.00 | $63.00 | 17% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E(NCHRP 350 OR MASH 2016 | 56 EACH | $2,375 | $2,270 | $2,450 | $2,375 | 16% |
| 606E98000 GUARDRAIL, MISC.:SHOULDER SUPPORT BENCHING | 10,575 FT | $7.20 | $9.10 | $9.50 | $8.50 | 9% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 32 EACH | $1,300 | $1,100 | $1,100 | $1,200 | 5% |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 11,300 FT | $2.00 | $1.80 | $2.50 |
| Item | Quantity | R1Lake Erie Construction Company | R2Pdk Construction INC | R3M P Dory CO | R4Cuyahoga Fence LLC |
|---|---|---|---|---|---|
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 3 EACH | $125 | $125 | $150 | $250 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 10 EACH | $95.00 | $100 | $100 | $250 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 13 EACH | $125 | $100 | $40.00 | $100 |
| 659E20000 COMMERCIAL FERTILIZER | 0.23 TON | $500 | $760 | $850 | $1,200 |
| 659E31000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $2.00 |
| 3% |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 79 EACH | $285 | $230 | $280 | $275 | 3% |
| 606E19001 GUARDRAIL POST, STEEL, AS PER PLAN | 200 EACH | $110 | $65.00 | $90.00 | $115 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $19,500 | $9,000 | $55,000 | $25,000 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $12,000 | $10,300 | $5,000 | $25,000 | 1% |
| 670E00500 SLOPE EROSION PROTECTION | 4,700 SY | $2.20 | $1.88 | $1.00 | $1.00 | 1% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $8,200 | $9,100 | $8,500 | $10,000 | 1% |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 362.5 FT | $21.20 | $18.88 | $24.50 | $24.00 | 1% |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 570 FT | $11.00 | $14.00 | $5.00 | $15.00 | 1% |
| 202E38000 GUARDRAIL REMOVED | 3,362.5 FT | $1.60 | $1.70 | $2.00 | $2.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,471 | $4,600 | $5,500 | $15,000 | 1% |
| 626E00110 BARRIER REFLECTOR, TYPE 2(BI-DIRECTIONAL) | 336 EACH | $10.00 | $9.50 | $8.50 | $11.00 | 0% |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 2 EACH | $1,400 | $1,450 | $1,600 | $1,475 | 0% |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 1,716 SY | $1.50 | $2.48 | $2.00 | $2.75 | 0% |
| 606E50000 SPECIAL - RESHAPING BERM | 19,985 FT | $0.10 | $0.15 | $0.50 | $1.00 | 0% |
| 0.35 ACRE |
| $20.00 |
| $175 |
| $100 |
| $1,200 |
| 659E35000 WATER | 9 MGAL | $1.00 | $1.00 | $10.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 33 EACH | $50.00 | $25.00 | $40.00 | $50.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 38 EACH | $15.00 | $15.00 | $15.00 | $25.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 16,250 FT | $18.6 | $302k | 35% |
| 203E20001 EMBANKMENT, AS PER PLAN | 2,187 CY | $66.5 | $145k | 17% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E(NCHRP 350 OR MASH 2016 | 56 EACH | $2,375 | $133k | 16% |
| 606E98000 GUARDRAIL, MISC.:SHOULDER SUPPORT BENCHING | 10,575 FT | $7.2 | $76k | 9% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 32 EACH | $1,300 | $42k | 5% |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 11,300 FT | $2 | $23k | 3% |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 79 EACH | $285 | $23k | 3% |
| 606E19001 GUARDRAIL POST, STEEL, AS PER PLAN | 200 EACH | $110 | $22k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $19,500 | $20k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $12,000 | $12k | 1% |