D02-LG FY2025
D02 County · est $0.8M
Bid dateThursday, August 22—
D02 County · est $0.8M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 38 more items below.
| Item | Quantity | R1J Ranck Electric INC | R2Fet Construction Services LLC | R3U S Utility Contractor Company | % of bid |
|---|---|---|---|---|---|
| 625E98000 LIGHTING, MISC.:CIRCUIT LOCATING | 100 EACH | $1,450 | $584 | $497 | 15% |
| 625E98000 LIGHTING, MISC.:ANNUAL OPERATION AND INSPECTION OF | 250 EACH | $525 | $146 | $569 | 14% |
| 625E50100 TROUBLESHOOTING UNDERGROUND AND ABOVE GROUND CIRCU | 75 EACH | $1,200 | $2,335 | $606 | 9% |
| 809E20020 MICRO-DUCT PATHWAY, 4 CELL 14/10 | 11,850 FT | $7.25 | $5.40 | $16.87 | 9% |
| 809E22000 MICRO-DUCT PATHWAY, JACKED OR DRILLED, 4 CELL 14/1 | 2,035 FT | $27.00 | $27.90 | $36.07 | 6% |
| 614E18000 MAINTAINING TRAFFIC, MISC.:SHOULDER CLOSURE | 50 EACH | $1,000 | $2,331 | $2,459 | 5% |
| 625E18600 BRACKET ARM, MISC.:BRACKET ARM |
| Item | Quantity | R1J Ranck Electric INC | R2Fet Construction Services LLC | R3U S Utility Contractor Company |
|---|---|---|---|---|
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 625E00450 CONNECTION, FUSED PULL APART | 20 EACH | $200 | $177 | $134 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 20 EACH | $175 | $166 | $121 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 20 EACH | $150 | $161 | $134 |
| 625E02500 TRANSFORMER BASE, TYPE AT-A | 10 EACH | $925 | $1,341 | $758 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 15 EACH |
| $3,300 |
| $2,302 |
| $2,441 |
| 5% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $48,000 | $23,468 | $43,125 | 5% |
| 625E10504 ERECTING REUSABLE DOWNED LIGHT POLE, CONVENTIONAL | 20 EACH | $2,325 | $2,630 | $921 | 5% |
| 614E18000 MAINTAINING TRAFFIC, MISC.:SINGLE LANE CLOSURE | 24 EACH | $1,500 | $4,087 | $4,290 | 4% |
| 625E27503 LUMINAIRE, UNDERPASS, SOLID STATE | 40 EACH | $775 | $1,097 | $1,437 | 3% |
| 625E26273 LUMINAIRE, LOW MAST, SOLID STATE | 20 EACH | $1,525 | $1,089 | $1,612 | 3% |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE | 50 EACH | $600 | $478 | $793 | 3% |
| 625E10503 LIGHT POLE | 10 EACH | $2,500 | $1,359 | $778 | 3% |
| 809E02000 32" ITS PULL BOX WITH PAD AND STANDARD LID ASSEMBL | 8 EACH | $3,100 | $2,616 | $4,257 | 3% |
| 614E18000 MAINTAINING TRAFFIC, MISC.:DOUBLE LANE CLOSURE | 12 EACH | $2,000 | $4,941 | $5,181 | 2% |
| 624E15001 MOBILIZATION, AS PER PLAN, EMERGENCY RESPONSE - KN | 10 EACH | $1,750 | $5,253 | $1,190 | 2% |
| 809E02002 32" ITS PULL BOX WITH PAD AND HINGED LID ASSEMBLY | 5 EACH | $3,425 | $3,620 | $4,625 | 2% |
| 625E26263 LUMINAIRE, HIGH MAST, SOLID STATE | 10 EACH | $1,700 | $1,553 | $2,212 | 2% |
| 625E14501 LIGHT POLE FOUNDATION, AS PER PLAN | 5 EACH | $2,500 | $1,952 | $1,986 | 1% |
| 625E02600 TRANSFORMER BASE, TYPE AT-C | 10 EACH | $1,225 | $1,589 | $1,034 |
| 625E10503 LIGHT POLE | 1 EACH | $2,500 | $1,671 | $778 |
| 625E10504 ERECTING REUSABLE DOWNED LIGHT POLE, LOW MAST | 5 EACH | $2,325 | $2,942 | $921 |
| 625E23201 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE, AS PER PLA | 500 FT | $4.00 | $4.20 | $6.05 |
| 625E23401 NO. 10 AWG POLE AND BRACKET CABLE, AS PER PLAN | 1,000 FT | $1.50 | $1.40 | $2.59 |
