LAW-SR 775-19.50
LAW County · est $0.7M
Bid dateThursday, February 27—
LAW County · est $0.7M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 26 more items below.
| Item | Quantity | R1Alan Stone CO INC | R2Allard Excavation LLC | R3Ohio-west Virginia Excavating CO | R4Cj Hughes Construction Company | R5Meridian Communications And Construction | % of bid |
|---|---|---|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: W24X104 STEEL BEAM, FURNISHED, | 1,925 FT | $100 | $145 | $138 | $149 | $311 | 28% |
| 511E71200 CONCRETE, MISC.: PRECAST REINFORCED CONCRETE LAGGI | 3,968 SF | $29.15 | $30.00 | $25.25 | $28.00 | $28.56 | 17% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 600 FT | $90.00 | $106 | $116 | $175 | $140 | 8% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 168 CY | $300 | $295 | $342 | $540 | $304 | 7% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 187 CY | $240 | $105 | $94.00 | $155 | $269 | 7% |
| 524E94703 |
| Item | Quantity | R1Alan Stone CO INC | R2Allard Excavation LLC | R3Ohio-west Virginia Excavating CO | R4Cj Hughes Construction Company | R5Meridian Communications And Construction |
|---|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 1 EACH | $460 | $216 | $2,000 | $1,200 | $400 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 44 FT | $35.00 | $631 | $51.00 | $33.00 | $93.18 |
| 203E10000 EXCAVATION | 59 CY | $30.00 | $20.00 | $50.00 | $95.00 | $31.35 |
| 203E20000 EMBANKMENT | 287 CY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 471 FT |
| $90.00 |
| $105 |
| $120 |
| $164 |
| $63.91 |
| 6% |
| 624E10000 MOBILIZATION | 1 LS | $30,000 | $50,000 | $52,500 | $7,000 | $10,000 | 4% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 93 CY | $270 | $285 | $330 | $1,080 | $288 | 4% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $23,000 | $2,690 | $9,000 | $22,500 | $5,000 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,000 | $12,838 | $17,500 | $15,000 | $12,700 | 3% |
| 253E02000 PAVEMENT REPAIR | 50 CY | $300 | $615 | $711 | $200 | $120 | 2% |
| 304E20000 AGGREGATE BASE | 146 CY | $90.00 | $95.00 | $144 | $77.00 | $63.00 | 2% |
| 202E23000 PAVEMENT REMOVED | 747 SY | $15.00 | $28.00 | $11.00 | $20.00 | $18.26 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $9,000 | $10,030 | $875 | $10,000 | $4,000 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,300 | $9,204 | $9,800 | $4,500 | $4,000 | 1% |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 482 FT | $15.00 | $20.00 | $32.00 | $27.00 | $7.93 | 1% |
| 611E05700 15" CONDUIT, TYPE A, 706.01, 707.01, 707.02, OR 70 | 36 FT | $170 | $245 | $262 | $100 | $133 | 1% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 617E10100 COMPACTED AGGREGATE | 50 CY | $100 | $76.05 | $138 | $93.00 | $69.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,600 | $6,630 | $15,000 | $7,500 | $3,132 | 1% |
| $15.00 |
| $11.00 |
| $26.00 |
| $26.00 |
| $27.00 |
| 204E10000 SUBGRADE COMPACTION | 868 SY | $4.50 | $3.00 | $4.00 | $12.50 | $0.92 |
| 204E45000 PROOF ROLLING | 1 HOUR | $220 | $245 | $275 | $500 | $200 |
| 601E34400 ROCK CHANNEL PROTECTION, WITH GROUT, TYPE C | 11 CY | $320 | $137 | $337 | $800 | $400 |
| 659E10000 SEEDING AND MULCHING | 427 SY | $5.00 | $3.00 | $9.00 | $11.50 | $17.86 |
| 659E14000 REPAIR SEEDING AND MULCHING | 22 SY | $1.00 | $0.05 | $9.00 | $18.00 | $22.73 |
| 659E20000 COMMERCIAL FERTILIZER | 0.06 TON | $1,600 | $680 | $1,400 | $34,650 | $5,000 |
| 659E31000 LIME | 0.09 ACRE | $210 | $500 | $200 | $2,500 | $4,444 |
| 659E35000 WATER | 2 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $350 |
| 602E20000 CONCRETE MASONRY | 0.3 CY | $4,700 | $6,207 | $7,600 | $7,700 | $3,000 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 9 FT | $6.50 | $20.00 | $5.00 | $60.00 | $13.33 |
| 611E00900 6" CONDUIT, TYPE B | 21 FT | $55.00 | $38.00 | $4.00 | $40.00 | $13.10 |
| 407E10000 TACK COAT | 297 GAL | $8.50 | $2.50 | $3.00 | $8.00 | $11.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 16 CY | $170 | $112 | $176 | $135 | $68.00 |
| 617E25000 WATER | 10 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $210 |
| 621E00100 RPM | 6 EACH | $520 | $500 | $550 | $730 | $630 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 6 EACH | $30.00 | $4.00 | $102 | $340 | $333 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.14 MILE | $5,400 | $5,250 | $6,000 | $12,000 | $14,750 |
| 642E00300 CENTER LINE, TYPE 1 | 0.07 MILE | $11,000 | $10,250 | $12,000 | $23,700 | $14,714 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $95.00 | $85.00 | $90.00 | $85.00 | $75.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $3,900 | $3,750 | $4,300 | $5,300 | $9,000 |
| 616E10000 WATER | 50 MGAL | $10.00 | $1.00 | $1.00 | $1.00 | $93.60 |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $1,000 | $1,500 | $1,700 | $500 | $4,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: W24X104 STEEL BEAM, FURNISHED, | 1,925 FT | $100 | $193k | 27% |
| 511E71200 CONCRETE, MISC.: PRECAST REINFORCED CONCRETE LAGGI | 3,968 SF | $29.15 | $116k | 16% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 600 FT | $90 | $54k | 7% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 168 CY | $300 | $50k | 7% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 187 CY | $240 | $45k | 6% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 471 FT | $90 | $42k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $30,000 | $30k | 4% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 93 CY | $270 | $25k | 3% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $23,000 | $23k | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,000 | $20k | 3% |