630E02101GROUND MOUNTED SUPPORT, NO. 2 POST, AS PER PLAN
38,726 FT
$8.25
$9.40
$6.13
28%
630E03101GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN
29,513 FT
$10.00
$9.50
$6.88
26%
630E08600SIGN POST REFLECTOR
1,566 EACH
$35.00
$30.00
$15.00
5%
630E86002REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA
3,589 EACH
$13.50
$12.00
$42.00
4%
630E84900REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL
4,864 EACH
$6.00
$8.00
$20.70
3%
624E10000MOBILIZATION
1 LS
Project details
Description
KNO-Flat Sheet Signs 2024
Type of work
Safety
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
$16,250
$20,000
$40,000
1%
630E79500SIGN SUPPORT ASSEMBLY, POLE MOUNTED
106 EACH
$125
$100
$138
1%
630E97700SIGNING, MISC.:SOLAR POWERED LED ENHANCED SIGN
2 EACH
$5,280
$2,000
$2,485
1%
630E80600SIGN, DOUBLE FACED, MILE MARKER
237 EACH
$40.00
$35.00
$60.00
1%
614E11000MAINTAINING TRAFFIC
1 LS
$7,700
$2,500
$169,400
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$6,316
$7,500
$4,889
1%
630E87500REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL
108 EACH
$20.00
$12.00
$51.25
0%
630E85400REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL
8 EACH
$145
$100
$149
0%
630E03101GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN
29,513 FT
$10
$295k
26%
630E08600SIGN POST REFLECTOR
1,566 EACH
$35
$55k
5%
630E86002REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA
3,589 EACH
$13.5
$48k
4%
630E84900REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL
4,864 EACH
$6
$29k
3%
624E10000MOBILIZATION
1 LS
$16,250
$16k
1%
630E79500SIGN SUPPORT ASSEMBLY, POLE MOUNTED
106 EACH
$125
$13k
1%
630E97700SIGNING, MISC.:SOLAR POWERED LED ENHANCED SIGN