HAS-US 22-05.43
HAS County · est $0.5M
Bid dateThursday, May 9—
HAS County · est $0.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 26 more items below.
| Item | Quantity | R1Dennison Bridge INC | R2Alan Stone CO INC | R3Ohio-west Virginia Excavating CO | R4Shelly & Sands INC | R5Craig Edward Susany INC | % of bid |
|---|---|---|---|---|---|---|---|
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 2,194 FT | $55.00 | $72.00 | $70.90 | $68.00 | $100 | 31% |
| 507E00400 STEEL PILES, MISC.: W16x40 STEEL BEAMS, FURNISHED | 2,685 FT | $37.00 | $30.00 | $29.20 | $31.00 | $40.00 | 25% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 36" DIAMETER, UN | 450 FT | $95.00 | $90.00 | $102 | $125 | $153 | 11% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 368 FT | $75.00 | $75.00 | $71.90 | $100 | $100 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $17,000 | $25,000 | $35,000 | $10,185 | $10,000 | 4% |
| 606E15200 |
| Item | Quantity | R1Dennison Bridge INC | R2Alan Stone CO INC | R3Ohio-west Virginia Excavating CO | R4Shelly & Sands INC | R5Craig Edward Susany INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $500 | $2,000 | $3,200 | $3,000 | $100 |
| 202E38000 GUARDRAIL REMOVED | 300 FT | $3.00 | $4.50 | $3.84 | $2.40 | $5.00 |
| 203E10000 EXCAVATION | 13 CY | $25.00 | $45.00 | $70.00 | $65.00 | $40.00 |
| 203E20000 EMBANKMENT | 52 CY | $30.00 | $10.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 300 FT |
| $40.00 |
| $45.00 |
| $39.00 |
| $36.40 |
| $75.00 |
| 3% |
| 624E10000 MOBILIZATION | 1 LS | $11,000 | $18,500 | $25,100 | $20,000 | $20,000 | 3% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (17 CY | $540 | $450 | $270 | $575 | $1,000 | 2% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 12 CY | $700 | $670 | $344 | $700 | $1,000 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 344 SY | $19.00 | $25.00 | $9.50 | $25.00 | $17.50 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $1,200 | $750 | $3,725 | $4,800 | $1,600 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,500 | $4,500 | $7,026 | $3,800 | $150 | 1% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,600 | $2,600 | $3,125 | $2,920 | $3,000 | 1% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 290 FT | $16.00 | $25.00 | $38.15 | $45.00 | $30.00 | 1% |
| 621E00100 RPM | 7 EACH | $500 | $440 | $415 | $475 | $500 | 1% |
| 304E20000 AGGREGATE BASE | 27 CY | $125 | $160 | $101 | $145 | $150 | 1% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 2 EACH | $1,500 | $2,500 | $1,875 | $9,000 | $20,000 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $10,000 | $2,400 | $6,000 | $6,000 | 1% |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.22 MILE | $11,000 | $12,000 | $11,000 | $10,250 | $11,000 | 1% |
| 659E10000 SEEDING AND MULCHING | 233 SY | $10.00 | $10.00 | $12.80 | $17.00 | $7.00 | 1% |
| $48.00 |
| $25.00 |
| $50.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $120 | $161 | $125 | $20.00 |
| 659E00300 TOPSOIL | 26 CY | $45.00 | $25.00 | $161 | $65.00 | $50.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 12 SY | $10.00 | $25.00 | $12.80 | $9.00 | $7.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.03 TON | $1,500 | $1,200 | $1,400 | $961 | $1,000 |
| 659E31000 LIME | 0.05 ACRE | $200 | $950 | $161 | $155 | $300 |
| 659E35000 WATER | 5 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 407E10000 TACK COAT | 48 GAL | $6.00 | $4.00 | $4.80 | $4.00 | $4.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 48 GAL | $25.00 | $4.50 | $4.80 | $25.00 | $25.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 7 EACH | $20.00 | $30.00 | $31.00 | $35.00 | $10.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 6 EACH | $13.00 | $10.00 | $16.00 | $15.00 | $10.00 |
| 646E10010 EDGE LINE, 6" | 0.05 MILE | $3,000 | $77,000 | $73,847 | $55,580 | $35,000 |
| 646E10200 CENTER LINE | 0.05 MILE | $3,900 | $85,000 | $81,400 | $74,110 | $35,000 |
| 614E11630 INCREASED BARRIER DELINEATION | 290 FT | $1.50 | $2.00 | $1.70 | $0.50 | $2.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $180 | $400 | $837 | $325 | $700 |
| 614E13312 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 12 EACH | $25.00 | $10.00 | $40.00 | $12.00 | $40.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 19 EACH | $30.00 | $35.00 | $34.00 | $14.00 | $35.00 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.18 MILE | $8,000 | $15,000 | $14,400 | $13,325 | $14,000 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.05 MILE | $12,000 | $12,000 | $11,800 | $11,075 | $12,000 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.05 MILE | $12,000 | $12,000 | $11,800 | $10,950 | $12,000 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 24 FT | $20.00 | $15.00 | $15.00 | $14.00 | $16.00 |
| 616E10000 WATER | 5 MGAL | $1.00 | $0.20 | $1.00 | $32.00 | $1.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 2,194 FT | $55 | $121k | 30% |
| 507E00400 STEEL PILES, MISC.: W16x40 STEEL BEAMS, FURNISHED | 2,685 FT | $37 | $99k | 24% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 36" DIAMETER, UN | 450 FT | $95 | $43k | 10% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 368 FT | $75 | $28k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $17,000 | $17k | 4% |
| 606E15200 GUARDRAIL, TYPE MGS HALF POST SPACING WITH LONG PO | 300 FT | $40 | $12k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $11,000 | $11k | 3% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (17 CY | $540 | $9k | 2% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 12 CY | $700 | $8k | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 344 SY | $19 | $7k | 2% |