D01-STW USBR Signage
D01 County · est $0.2M
Bid dateThursday, November 9—
D01 County · est $0.2M
Bid form · ODOT
| Item | Qty |
|---|
ODOT bid tab line items with each bidder’s unit price. Top 14items by winning bid’s extended amount.
| Item | Quantity | R1Cleveland Barricading Systems LLC | R2Lake Erie Construction Company | % of bid |
|---|---|---|---|---|
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 6,944 FT | $12.00 | $30.00 | 36% |
| 630E80100 SIGN, FLAT SHEET | 2,115.8 SF | $23.00 | $22.50 | 21% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $28,155 | $11,500 | 12% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $18,650 | $9,645 | 8% |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 79 EACH | $171 | $295 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $12,785 | $22,500 | 5% |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN (F | 1,787 FT | $7.00 | $5.00 | 5% |
| 647E50100 PAVEMENT MARKING, MISC.: US BIKE ROUTE SHIELD SYMB | 25 EACH | $360 | $1,925 | 4% |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN (FURNISH ONLY) | 438.8 SF | $9.95 | $25.00 | 2% |
| 832E30000 EROSION CONTROL | 1,200 EACH | $1.00 | $1.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $941 | $2,150 | 0% |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 5 EACH | $27.55 | $35.00 | 0% |
| 630E79501 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, AS PER PLAN ( | 1 EACH | $124 | $195 | 0% |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $33.85 | $50.00 | 0% |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| Unit price |
|---|
| Extended |
|---|
| % |
|---|
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 6,944 FT | $12 | $83k | 36% |
| 630E80100 SIGN, FLAT SHEET | 2,115.8 SF | $23 | $49k | 21% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $28,155 | $28k | 12% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $18,650 | $19k | 8% |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 79 EACH | $171 | $14k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $12,785 | $13k | 5% |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN (F | 1,787 FT | $7 | $13k | 5% |
| 647E50100 PAVEMENT MARKING, MISC.: US BIKE ROUTE SHIELD SYMB | 25 EACH | $360 | $9k | 4% |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN (FURNISH ONLY) | 438.8 SF | $9.95 | $4k | 2% |
| 832E30000 EROSION CONTROL | 1,200 EACH | $1 | $1k | 1% |