D06-Wrong Way Detection
D06 County · est $3.1M
Bid dateThursday, October 31—
D06 County · est $3.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 73 more items below.
| Item | Quantity | R1Ruhlin Company | R2Complete General Construction Company | R3Miller Cable Company | R4Kokosing Construction Company INC | R5Bruce & Merrilees Electric CO INC | R6Perram Electric INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 809E65001 ITS CABINET - GROUND MOUNTED, AS PER PLAN | 27 EACH | $15,070 | $15,000 | $14,200 | $17,000 | $14,873 | $20,591 | 20% |
| 809E02000 32" ITS PULL BOX WITH PAD AND STANDARD LID ASSEMBL | 61 EACH | $3,250 | $3,900 | $4,000 | $5,700 | $3,248 | $4,837 | 10% |
| 809E60070 CCTV IP-CAMERA SYSTEM, WRONG WAY DETECTION | 32 EACH | $4,140 | $3,900 |
| Item | Quantity | R1Ruhlin Company | R2Complete General Construction Company | R3Miller Cable Company | R4Kokosing Construction Company INC | R5Bruce & Merrilees Electric CO INC | R6Perram Electric INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $9,500 | $28,000 | $2,300 | $23,628 | $14,940 |
| 202E42206 ANCHOR ASSEMBLY REMOVED | 1 EACH | $100 | $145 | $145 | $145 | $200 | $700 |
| 606E15050 GUARDRAIL, TYPE MGS | 350 FT | $21.00 | $22.40 | $23.00 | $22.40 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $4,000 |
| $5,500 |
| $4,885 |
| $4,819 |
| 6% |
| 804E32060 DROP CABLE, 24 FIBER | 35,336 FT | $3.70 | $6.25 | $6.00 | $4.20 | $7.18 | $2.93 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $125,000 | $100,000 | $100,000 | $112,208 | $167,130 | $100,000 | 6% |
| 809E25000 CONDUIT, MULTICELL, MISC.:,CONDUIT, MULTICELL, JAC | 2,163 FT | $54.00 | $47.00 | $53.00 | $81.00 | $91.68 | $70.45 | 6% |
| 809E61002 CCTV CONCRETE POLE, 70 FEET | 2 EACH | $53,700 | $42,000 | $42,000 | $57,000 | $56,817 | $52,668 | 5% |
| 804E34022 FIBER TERMINATION PANEL, 24 FIBER | 27 EACH | $3,025 | $1,987 | $1,600 | $5,500 | $3,772 | $4,658 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $80,090 | $55,000 | $162,811 | $58,000 | $159,989 | $195,405 | 4% |
| 809E24500 CONDUIT, 4", MULTICELL, HDPE WITH 4 - 1? INNERDUCT | 3,887 FT | $19.50 | $20.00 | $20.00 | $13.00 | $24.44 | $57.77 | 4% |
| 632E86120 STRAIN POLE, TYPE TC-81.11, DESIGN 8 | 8 EACH | $8,950 | $8,800 | $9,000 | $13,000 | $11,708 | $8,447 | 3% |
| 625E30700 PULL BOX, 725.08, 18" | 48 EACH | $1,395 | $1,550 | $1,000 | $1,500 | $1,456 | $1,857 | 3% |
| 625E29010 TRENCH, 30" DEEP | 5,126 FT | $12.50 | $11.00 | $8.00 | $15.00 | $10.60 | $18.95 | 3% |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 4,662.5 FT | $13.00 | $13.50 | $15.00 | $13.50 | $14.00 | $20.95 | 3% |
| 659E00300 TOPSOIL | 515 CY | $116 | $50.00 | $49.00 | $77.00 | $212 | $30.00 | 3% |
| 632E64000 STRAIN POLE FOUNDATION | 9 EACH | $6,525 | $8,300 | $7,200 | $7,000 | $6,751 | $7,119 | 3% |
| 625E25900 CONDUIT, JACKED OR DRILLED, 725.04, 3", AS PER PLA | 741 FT | $77.00 | $55.00 | $55.00 | $94.00 | $91.55 | $53.55 | 3% |
