Figure 0.1 · BRIEFING BID #234016 · ODOT RESULT · awarded May 11 ATH-SR 13-00.46 ATH County · est $0.5M
Bid date Thursday, May 11 —
Project scope Bid form · ODOT
50 ITEMS Earthwork 16% Maintaining Traffic 14% Guardrail & Barrier 12% Structures / Bridge 12% Drainage 8% Pavement Marking 8% Other Item Quantity R1 Alan Stone CO INC % of bid 507E00301 STEEL PILES HP14X73, FURNISHED, AS PER PLAN 1,204 FT $80.00 25% 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER 530 FT $95.00 13% 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE 419 FT $95.00 10% 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC 187 CY $150 7% 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG 84 CY $300 6% 614E11000 MAINTAINING TRAFFIC 1 LS $23,000 6% 511E71200 CONCRETE, MISC.:PRECAST LAGGING PANEL NO 1 1,276 SF $17.50 6% 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449), 9" 42 CY $375 4% 622E41100 PORTABLE BARRIER, UNANCHORED 670 FT $21.00 4% 511E71200 CONCRETE, MISC.:PRECAST LAGGING PANEL NO 3 726 SF $18.50 3% 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN 20 CY $500 3% 624E10000 MOBILIZATION 1 LS $10,000 3% 511E71200 CONCRETE, MISC.:PRECAST LAGGING PANEL NO 2 341 SF $20.50 2% 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING 1 LS $6,500 2% 606E15050 GUARDRAIL, TYPE MGS 250 FT $25.00 2% 832E30000 EROSION CONTROL 5,000 EACH $1.00 1% 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS 175 FT $28.00 1% 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS — $2,250 1% 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM 1 LS $4,000 1% 203E10000 EXCAVATION 199 CY $20.00 1%
Show all 50 line items Item Quantity R1 Alan Stone CO INC 201E11000 CLEARING AND GRUBBING 1 LS $2,000 202E23000 PAVEMENT REMOVED 249 SY $14.00 202E38000 GUARDRAIL REMOVED 425 FT $3.00 203E20000 EMBANKMENT 161 CY $10.00 204E10000 SUBGRADE COMPACTION 249 SY $5.00 204E20000 EMBANKMENT 18 CY $6.00 204E45000 PROOF ROLLING 1 HOUR $220 659E10000 SEEDING AND MULCHING 1,744 SY $2.21 659E20000 COMMERCIAL FERTILIZER 0.24 TON $756
Project details
Description ATH-SR 13-00.46
Type of work Earthwork How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →