STA-/SUM GR FY2024 (Systematic)
STA County · est $0.6M
Bid dateThursday, June 22—
STA County · est $0.6M
Bid form · ODOT
| Item | Qty |
|---|
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount.
| Item | Quantity | R1Lake Erie Construction Company | R2M P Dory CO | % of bid |
|---|---|---|---|---|
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 10,212.5 FT | $22.40 | $22.00 | 44% |
| 441E70801 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (211 CY | $440 | $675 | 18% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E(MASH 2016) | 21 EACH | $2,780 | $2,750 | 11% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 11 EACH | $2,460 | $2,750 | 5% |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 6,820 FT | $3.50 | $25.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $19,500 | $30,000 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,500 | $15,000 | 3% |
| 209E72001 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 69 STA | $185 | $100 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 180 HOUR | $65.00 | $85.00 | 2% |
| 202E38000 GUARDRAIL REMOVED | 4,610 FT | $2.00 | $2.50 | 2% |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 7 EACH | $575 | $650 | 1% |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 4 EACH | $985 | $1,000 | 1% |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | 1% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,395 | $1,300 | 1% |
| 690E21000 SPECIAL - AS BUILT CONSTRUCTION RECORD DRAWINGS | 1 LS | $2,750 | $2,500 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,738 | $5,000 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,450 | $2,500 | 0% |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (ONE-WAY) | 106 EACH | $12.00 | $9.50 | 0% |
| 209E15000 RESHAPING UNDER GUARDRAIL | 5 STA | $150 | $1.00 | 0% |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 20 EACH | $12.00 | $10.00 | 0% |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| Unit price |
|---|
| Extended |
|---|
| % |
|---|
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 10,212.5 FT | $22.4 | $229k | 44% |
| 441E70801 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (211 CY | $440 | $93k | 18% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E(MASH 2016) | 21 EACH | $2,780 | $58k | 11% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 11 EACH | $2,460 | $27k | 5% |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 6,820 FT | $3.5 | $24k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $19,500 | $20k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,500 | $16k | 3% |
| 209E72001 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 69 STA | $185 | $13k | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 180 HOUR | $65 | $12k | 2% |
| 202E38000 GUARDRAIL REMOVED | 4,610 FT | $2 | $9k | 2% |