D03-SYSSIGN FY2024(B)
D03 County · est $0.5M
Bid dateThursday, December 14—
D03 County · est $0.5M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 17,881 FT |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount.
| Item | Quantity | R1Cleveland Barricading Systems LLC | R2Lake Erie Construction Company | R3M P Dory CO | % of bid |
|---|---|---|---|---|---|
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 17,881 FT | $7.50 | $9.00 | $10.50 | 31% |
| 630E80100 SIGN, FLAT SHEET | 7,133 SF | $10.95 | $12.50 | $14.50 | 18% |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 3,320 SF | $19.50 | $21.00 | $22.00 | 15% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $33,580 | $7,800 | $2,500 | 8% |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 1,166 SF | $20.55 | $21.00 | $24.00 | 5% |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 33 EACH | $700 | $645 | $950 | 5% |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1,060 EACH | $15.25 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $10.00 |
| $10.00 |
| 4% |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1,066 EACH | $10.10 | $15.00 | $15.00 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $9,950 | $20,000 | 2% |
| 630E08600 SIGN POST REFLECTOR | 435 EACH | $22.50 | $32.50 | $40.00 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $9,225 | $1,500 | $10,000 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 7 MNTH | $1,200 | $500 | $500 | 2% |
| 630E82000 SIGN BACKING ASSEMBLY | 28 EACH | $150 | $145 | $125 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $75.00 | $55.00 | $60.00 | 1% |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 13 EACH | $220 | $180 | $125 | 1% |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 16 EACH | $142 | $165 | $275 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,767 | $2,100 | $5,000 | 0% |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | 0% |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 13 EACH | $46.85 | $35.00 | $15.00 | 0% |
| 630E04101 GROUND MOUNTED SUPPORT, NO. 4 POST, AS PER PLAN | 36 FT | $12.50 | $15.00 | $25.00 | 0% |
| $7.5 |
| $134k |
| 31% |
| 630E80100 SIGN, FLAT SHEET | 7,133 SF | $10.95 | $78k | 18% |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 3,320 SF | $19.5 | $65k | 15% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $33,580 | $34k | 8% |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 1,166 SF | $20.55 | $24k | 5% |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 33 EACH | $700 | $23k | 5% |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1,060 EACH | $15.25 | $16k | 4% |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1,066 EACH | $10.1 | $11k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 2% |
| 630E08600 SIGN POST REFLECTOR | 435 EACH | $22.5 | $10k | 2% |