D07-GR FY 2025
D07 County · est $0.6M
Bid dateThursday, January 16—
D07 County · est $0.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 7 more items below.
| Item | Quantity | R1Lake Erie Construction Company | R2M P Dory CO | % of bid |
|---|---|---|---|---|
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, NCHRP 350/MASH 2016 | 63 EACH | $2,650 | $2,700 | 33% |
| 606E15050 GUARDRAIL, TYPE MGS | 6,415 FT | $19.00 | $19.00 | 24% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 2,770 FT | $21.20 | $20.50 | 11% |
| 203E20000 EMBANKMENT | 515 CY | $72.20 | $55.00 | 7% |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 63 EACH | $325 | $350 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $17,500 | $15,000 | 3% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 12 EACH | $1,320 | $1,200 | 3% |
| 202E38101 GUARDRAIL REMOVED FOR STORAGE, AS PER PLAN | 5,416 FT | $2.50 | $3.50 | 3% |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B, NCHRP 350/MASH 2016 | 4 EACH | $2,575 | $2,500 | 2% |
| 832E30001 EROSION CONTROL, AS PER PLAN | 10,000 EACH | $1.00 | $1.00 | 2% |
| 202E38000 GUARDRAIL REMOVED | 4,943 FT | $2.00 | $2.50 | 2% |
| 659E00531 SEEDING AND MULCHING, CLASS 3B, AS PER PLAN | 7,784 SY | $1.25 | $2.50 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,800 | $10,000 | 1% |
| 606E17350 GUARDRAIL, TYPE MGS, 25' LONG-SPAN | 238 FT | $21.00 | $25.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,130 | $5,000 | 0% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,750 | $1,250 | 0% |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 123 FT | $14.00 | $15.00 | 0% |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BI-DIRECTIONAL | 152 EACH | $11.00 | $10.00 | 0% |
| 202E42041 ANCHOR ASSEMBLY REMOVED, TYPE T, AS PER PLAN | 6 EACH | $150 | $125 | 0% |
| 606E20050 ROUNDED END SECTION | 9 EACH | $75.00 | $50.00 | 0% |
| Item | Quantity | R1Lake Erie Construction Company | R2M P Dory CO |
|---|---|---|---|
| 202E42011 ANCHOR ASSEMBLY REMOVED, TYPE E, AS PER PLAN | 1 EACH | $195 | $250 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 4 EACH | $125 | $125 |
| 202E42051 ANCHOR ASSEMBLY REMOVED, TYPE B, AS PER PLAN | 4 EACH | $165 | $180 |
| 630E08501 STREET NAME SIGN SUPPORT, AS PER PLAN | 1 EACH | $400 | $325 |
| 630E08600 SIGN POST REFLECTOR | 9 EACH | $40.00 | $50.00 |
| 630E85101 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, AS | 13 EACH | $45.00 | $100 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 11 EACH |
| $15.00 |
| $15.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, NCHRP 350/MASH 2016 | 63 EACH | $2,650 | $167k | 32% |
| 606E15050 GUARDRAIL, TYPE MGS | 6,415 FT | $19 | $122k | 24% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 2,770 FT | $21.2 | $59k | 11% |
| 203E20000 EMBANKMENT | 515 CY | $72.2 | $37k | 7% |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 63 EACH | $325 | $20k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $17,500 | $18k | 3% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 12 EACH | $1,320 | $16k | 3% |
| 202E38101 GUARDRAIL REMOVED FOR STORAGE, AS PER PLAN | 5,416 FT | $2.5 | $14k | 3% |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B, NCHRP 350/MASH 2016 | 4 EACH | $2,575 | $10k | 2% |
| 832E30001 EROSION CONTROL, AS PER PLAN | 10,000 EACH | $1 | $10k | 2% |