PER-MR 280-00.10 (Scotch Hill)
PER County · est $0.2M
Bid dateThursday, March 27—
PER County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 10 more items below.
| Item | Quantity | R1Axis Civil Construction LLC | R2Layton Services | R3Buds INC | R4Complete General Construction Company | R5Alan Stone CO INC | R6S E T INC | R7Double Z Construction Company | R8Baumann Enterprises INC | R9Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $42,000 | $55,470 | $79,000 | $85,000 | $64,000 | $133,000 | $150,000 | $163,000 | $210,000 | 32% |
| 203E10000 EXCAVATION | 866 CY | $32.00 | $54.00 |
| Item | Quantity | R1Axis Civil Construction LLC | R2Layton Services | R3Buds INC | R4Complete General Construction Company | R5Alan Stone CO INC | R6S E T INC | R7Double Z Construction Company | R8Baumann Enterprises INC | R9Eclipse CO LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 659E14000 REPAIR SEEDING AND MULCHING | 25 SY | $6.00 | $6.00 | $0.10 | $6.00 | $15.00 | $5.50 | $6.00 | $2.00 | $6.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.06 TON | $1,250 | $1,250 | $600 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $23.00 |
| $20.00 |
| $60.00 |
| $30.00 |
| $45.00 |
| $40.00 |
| $47.00 |
| 21% |
| 624E10000 MOBILIZATION | 1 LS | $12,000 | $4,000 | $20,000 | $9,000 | $17,000 | $15,000 | $10,000 | $10,000 | $29,233 | 9% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $7,500 | $7,000 | $15,000 | $11,000 | $8,000 | $5,000 | $16,000 | $5,000 | $6,000 | 6% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 5 EACH | $1,150 | $1,150 | $1,500 | $1,780 | $1,900 | $1,250 | $1,150 | $500 | $1,150 | 4% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 4% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 39 CY | $120 | $200 | $85.00 | $150 | $120 | $120 | $120 | $300 | $145 | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,500 | $7,000 | $4,000 | $5,000 | $7,000 | $1,500 | $5,000 | $4,000 | $6,750 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,500 | $5,000 | $4,000 | $2,000 | $5,000 | $5,000 | $2,400 | $7,812 | $7,500 | 3% |
| 653E10000 TOPSOIL FURNISHED AND PLACED | 54 CY | $58.00 | $80.00 | $20.00 | $50.00 | $45.00 | $105 | $45.00 | $60.00 | $132 | 2% |
| 659E10000 SEEDING AND MULCHING | 482 SY | $6.00 | $6.00 | $3.00 | $6.00 | $6.50 | $4.50 | $12.00 | $2.00 | $6.00 | 2% |
| 203E20000 EMBANKMENT | 239 CY | $12.00 | $23.00 | $6.00 | $35.00 | $15.00 | $18.00 | $15.00 | $40.00 | $28.50 | 2% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $2,500 | $3,500 | $5,000 | $3,000 | $5,000 | $5,500 | $4,000 | $3,500 | $6,500 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 25 FT | $86.52 | $86.55 | $40.00 | $92.80 | $50.00 | $95.00 | $86.52 | $300 | $87.00 | 2% |
| 202E23000 PAVEMENT REMOVED | 100 SY | $15.00 | $30.00 | $20.00 | $50.00 | $15.00 | $35.00 | $50.00 | $20.00 | $13.00 | 1% |
| 630E80100 SIGN, FLAT SHEET | 51.6 SF | $25.00 | $25.00 | $25.00 | $22.00 | $30.00 | $30.00 | $25.00 | $50.00 | $29.00 | 1% |
| 670E00550 SLOPE EROSION PROTECTION MAT, TYPE E | 382 SY | $3.00 | $3.00 | $3.00 | $3.00 | $5.00 | $3.60 | $3.00 | $20.00 | $3.00 | 1% |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 70 FT | $13.00 | $13.00 | $22.00 | $20.40 | $30.00 | $14.00 | $13.00 | $100 | $27.00 | 1% |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 57.6 FT | $12.00 | $12.00 | $21.00 | $18.00 | $25.00 | $13.00 | $12.00 | $200 | $24.50 | 1% |
| 202E38000 GUARDRAIL REMOVED | 53 FT | $10.00 | $50.00 | $5.00 | $5.00 | $20.00 | $5.50 | $9.00 | $20.00 | $10.00 | 0% |
| $1,250 |
| $710 |
| $1,600 |
| $1,250 |
| $4,000 |
| $1,250 |
| 659E35000 WATER | 3 MGAL | $1.00 | $1.00 | $0.50 | $1.00 | $130 | $10.00 | $1.00 | $500 | $1.00 |
| 611E01800 8" CONDUIT, TYPE B | 25 FT | $18.00 | $50.00 | $5.00 | $8.00 | $45.00 | $15.00 | $13.00 | $200 | $58.50 |
| 611E02500 8" CONDUIT, TYPE E | 25 FT | $18.00 | $20.00 | $5.00 | $8.00 | $45.00 | $7.00 | $9.00 | $200 | $41.00 |
| 611E02600 8" CONDUIT, TYPE F | 25 FT | $18.00 | $20.00 | $5.00 | $8.00 | $45.00 | $7.00 | $9.00 | $200 | $41.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, TWO-WAY | 6 EACH | $10.00 | $10.00 | $12.50 | $15.00 | $15.00 | $11.00 | $10.00 | $100 | $10.00 |
| 630E08600 SIGN POST REFLECTOR | 8 EACH | $23.00 | $23.00 | $55.00 | $45.00 | $70.00 | $28.00 | $23.00 | $200 | $75.50 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 3 EACH | $75.00 | $100 | $30.00 | $10.00 | $40.00 | $24.00 | $50.00 | $200 | $16.50 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $75.00 | $100 | $30.00 | $15.00 | $40.00 | $24.00 | $50.00 | $150 | $21.50 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $42,000 | $42k | 31% |
| 203E10000 EXCAVATION | 866 CY | $32 | $28k | 21% |
| 624E10000 MOBILIZATION | 1 LS | $12,000 | $12k | 9% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $7,500 | $8k | 6% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 5 EACH | $1,150 | $6k | 4% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1 | $5k | 4% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 39 CY | $120 | $5k | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,500 | $5k | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,500 | $4k | 3% |
| 653E10000 TOPSOIL FURNISHED AND PLACED | 54 CY | $58 | $3k | 2% |