D03-D12 Pedestrian Safety FY2025
D03 County · est $1.5M
Bid dateThursday, April 10—
D03 County · est $1.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 62 more items below.
| Item | Quantity | R1Perk Company INC | R2Madex Construction CO | % of bid |
|---|---|---|---|---|
| 608E52001 CURB RAMP, AS PER PLAN | 5,879 SF | $40.00 | $47.31 | 19% |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 2,249 FT | $68.00 | $67.70 | 12% |
| 630E97700 SIGNING, MISC.: SOLAR-POWERED RECTANGULAR RAPID FL | 19 EACH | $7,200 | $8,337 | 11% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 4,280 SF | $22.00 | $32.50 | 8% |
| 644E00630 CROSSWALK LINE, 24" | 11,427 FT | $8.00 | $9.26 | 7% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449), (8") | 163 CY | $450 | $376 | 6% |
| 644E00620 CROSSWALK LINE, 12" | 12,722 FT | $4.00 | $5.79 | 4% |
| 632E20751 ACCESSIBLE PEDESTRIAN PUSHBUTTON, AS PER PLAN | 27 EACH | $1,800 | $2,084 | 4% |
| 202E23000 PAVEMENT REMOVED | 1,845 SY | $25.00 | $31.54 | 4% |
| 632E64021 PEDESTAL FOUNDATION, AS PER PLAN | 39 EACH | $1,100 | $1,274 | 3% |
| 625E29400 TRENCH IN PAVED AREA | 318 FT | $112 | $13.89 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $34,260 | $101,127 | 3% |
| 625E25907 CONDUIT, JACKED OR DRILLED, 725.051, AS PER PLAN, | 510 FT | $65.00 | $75.26 | 3% |
| 831E00101 LONGITUDINAL CHANNELIZING DEVICE, AS PER PLAN | 360 FT | $90.00 | $104 | 3% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (38 CY | $725 | $1,447 | 2% |
| 202E30001 WALK REMOVED, AS PER PLAN | 6,024 SF | $4.50 | $6.97 | 2% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 31 CY | $765 | $1,476 | 2% |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 43 EACH | $505 | $585 | 2% |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 7,033 FT | $3.00 | $0.29 | 2% |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 6 MNTH | $3,500 | $1,765 | 2% |
| Item | Quantity | R1Perk Company INC | R2Madex Construction CO |
|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $500 | $10,322 |
| 202E30600 CONCRETE MEDIAN REMOVED | 13 SY | $100 | $127 |
| 202E30800 TRAFFIC ISLAND REMOVED | 22 SY | $60.00 | $92.29 |
| 202E32001 CURB REMOVED, AS PER PLAN | 741 FT | $16.50 | $21.61 |
| 202E38000 GUARDRAIL REMOVED | 15 FT | $20.00 | $26.76 |
| 203E10000 EXCAVATION | 10 CY | $185 | $41.19 |
| 203E20000 EMBANKMENT | 10 CY | $195 | $41.77 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 204E10000 SUBGRADE COMPACTION | 735 SY | $8.00 | $4.28 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 3 EACH | $950 | $2,065 |
| 659E00300 TOPSOIL | 5 CY | $225 | $144 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 100 SY | $44.00 | $10.58 |
| 659E10000 SEEDING AND MULCHING | 838 SY | $10.00 | $7.95 |
| 659E35000 WATER | 5 MGAL | $125 | $51.92 |
| 832E30000 EROSION CONTROL | 18,000 EACH | $1.00 | $1.00 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 10 EACH | $2,000 | $2,691 |
| 611E99700 SPECIAL - GAS VALVE BOX ADJUSTED TO GRADE | 1 EACH | $500 | $1,129 |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 75 SY | $225 | $289 |
| 304E20000 AGGREGATE BASE, (6") | 126 CY | $110 | $220 |
| 407E20000 NON-TRACKING TACK COAT, (0.055 GAL/SY) | 82 GAL | $10.00 | $11.58 |
| 609E71001 CONCRETE MEDIAN, AS PER PLAN | 162 SF | $21.00 | $69.69 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 1,274 FT | $12.00 | $22.00 |
| 630E08600 SIGN POST REFLECTOR | 100 EACH | $45.00 | $52.11 |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 2 EACH | $325 | $347 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 49 EACH | $75.00 | $214 |