| 632E64951 TEST HOLE PERFORMED, AS PER PLAN, CONDUIT, AS PER | 44 EACH | $1,200 | $1,225 | $180 | $300 | $722 | $2,500 | 3% |
| 630E80100 SIGN, FLAT SHEET | 4,186.9 SF | $12.50 | $12.50 | $13.00 | $12.50 | $13.00 | $24.42 | 3% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 480 HOUR | $100 | $95.00 | $88.00 | $135 | $150 | $102 | 2% |
| $23.60 |
| $35.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 1 EACH | $2,600 | $2,580 | $2,580 | $2,580 | $2,820 | $4,500 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,250 | $1,360 | $1,360 | $1,360 | $1,450 | $1,900 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 4,490 SY | $5.00 | $2.90 | $3.00 | $3.50 | $3.95 | $3.00 |
| 659E00530 SEEDING AND MULCHING, CLASS 3B | 141 SY | $20.00 | $5.50 | $6.00 | $5.00 | $5.99 | $3.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.4 TON | $1,250 | $590 | $600 | $1,000 | $999 | $1,000 |
| 659E31000 LIME | 1 ACRE | $150 | $100 | $100 | $100 | $499 | $200 |
| 659E35000 WATER | 12.5 MGAL | $1.00 | $1.00 | $1.00 | $10.00 | $1.00 | $5.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 75 CY | $117 | $116 | $85.00 | $180 | $363 | $280 |
| 621E00101 RPM, AS PER PLAN (WHITE/RED) | 737 EACH | $65.00 | $55.00 | $55.00 | $55.00 | $58.00 | $68.15 |
| 621E00101 RPM, AS PER PLAN (YELLOW/RED) | 330 EACH | $65.00 | $58.00 | $58.00 | $58.00 | $63.00 | $68.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 891 EACH | $20.00 | $30.00 | $35.00 | $22.00 | $21.99 | $30.00 |
| 630E08600 SIGN POST REFLECTOR | 292 EACH | $45.00 | $45.00 | $45.00 | $45.00 | $45.00 | $58.25 |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 1 EACH | $545 | $545 | $545 | $545 | $595 | $599 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 6 EACH | $195 | $195 | $205 | $195 | $200 | $150 |
| 630E79610 SIGN SUPPORT ASSEMBLY, BARRIER MOUNTED | 3 EACH | $1,585 | $1,585 | $1,585 | $1,585 | $1,635 | $2,538 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 261 EACH | $10.00 | $10.00 | $10.00 | $10.00 | $15.00 | $19.85 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $65.00 | $65.00 | $65.00 | $65.00 | $70.00 | $199 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 237 EACH | $15.00 | $15.00 | $15.00 | $15.00 | $19.00 | $20.15 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 4 EACH | $35.00 | $35.00 | $35.00 | $35.00 | $36.00 | $49.75 |
| 644E00104 EDGE LINE, 6" (YELLOW) | 0.15 MILE | $35,000 | $14,500 | $15,000 | $14,500 | $35,000 | $14,500 |
| 644E00300 CENTER LINE | 0.04 MILE | $50,000 | $35,000 | $40,000 | $35,000 | $50,000 | $35,000 |
| 644E00404 CHANNELIZING LINE, 12" | 90 FT | $10.00 | $6.00 | $6.00 | $6.00 | $10.00 | $6.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE (YELLOW) | 165 FT | $15.00 | $12.50 | $13.00 | $12.50 | $15.00 | $12.50 |
| 644E00900 ISLAND MARKING (YELLOW) | 400 SF | $4.00 | $6.00 | $6.00 | $6.00 | $4.00 | $6.00 |
