BEL-US 250-09.08
BEL County · est $0.3M
Bid dateThursday, March 21—
BEL County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 13 more items below.
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Shelly & Sands INC | R3Litman Excavating INC | R4Dennison Bridge INC | R5Alan Stone CO INC | % of bid |
|---|---|---|---|---|---|---|---|
| 507E00200 STEEL PILES HP12X53, FURNISHED | 1,285 FT | $38.00 | $45.00 | $54.29 | $42.00 | $40.00 | 19% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 500 FT | $80.00 | $80.00 | $79.09 | $85.00 | $130 | 15% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $33,500 | $36,850 | $17,191 | $45,000 | $78,000 | 13% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 750 FT | $44.00 | $65.00 | $62.88 | $75.00 | $85.00 | 13% |
| 524E95000 DRILLED SHAFTS, MISC.:PLUG PILE, 24" DIAMETER, UNR | 430 FT | $69.00 | $70.00 | $79.22 | $75.00 | $95.00 | 11% |
| 624E10000 |
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Shelly & Sands INC | R3Litman Excavating INC | R4Dennison Bridge INC | R5Alan Stone CO INC |
|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 30 SY | $45.00 | $45.00 | $33.08 | $75.00 | $130 |
| 202E38000 GUARDRAIL REMOVED | 213 FT | $6.00 | $5.00 | $2.40 | $3.00 | $8.50 |
| 203E20000 EMBANKMENT | 7 CY | $90.00 | $135 | $45.06 | $30.00 | $130 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $12,000 |
| $10,000 |
| $18,011 |
| $18,500 |
| $14,500 |
| 5% |
| 524E95000 DRILLED SHAFTS, MISC.:PLUG PILE, 30" DIAMETER, UNR | 90 FT | $109 | $100 | $78.20 | $115 | $190 | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 380 FT | $23.00 | $30.00 | $24.66 | $18.00 | $25.00 | 3% |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 212.5 FT | $38.00 | $48.00 | $53.79 | $40.00 | $55.00 | 3% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,900 | $2,500 | $3,338 | $2,750 | $3,000 | 2% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 17 CY | $265 | $295 | $287 | $150 | $240 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,500 | $1,800 | $3,485 | $500 | $5,000 | 2% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 9 CY | $485 | $649 | $1,634 | $800 | $770 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,000 | $2,100 | $6,304 | $8,000 | $5,000 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1 1/4") | 197 SY | $16.00 | $30.00 | $43.83 | $31.50 | $35.00 | 1% |
| 621E00100 RPM | 6 EACH | $500 | $500 | $642 | $525 | $590 | 1% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 7 CY | $400 | $757 | $1,304 | $800 | $900 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $8,000 | $3,002 | $2,500 | $3,600 | 1% |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $1,200 | $6,000 | $1,201 | $1,500 | $2,100 | 1% |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 239 SY | $9.00 | $17.50 | $12.61 | $10.00 | $7.00 | 1% |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| 304E20000 AGGREGATE BASE | 11 CY | $150 | $150 | $115 | $195 | $310 |
| 407E10000 TACK COAT | 21 GAL | $6.00 | $5.00 | $4.20 | $5.00 | $6.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 9 GAL | $8.00 | $160 | $18.01 | $115 | $190 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 6 EACH | $33.00 | $40.00 | $14.41 | $25.00 | $220 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 5 EACH | $13.00 | $12.50 | $15.37 | $11.00 | $15.00 |
| 646E10010 EDGE LINE, 6" | 0.04 MILE | $50,000 | $50,000 | $60,036 | $86,000 | $59,000 |
| 646E10200 CENTER LINE | 0.04 MILE | $50,000 | $50,000 | $60,036 | $86,000 | $59,000 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.04 MILE | $14,500 | $14,450 | $17,350 | $16,000 | $17,000 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.04 MILE | $14,500 | $14,450 | $17,350 | $16,000 | $17,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00200 STEEL PILES HP12X53, FURNISHED | 1,285 FT | $38 | $49k | 18% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 500 FT | $80 | $40k | 15% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $33,500 | $34k | 12% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 750 FT | $44 | $33k | 12% |
| 524E95000 DRILLED SHAFTS, MISC.:PLUG PILE, 24" DIAMETER, UNR | 430 FT | $69 | $30k | 11% |
| 624E10000 MOBILIZATION | 1 LS | $12,000 | $12k | 4% |
| 524E95000 DRILLED SHAFTS, MISC.:PLUG PILE, 30" DIAMETER, UNR | 90 FT | $109 | $10k | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 380 FT | $23 | $9k | 3% |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 212.5 FT | $38 | $8k | 3% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,900 | $6k | 2% |