| Item | Quantity | R1Dennison Bridge INC | R2Ohio-west Virginia Excavating CO | R3Alan Stone CO INC | R4Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|---|
| 507E00200 STEEL PILES HP12X53, FURNISHED | 1,975 FT | $37.00 | $39.00 | $39.00 | $41.00 | 16% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 1,207 FT | $50.00 | $40.00 | $58.00 | $54.00 | 13% |
| 530E51010 SPECIAL - RETAINING WALL, PRECAST CONCRETE LAGGING | 2,100 SF | $20.00 | $24.50 | $25.00 | $33.00 | 9% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 568 FT | $70.00 | $90.00 | $75.00 | $98.00 | 9% |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 196 SY | $195 | $215 | $165 | $220 | 8% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 96 CY | $388 | $250 | $300 |
| Item | Quantity | R1Dennison Bridge INC | R2Ohio-west Virginia Excavating CO | R3Alan Stone CO INC | R4Shelly & Sands INC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $100 | $4,500 | $6,700 | $1,000 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 35 FT | $20.00 | $50.00 | $10.00 | $6.00 |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 450 FT | $2.00 | $8.00 | $4.00 | $12.00 |
| 203E20000 EMBANKMENT | 175 CY | $20.00 | $9.00 | $32.20 | $25.00 |
| 203E98300 ROADWAY, MISC.: CHANNEL SHAPING |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $430 |
| 8% |
| 304E20000 AGGREGATE BASE | 249 CY | $100 | $110 | $102 | $115 | 5% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 52 CY | $350 | $370 | $400 | $500 | 4% |
| 202E23000 PAVEMENT REMOVED | 639 SY | $25.00 | $20.00 | $20.00 | $28.00 | 3% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (27 CY | $555 | $330 | $440 | $430 | 3% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 20 CY | $713 | $380 | $500 | $720 | 3% |
| 606E15151 GUARDRAIL, TYPE MGS HALF POST SPACING, AS PER PLAN | 375 FT | $36.00 | $35.00 | $45.00 | $40.00 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 650 FT | $18.00 | $22.00 | $24.00 | $32.00 | 3% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 117 CY | $100 | $125 | $260 | $225 | 3% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 659 CY | $14.00 | $40.00 | $40.00 | $20.00 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $9,000 | $17,300 | $31,600 | $20,000 | 2% |
| 611E05900 15" CONDUIT, TYPE B | 40 FT | $200 | $155 | $220 | $275 | 2% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $7,500 | $37,000 | $55,000 | $34,965 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,000 | $10,000 | $7,000 | $4,300 | 1% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,800 | $3,500 | $2,450 | $2,400 | 1% |
| 400 FT |
| $10.00 |
| $4.00 |
| $8.00 |
| $7.00 |
| 204E10000 SUBGRADE COMPACTION | 613 SY | $3.00 | $2.00 | $4.62 | $9.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | — | $2,500 | $2,400 | $2,632 | $2,750 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 537 SY | $5.00 | $6.00 | $8.87 | $6.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.6 CY | $2,250 | $5,300 | $2,495 | $1,800 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $3,000 | $2,200 | $4,000 | $4,500 |
| 611E99711 PRECAST REINFORCED CONCRETE OUTLET, AS PER PLAN | 1 EACH | $400 | $500 | $390 | $500 |
| 407E10000 TACK COAT | 63 GAL | $4.00 | $5.00 | $4.00 | $3.50 |
| 408E10001 PRIME COAT, AS PER PLAN | 41 GAL | $25.00 | $5.00 | $5.00 | $12.00 |
| 621E00100 RPM | 12 EACH | $240 | $350 | $233 | $350 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 12 EACH | $20.00 | $50.00 | $24.15 | $20.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, (BIDIRECTIONAL) | 14 EACH | $10.00 | $10.00 | $13.33 | $12.00 |
| 646E10010 EDGE LINE, 6" | 0.16 MILE | $18,000 | $4,500 | $27,000 | $14,500 |
| 646E10200 CENTER LINE | 0.08 MILE | $18,000 | $8,400 | $20,089 | $21,500 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.08 MILE | $10,000 | $9,300 | $6,246 | $9,250 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.16 MILE | $5,000 | $15,000 | $13,294 | $14,850 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.16 MILE | $7,500 | $4,600 | $5,024 | $4,550 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.32 MILE | $7,500 | $10,000 | $9,431 | $9,950 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 44 FT | $10.00 | $14.00 | $15.00 | $14.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 350 FT | $10.00 | $3.00 | $9.50 | $3.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 6 FT | $20.00 | $20.00 | $25.00 | $50.00 |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $1,200 | $1,200 | $500 | $5,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,500 | $5,000 | $8,700 | $8,200 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00200 STEEL PILES HP12X53, FURNISHED | 1,975 FT | $37 | $73k | 14% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 1,207 FT | $50 | $60k | 12% |
| 530E51010 SPECIAL - RETAINING WALL, PRECAST CONCRETE LAGGING | 2,100 SF | $20 | $42k | 8% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 568 FT | $70 | $40k | 8% |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 196 SY | $195 | $38k | 8% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 96 CY | $388 | $37k | 7% |
| 304E20000 AGGREGATE BASE | 249 CY | $100 | $25k | 5% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 52 CY | $350 | $18k | 4% |
| 202E23000 PAVEMENT REMOVED | 639 SY | $25 | $16k | 3% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (27 CY | $555 | $15k | 3% |