FRA-SR 161-08.66 Olentangy River Rd
FRA County · est $0.2M
Bid dateThursday, April 18—
FRA County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 45 more items below.
| Item | Quantity | R1Cap-stone & Associates INC | R2Complete General Construction Company | R3Strawser Paving CO INC | % of bid |
|---|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $32,000 | $36,000 | $37,000 | 13% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 67 CY | $390 | $385 | $500 | 11% |
| 203E10000 EXCAVATION | 212 CY | $105 | $68.00 | $100 | 9% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 69 CY | $320 | $320 | $434 | 9% |
| 630E72530 OVERHEAD SIGN SUPPORT, TYPE TC-16.22, DESIGN 9 | 1 EACH | $19,500 | $22,650 | $18,500 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $18,000 | $24,000 | $20,000 | 7% |
| 201E11000 CLEARING AND GRUBBING | 1 LS |
| Item | Quantity | R1Cap-stone & Associates INC | R2Complete General Construction Company | R3Strawser Paving CO INC |
|---|---|---|---|---|
| 202E35100 PIPE REMOVED, 24" AND UNDER | 74 FT | $35.00 | $41.00 | $25.00 |
| 202E38000 GUARDRAIL REMOVED | 25 FT | $25.00 | $2.00 | $25.00 |
| 203E20000 EMBANKMENT | 34 CY | $105 | $13.00 | $50.00 |
| 204E10000 SUBGRADE COMPACTION | 488 SY | $7.00 | $9.00 | $3.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 25 FT | $25.00 | $97.40 | $25.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $15,000 |
| $12,600 |
| $20,000 |
| 6% |
| 202E23000 PAVEMENT REMOVED | 178 SY | $70.00 | $29.00 | $20.00 | 5% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 93 CY | $130 | $108 | $268 | 5% |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 1 EACH | $8,500 | $5,875 | $8,500 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,500 | $18,000 | $15,000 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 166 SY | $44.00 | $40.00 | $58.34 | 3% |
| 304E20000 AGGREGATE BASE | 39 CY | $170 | $108 | $270 | 3% |
| 605E06000 4" BASE PIPE UNDERDRAINS | 301 FT | $22.00 | $38.00 | $30.16 | 3% |
| 611E05900 15" CONDUIT, TYPE B | 35 FT | $180 | $286 | $118 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,100 | $1,500 | $2,270 | 2% |
| 202E30000 WALK REMOVED | 2,357 SF | $2.25 | $9.00 | $2.66 | 2% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | 2% |
| 625E30707 PULL BOX, 725.08, 24", AS PER PLAN | 2 EACH | $2,250 | $2,250 | $3,100 | 2% |
| 632E26500 DETECTOR LOOP | 1 EACH | $4,250 | $4,250 | $2,700 | 2% |
| 171 SF |
| $22.00 |
| $32.00 |
| $23.76 |
| 609E28001 CURB, TYPE 7, AS PER PLAN | 31 FT | $88.00 | $121 | $86.07 |
| 659E10000 SEEDING AND MULCHING | 382 SY | $7.00 | $7.95 | $13.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.03 TON | $1,400 | $1,950 | $1,300 |
| 659E35000 WATER | 1 MGAL | $1.00 | $1.00 | $125 |
| 659E40000 MOWING | 0.1 MSF | $10,000 | $11.60 | $5,000 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 121 SY | $6.00 | $11.60 | $7.50 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $2,650 | $3,700 | $3,217 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 374 FT | $1.75 | $1.75 | $2.85 |
| 407E20000 NON-TRACKING TACK COAT | 791 GAL | $3.50 | $3.50 | $5.10 |
| 621E00100 RPM | 8 EACH | $350 | $565 | $563 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 8 EACH | $20.00 | $45.00 | $161 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 55 FT | $25.00 | $18.00 | $25.00 |
| 630E80100 SIGN, FLAT SHEET | 94 SF | $35.00 | $22.50 | $35.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $25.00 | $20.00 | $25.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $25.00 | $25.00 | $25.00 |
| 644E00400 CHANNELIZING LINE, 8" | 223 FT | $2.60 | $2.60 | $5.00 |
| 644E00500 STOP LINE | 12 FT | $12.00 | $12.00 | $20.00 |
| 644E00620 CROSSWALK LINE, 12" | 19 FT | $7.00 | $7.00 | $10.00 |
| 644E01300 LANE ARROW | 5 EACH | $200 | $200 | $125 |
| 644E01510 DOTTED LINE, 6" | 103 FT | $3.25 | $3.25 | $3.50 |
| 644E30020 REMOVAL OF PAVEMENT MARKING | 2 EACH | $400 | $400 | $250 |
| 625E25400 CONDUIT, 2", 725.04 | 3 FT | $35.00 | $35.00 | $88.00 |
| 625E29000 TRENCH | 25 FT | $15.00 | $15.00 | $77.00 |
| 632E04000 VEHICULAR SIGNAL HEAD, MISC.: RELOCATE EXISTING SI | 4 EACH | $650 | $650 | $600 |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 2 EACH | $1,000 | $1,000 | $1,650 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 2 EACH | $45.00 | $45.00 | $41.00 |
| 632E40200 SIGNAL CABLE, 2 CONDUCTOR, NO. 14 AWG | 210 FT | $3.00 | $3.00 | $3.00 |
| 632E40300 SIGNAL CABLE, 3 CONDUCTOR, NO. 14 AWG | 195 FT | $3.50 | $3.50 | $3.50 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 455 FT | $4.00 | $4.00 | $4.00 |
| 632E64020 PEDESTAL FOUNDATION | 1 EACH | $2,300 | $2,300 | $1,900 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 258 FT | $2.00 | $2.00 | $3.25 |
| 632E89600 PEDESTAL, 8' | 1 EACH | $1,600 | $1,600 | $1,775 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM: PEDE | 1 EACH | $375 | $375 | $200 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM: PEDE | 1 EACH | $1,100 | $1,100 | $200 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM: PULL | 2 EACH | $250 | $250 | $304 |
| 632E90210 REUSE OF PEDESTRIAN PUSHBUTTON | 1 EACH | $300 | $300 | $175 |
| 632E90500 SIGNALIZATION, MISC.:UNLASH & RELASH MESSENGER WIR | 100 FT | $8.50 | $8.50 | $6.00 |
| 633E99000 CONTROLLER ITEM, MISC.:WIRING UPDATES | 1 EACH | $2,200 | $2,200 | $1,200 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $100 | $85.00 | $100 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $32,000 | $32k | 10% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 67 CY | $390 | $26k | 9% |
| 203E10000 EXCAVATION | 212 CY | $105 | $22k | 7% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 69 CY | $320 | $22k | 7% |
| 630E72530 OVERHEAD SIGN SUPPORT, TYPE TC-16.22, DESIGN 9 | 1 EACH | $19,500 | $20k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $18,000 | $18k | 6% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $15,000 | $15k | 5% |
| 202E23000 PAVEMENT REMOVED | 178 SY | $70 | $12k | 4% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 93 CY | $130 | $12k | 4% |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 1 EACH | $8,500 | $9k | 3% |