| 644E01360 WRONG WAY ARROW | 36 EACH | $125 | $520 | $520 | $520 | $125 | $520 |
| 644E01510 DOTTED LINE, 6" (YELLOW) | 1,260 FT | $10.00 | $3.55 | $4.00 | $3.55 | $10.00 | $3.55 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 917 FT | $9.00 | $6.25 | $7.00 | $6.25 | $9.00 | $6.25 |
| 646E10010 EDGE LINE, 6" (YELLOW) | 0.06 MILE | $75,000 | $19,500 | $19,500 | $19,500 | $75,000 | $19,500 |
| 646E10600 TRANSVERSE/DIAGONAL LINE (YELLOW) | 90 FT | $30.00 | $20.00 | $20.00 | $20.00 | $30.00 | $20.00 |
| 646E10800 ISLAND MARKING (YELLOW) | 290 SF | $20.00 | $7.65 | $8.00 | $7.65 | $20.00 | $7.65 |
| 646E20320 WRONG WAY ARROW | 8 EACH | $300 | $520 | $520 | $520 | $300 | $520 |
| 646E20504 DOTTED LINE, 6" (YELLOW) | 163 FT | $30.00 | $5.00 | $5.00 | $5.00 | $30.00 | $5.00 |
| 646E50100 REMOVAL OF PAVEMENT MARKING | 143 FT | $9.00 | $6.25 | $7.00 | $6.25 | $9.00 | $6.25 |
| 804E37000 SPLICE ENCLOSURE, BUTT STYLE | 3 EACH | $2,700 | $2,328 | $2,600 | $1,800 | $5,099 | $4,212 |
| 804E37001 SPLICE ENCLOSURE, AS PER PLAN | 6 EACH | $3,500 | $2,328 | $2,200 | $3,700 | $6,081 | $4,257 |
| 809E02002 32" ITS PULL BOX WITH PAD AND HINGED LID ASSEMBLY | 4 EACH | $5,470 | $4,500 | $5,000 | $7,300 | $4,650 | $7,050 |
| 809E02006 48" ITS PULL BOX WITH PAD AND STANDARD LID ASSEMBL | 4 EACH | $5,595 | $5,200 | $6,000 | $8,500 | $4,359 | $7,794 |
| 809E51100 ITS POWER SERVICE, GROUND MOUNTED, 120/240V, 100 A | 2 EACH | $5,140 | $7,000 | $12,500 | $12,000 | $8,323 | $9,607 |
| 809E55100 ITS POWER SERVICE, POLE MOUNTED, 120/240V, 100 AMP | 6 EACH | $5,360 | $7,000 | $12,800 | $12,000 | $6,378 | $5,126 |
| 809E60040 CCTV IP-CAMERA SYSTEM, QUAD MULTI-VIEW FIXED WITH | 1 EACH | $9,550 | $8,800 | $7,700 | $9,500 | $10,875 | $12,229 |
| 809E61090 CCTV LOWERING UNIT | 2 EACH | $9,500 | $9,600 | $10,000 | $12,000 | $12,331 | $9,769 |
| 809E64550 ETHERNET CABLE, OUTDOOR-RATED | 9,301 FT | $2.00 | $2.25 | $5.00 | $1.70 | $2.23 | $2.59 |
| 809E65100 STEP-DOWN TRANSFORMER, 3KVA | 1 EACH | $1,120 | $13,800 | $6,700 | $14,000 | $3,092 | $7,461 |
| 809E70000 MAINTAINING ITS DURING CONSTRUCTION | 1 LS | $9,500 | $27,000 | $21,000 | $3,800 | $10,457 | $79,600 |
| 809E70050 AS-BUILT CONSTRUCTION PLANS | 1 LS | $2,500 | $4,000 | $18,000 | $10,000 | $112 | $15,560 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 177 EACH | $150 | $105 | $95.00 | $235 | $90.07 | $154 |
| 625E25408 CONDUIT, 2", 725.051 | 1,250 FT | $10.00 | $11.00 | $13.00 | $13.50 | $7.37 | $6.20 |
| 625E25504 CONDUIT, 3", 725.051 | 956 FT | $11.40 | $15.00 | $20.00 | $15.50 | $9.28 | $9.30 |
| 625E25910 CONDUIT CLEANED AND CABLES REMOVED | 419 FT | $1.00 | $1.00 | $1.00 | $5.00 | $5.60 | $1.90 |
| 625E31506 PULL BOX REMOVED AND REPLACED | 7 EACH | $1,770 | $1,600 | $4,400 | $1,000 | $2,087 | $7,124 |
| 625E31600 PULL BOX, MISC.:PULL BOX, 12" X 18" (COC 725.06) T | 1 EACH | $980 | $850 | $800 | $1,450 | $1,545 | $3,474 |
