ROS-GR-FY2025(C.R.)
ROS County · est $0.3M
Bid dateThursday, November 14—
ROS County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 2 more items below.
| Item | Quantity | R1Pdk Construction INC | R2Lake Erie Construction Company | R3M P Dory CO | % of bid |
|---|---|---|---|---|---|
| 606E13030 GUARDRAIL, TYPE 5, USING 9 FOOT POSTS | 4,187.5 FT | $18.36 | $19.00 | $20.00 | 35% |
| 606E13000 GUARDRAIL, TYPE 5 | 2,662.5 FT | $16.48 | $17.40 | $18.00 | 20% |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 34 EACH | $745 | $900 | $950 | 11% |
| 209E70000 BORROW | 500 CY | $45.00 | $61.40 | $55.00 | 10% |
| 202E38101 GUARDRAIL REMOVED FOR STORAGE, AS PER PLAN | 5,956.25 FT | $1.80 | $2.40 | $2.50 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $8,000 | $4,350 | $10,000 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,800 | $4,270 |
| Item | Quantity | R1Pdk Construction INC | R2Lake Erie Construction Company | R3M P Dory CO |
|---|---|---|---|---|
| 606E18500 GUARDRAIL POST, 9 FEET | 2 EACH | $35.00 | $65.00 | $60.00 |
| 606E20000 FLARED END SECTION | 1 EACH | $35.00 | $64.00 | $70.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $3,500 |
| 4% |
| 606E26101 ANCHOR ASSEMBLY, TYPE E, AS PER PLAN | 3 EACH | $2,300 | $2,450 | $2,450 | 3% |
| 517E72205 RAILING (DEEP BEAM RAIL WITH STEEL TUBULAR BACKUP | 56.25 FT | $109 | $140 | $105 | 3% |
| 517E76300 RAILING, MISC.: TWO W-BEAM RAILS, NESTED AND TYPE | 75 FT | $42.28 | $122 | $55.00 | 1% |
| 606E17290 GUARDRAIL, TYPE 5, LONG-SPAN | 150 FT | $20.98 | $21.00 | $28.50 | 1% |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,300 | $1,250 | $2,000 | 1% |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 2 EACH | $620 | $920 | $1,000 | 1% |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 107 EACH | $9.50 | $13.00 | $10.00 | 0% |
| 517E76300 RAILING, MISC.: TWO W-BEAM RAILS, NESTED | 37.5 FT | $22.34 | $32.00 | $30.00 | 0% |
| 209E15001 RESHAPING UNDER GUARDRAIL, AS PER PLAN | 78 STA | $10.00 | $35.00 | $25.00 | 0% |
| 202E38601 BRIDGE RAILING REMOVED FOR STORAGE, AS PER PLAN | 125 FT | $2.50 | $4.80 | $10.00 | 0% |
| 690E50000 SPECIAL - MAILBOX SUPPORT | 2 EACH | $90.00 | $175 | $75.00 | 0% |
| 606E17900 GUARDRAIL POST | 4 EACH | $25.00 | $35.00 | $50.00 | 0% |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 606E13030 GUARDRAIL, TYPE 5, USING 9 FOOT POSTS | 4,187.5 FT | $18.36 | $77k | 35% |
| 606E13000 GUARDRAIL, TYPE 5 | 2,662.5 FT | $16.48 | $44k | 20% |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 34 EACH | $745 | $25k | 11% |
| 209E70000 BORROW | 500 CY | $45 | $23k | 10% |
| 202E38101 GUARDRAIL REMOVED FOR STORAGE, AS PER PLAN | 5,956.25 FT | $1.8 | $11k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $8,000 | $8k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,800 | $8k | 4% |
| 606E26101 ANCHOR ASSEMBLY, TYPE E, AS PER PLAN | 3 EACH | $2,300 | $7k | 3% |
| 517E72205 RAILING (DEEP BEAM RAIL WITH STEEL TUBULAR BACKUP | 56.25 FT | $109 | $6k | 3% |
| 517E76300 RAILING, MISC.: TWO W-BEAM RAILS, NESTED AND TYPE | 75 FT | $42.28 | $3k | 1% |