| 625E25300 CONDUIT, 1-1/2", 725.04 | 25 FT | $35.00 | $32.20 | $14.84 |
| 625E25400 CONDUIT, 2", 725.04 | 20 FT | $40.00 | $46.80 | $19.30 |
| 625E25402 CONDUIT, 2", 725.05 | 20 FT | $10.00 | $14.80 | $6.21 |
| 625E25500 CONDUIT, 3", 725.04 | 20 FT | $70.00 | $81.50 | $31.95 |
| 625E25502 CONDUIT, 3", 725.05 | 20 FT | $20.00 | $17.40 | $8.28 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 50 FT | $250 | $52.70 | $58.75 |
| 625E27561 LUMINAIRE, INSTALLATION ONLY, AS PER PLAN | 10 EACH | $250 | $584 | $366 |
| 625E27600 LUMINAIRE, MISC.:LED NAVIGATIONAL LIGHT FIXTURE | 6 EACH | $1,800 | $2,025 | $3,778 |
| 625E28001 GLARE SHIELD, AS PER PLAN | 2 EACH | $325 | $182 | $373 |
| 625E31506 PULL BOX REMOVED AND REPLACED | 1 EACH | $2,000 | $1,324 | $1,084 |
| 625E32001 GROUND ROD, AS PER PLAN | 2 EACH | $400 | $447 | $413 |
| 625E33100 CIRCUIT BREAKER, TOWER LIGHTING, 30 AMP, 480 VAC | 5 EACH | $275 | $989 | $1,170 |
| 625E34450 CONTROL CENTER CABINET, COMPLETE, 100 AMP | 1 EACH | $7,000 | $11,997 | $2,925 |
| 625E34450 CONTROL CENTER CABINET, COMPLETE, 30 AMP | 1 EACH | $7,000 | $9,926 | $2,925 |
| 625E34450 CONTROL CENTER CABINET, COMPLETE, 60 AMP | 1 EACH | $7,000 | $10,016 | $2,925 |
| 625E50401 REPAIR INTEGRAL LUMINAIRE LOWERING MECHANISM OF TO | 1 EACH | $4,000 | $3,890 | $2,783 |
| 625E50451 SECONDARY SURGE PROTECTOR, AS PER PLAN, | 1 EACH | $625 | $843 | $303 |
| 625E70000 LIGHTING CONTACTOR, 100 AMP | 2 EACH | $850 | $3,641 | $901 |
| 625E70000 LIGHTING CONTACTOR, 60 AMP | 2 EACH | $700 | $3,641 | $901 |
| 625E75351 LIGHT TOWER REMOVED, AS PER PLAN | 1 EACH | $12,000 | $4,601 | $6,045 |
| 625E75401 LIGHT POLE REMOVED, AS PER PLAN | 1 EACH | $500 | $730 | $566 |
| 625E98000 LIGHTING, MISC.:PHOTOCELL, 30 AMP | 1 EACH | $650 | $323 | $326 |
| 625E98000 LIGHTING, MISC.:PHOTOCELL, 60 AMP | 2 EACH | $950 | $323 | $326 |
| 632E64021 PEDESTAL FOUNDATION, AS PER PLAN | 2 EACH | $2,000 | $1,060 | $1,679 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $60.00 | $93.30 | $97.75 |
| 614E18000 MAINTAINING TRAFFIC, MISC.:RAMP CLOSURE | 12 EACH | $1,000 | $1,942 | $2,054 |
| 614E18000 MAINTAINING TRAFFIC, MISC.:ROUNDABOUT CLOSURE | 4 EACH | $1,500 | $3,584 | $3,869 |
| 624E15001 MOBILIZATION, AS PER PLAN, EMERGENCY RESPONSE - KN | 1 EACH | $2,500 | $8,059 | $1,190 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 625E98000 LIGHTING, MISC.:CIRCUIT LOCATING | 100 EACH | $1,450 | $145k | 13% |
| 625E98000 LIGHTING, MISC.:ANNUAL OPERATION AND INSPECTION OF | 250 EACH | $525 | $131k | 12% |
| 625E50100 TROUBLESHOOTING UNDERGROUND AND ABOVE GROUND CIRCU | 75 EACH | $1,200 | $90k | 8% |
| 809E20020 MICRO-DUCT PATHWAY, 4 CELL 14/10 | 11,850 FT | $7.25 | $86k | 8% |
| 809E22000 MICRO-DUCT PATHWAY, JACKED OR DRILLED, 4 CELL 14/1 | 2,035 FT | $27 | $55k | 5% |
| 614E18000 MAINTAINING TRAFFIC, MISC.:SHOULDER CLOSURE | 50 EACH | $1,000 | $50k | 4% |
| 625E18600 BRACKET ARM, MISC.:BRACKET ARM | 15 EACH | $3,300 | $50k | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $48,000 | $48k | 4% |
| 625E10504 ERECTING REUSABLE DOWNED LIGHT POLE, CONVENTIONAL | 20 EACH | $2,325 | $47k | 4% |
| 614E18000 MAINTAINING TRAFFIC, MISC.:SINGLE LANE CLOSURE | 24 EACH | $1,500 | $36k | 3% |