| 630E80100 SIGN, FLAT SHEET | 1,471.8 SF | $14.00 | $28.95 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 13 EACH | $30.00 | $17.37 |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 15 EACH | $35.00 | $52.11 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 6 EACH | $95.00 | $75.26 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 28 EACH | $40.00 | $23.16 |
| 644E00100 EDGE LINE, 4" | 1 MILE | $4,800 | $3,474 |
| 644E00500 STOP LINE | 755 FT | $8.50 | $8.11 |
| 644E00800 CURB MARKING | 132 FT | $3.00 | $8.11 |
| 644E00900 ISLAND MARKING | 97 SF | $4.00 | $6.95 |
| 644E01300 LANE ARROW | 4 EACH | $105 | $151 |
| 644E20800 YIELD LINE | 906 FT | $15.00 | $10.42 |
| 644E30020 REMOVAL OF PAVEMENT MARKING | 4 EACH | $200 | $116 |
| 625E25408 CONDUIT, 2", 725.051 | 734 FT | $7.50 | $8.68 |
| 625E25504 CONDUIT, 3", 725.051 | 85 FT | $9.50 | $11.00 |
| 625E25907 CONDUIT, JACKED OR DRILLED, 725.051, AS PER PLAN, | 60 FT | $70.00 | $81.05 |
| 625E25907 CONDUIT, JACKED OR DRILLED, 725.051, AS PER PLAN, | 200 FT | $75.00 | $86.84 |
| 625E29000 TRENCH | 518 FT | $12.00 | $13.89 |
| 625E30700 PULL BOX, 725.08, 18" | 7 EACH | $950 | $1,100 |
| 625E31510 PULL BOX REMOVED | 2 EACH | $300 | $347 |
| 625E32000 GROUND ROD | 39 EACH | $275 | $318 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 836 FT | $3.50 | $4.05 |
| 625E39520 PULL BOX CLEANED | 20 EACH | $200 | $232 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 6,660 FT | $2.55 | $2.95 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 395 FT | $2.95 | $3.42 |
| 632E64950 TEST HOLE PERFORMED | 39 EACH | $200 | $232 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 2 EACH | $475 | $550 |
| 632E89802 PEDESTAL, 5', TRANSFORMER BASE | 2 EACH | $700 | $811 |
| 632E89900 PEDESTAL, 8', TRANSFORMER BASE | 18 EACH | $900 | $1,042 |
| 632E90500 SIGNALIZATION, MISC.: UNLASH AND RELASH MESSENGER | 150 FT | $6.00 | $6.95 |
| 633E99000 CONTROLLER ITEM, MISC.: ADD PEDESTRIAN PHASES | 10 EACH | $1,400 | $1,621 |
| 633E99000 CONTROLLER ITEM, MISC.: LOAD CONTROLLER SETTINGS | 7 EACH | $900 | $1,042 |
| 633E99000 CONTROLLER ITEM, MISC.: PEDESTRIAN LOAD SWITCH | 10 EACH | $300 | $347 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 120 HOUR | $110 | $115 |
| 616E10000 WATER | 16 MGAL | $1.00 | $37.63 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $17,370 | $166,737 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $5,000 | $17,368 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,500 | $40,526 |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $225,034 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 608E52001 CURB RAMP, AS PER PLAN | 5,879 SF | $40 | $235k | 14% |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 2,249 FT | $68 | $153k | 9% |
| 630E97700 SIGNING, MISC.: SOLAR-POWERED RECTANGULAR RAPID FL | 19 EACH | $7,200 | $137k | 8% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 4,280 SF | $22 | $94k | 6% |
| 644E00630 CROSSWALK LINE, 24" | 11,427 FT | $8 | $91k | 6% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449), (8") | 163 CY | $450 | $73k | 5% |
| 644E00620 CROSSWALK LINE, 12" | 12,722 FT | $4 | $51k | 3% |
| 632E20751 ACCESSIBLE PEDESTRIAN PUSHBUTTON, AS PER PLAN | 27 EACH | $1,800 | $49k | 3% |
| 202E23000 PAVEMENT REMOVED | 1,845 SY | $25 | $46k | 3% |
| 632E64021 PEDESTAL FOUNDATION, AS PER PLAN | 39 EACH | $1,100 | $43k | 3% |