| 625E32000 GROUND ROD | 87 EACH | $290 | $325 | $250 | $320 | $285 | $324 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 5,126 FT | $2.00 | $1.00 | $4.00 | $1.70 | $0.14 | $1.40 |
| 632E29900 MESSENGER WIRE, 7 STRAND, 1/4" DIAMETER WITH ACCES | 1,068 FT | $6.30 | $1.76 | $6.00 | $8.50 | $11.88 | $11.25 |
| 632E64951 TEST HOLE PERFORMED, AS PER PLAN, WORK PADS AND FO | 42 EACH | $300 | $1,250 | $180 | $300 | $361 | $300 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 2,746 FT | $10.00 | $5.00 | $8.05 | $6.00 | $8.38 | $5.90 |
| 632E68400 POWER CABLE, 4 CONDUCTOR, NO. 6 AWG | 74 FT | $12.00 | $6.00 | $10.00 | $12.00 | $12.37 | $8.45 |
| 632E69320 POWER CABLE, 3 CONDUCTOR, NO. 2 AWG | 3,014 FT | $13.00 | $9.00 | $10.00 | $11.00 | $15.03 | $10.35 |
| 632E70001 POWER SERVICE, AS PER PLAN (CONNECTION TO EXISTING | 3 EACH | $5,855 | $5,400 | $900 | $5,200 | $6,148 | $5,035 |
| 632E70001 POWER SERVICE, AS PER PLAN (CONNECTION TO EXISTING | 5 EACH | $936 | $2,500 | $900 | $5,200 | $5,269 | $651 |
| 632E70001 POWER SERVICE, AS PER PLAN (EXISTING ODOT POWER SE | 7 EACH | $2,130 | $3,200 | $2,000 | $5,200 | $5,046 | $4,671 |
| 632E70001 POWER SERVICE, AS PER PLAN (EXISTING ODOT POWER SE | 5 EACH | $2,520 | $2,550 | $2,100 | $5,200 | $5,269 | $3,416 |
| 632E70001 POWER SERVICE, AS PER PLAN (NEW CITY OF COLUMBUS P | 1 EACH | $3,481 | $2,300 | $8,200 | $9,000 | $2,844 | $500 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 16 EACH | $1,610 | $1,000 | $700 | $900 | $2,343 | $698 |
| 632E70600 CONDUIT RISER, 3" DIAMETER | 3 EACH | $1,950 | $1,200 | $800 | $1,600 | $3,299 | $1,446 |
| 632E89300 WOOD POLE | 5 EACH | $1,350 | $1,500 | $1,700 | $1,700 | $3,147 | $1,637 |
| 632E90400 SIGNALIZATION, MISC.: POWER METER CABINET, TYPE I | 1 EACH | $5,320 | $6,300 | $7,700 | $8,000 | $10,896 | $7,080 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,812 | $12,700 | $28,679 | $12,000 | $21,870 | $72,971 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,500 | $22,000 | $32,425 | $10,000 | $10,000 | $69,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 809E65001 ITS CABINET - GROUND MOUNTED, AS PER PLAN | 27 EACH | $15,070 | $407k | 15% |
| 809E02000 32" ITS PULL BOX WITH PAD AND STANDARD LID ASSEMBL | 61 EACH | $3,250 | $198k | 7% |
| 809E60070 CCTV IP-CAMERA SYSTEM, WRONG WAY DETECTION | 32 EACH | $4,140 | $132k | 5% |
| 804E32060 DROP CABLE, 24 FIBER | 35,336 FT | $3.7 | $131k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $125,000 | $125k | 5% |
| 809E25000 CONDUIT, MULTICELL, MISC.:,CONDUIT, MULTICELL, JAC | 2,163 FT | $54 | $117k | 4% |
| 809E61002 CCTV CONCRETE POLE, 70 FEET | 2 EACH | $53,700 | $107k | 4% |
| 804E34022 FIBER TERMINATION PANEL, 24 FIBER | 27 EACH | $3,025 | $82k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $80,090 | $80k | 3% |
| 809E24500 CONDUIT, 4", MULTICELL, HDPE WITH 4 - 1? INNERDUCT | 3,887 FT | $19.5 | $76k | 3% |