D05-Guardrail FY2025
D05 County · est $2.2M
Bid dateThursday, April 24—
D05 County · est $2.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 21 more items below.
| Item | Quantity | R1M P Dory CO | R2Lake Erie Construction Company | R3Cuyahoga Fence LLC | % of bid |
|---|---|---|---|---|---|
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 24,400 FT | $19.50 | $19.40 | $22.50 | 27% |
| 690E98300 SPECIAL - NO MOW STRIP | 4,707 SY | $67.00 | $68.00 | $65.00 | 18% |
| 606E55010 SPECIAL - CABLE BARRIER WITH CONCRETE LINE POST FO | 10,090 FT | $19.75 | $22.00 | $28.00 | 11% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 72 EACH | $2,400 | $2,380 | $2,400 | 10% |
| 203E35111 GRANULAR MATERIAL, TYPE B, AS PER PLAN, A | 2,779 CY | $60.00 | $82.00 | $76.00 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $23,500 | $50,000 | 6% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 56 EACH | $1,000 |
| Item | Quantity | R1M P Dory CO | R2Lake Erie Construction Company | R3Cuyahoga Fence LLC |
|---|---|---|---|---|
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 48 EACH | $150 | $150 | $150 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 34 EACH | $100 | $100 | $100 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 16 EACH | $85.00 | $80.00 | $150 |
| 606E19001 GUARDRAIL POST, STEEL, AS PER PLAN, B | 65 EACH | $75.00 | $95.00 | $90.00 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 1 EACH | $1,750 | $1,520 | $1,950 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1,325 |
| $1,100 |
| 3% |
| 203E35111 GRANULAR MATERIAL, TYPE B, AS PER PLAN, B | 925 CY | $60.00 | $87.00 | $76.00 | 3% |
| 606E55150 SPECIAL - CABLE BARRIER, ANCHOR ASSEMBLY | 10 EACH | $3,750 | $3,950 | $3,500 | 2% |
| 606E98000 GUARDRAIL, MISC.: SHOULDER SUPPORT BENCHING | 6,250 FT | $6.00 | $7.00 | $7.00 | 2% |
| 670E00500 SLOPE EROSION PROTECTION | 16,432 SY | $1.50 | $2.00 | $2.00 | 1% |
| 202E38000 GUARDRAIL REMOVED | 13,200 FT | $1.80 | $1.60 | $2.00 | 1% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $20,000 | $500 | $25,000 | 1% |
| 606E19001 GUARDRAIL POST, STEEL, AS PER PLAN, A | 250 EACH | $75.00 | $65.00 | $60.00 | 1% |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 15,545 SY | $1.00 | $1.00 | $1.00 | 1% |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 51 EACH | $280 | $320 | $275 | 1% |
| 606E50000 SPECIAL - RESHAPING BERM | 25,012 FT | $0.50 | $0.10 | $0.60 | 1% |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 6,250 FT | $2.00 | $2.80 | $2.25 | 1% |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 593.75 FT | $21.00 | $22.00 | $22.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $11,500 | $6,389 | $20,000 | 1% |
| 606E34600 MGS BRIDGE TERMINAL ASSEMBLY, TYPE TST-2 | 4 EACH | $1,600 | $2,380 | $3,150 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 12 EACH | $850 | $980 | $1,100 |
| 606E98000 GUARDRAIL, MISC.: EXISTING W-BEAM FOR SHOULDER SU | 65 FT | $10.00 | $18.00 | $9.00 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 20 EACH | $45.00 | $150 | $150 |
| 204E50001 GEOTEXTILE FABRIC, AS PER PLAN | 1,388 SY | $2.00 | $2.50 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 2.09 TON | $1,275 | $300 | $1,500 |
| 659E31000 LIME | 3.21 ACRE | $158 | $50.00 | $200 |
| 659E35000 WATER | 84 MGAL | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 BI-DIRECTIONAL | 438 EACH | $10.00 | $13.10 | $10.50 |
| 626E00118 BARRIER REFLECTOR, TYPE 6 | 113 EACH | $10.00 | $15.00 | $15.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 900 FT | $8.00 | $12.50 | $11.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 79 EACH | $35.00 | $55.00 | $60.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 60 EACH | $15.00 | $15.00 | $15.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $80.00 | $60.00 | $100 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $28,500 | $25,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 24,400 FT | $19.5 | $476k | 26% |
| 690E98300 SPECIAL - NO MOW STRIP | 4,707 SY | $67 | $315k | 17% |
| 606E55010 SPECIAL - CABLE BARRIER WITH CONCRETE LINE POST FO | 10,090 FT | $19.75 | $199k | 11% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 72 EACH | $2,400 | $173k | 9% |
| 203E35111 GRANULAR MATERIAL, TYPE B, AS PER PLAN, A | 2,779 CY | $60 | $167k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 5% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 56 EACH | $1,000 | $56k | 3% |
| 203E35111 GRANULAR MATERIAL, TYPE B, AS PER PLAN, B | 925 CY | $60 | $56k | 3% |
| 606E55150 SPECIAL - CABLE BARRIER, ANCHOR ASSEMBLY | 10 EACH | $3,750 | $38k | 2% |
| 606E98000 GUARDRAIL, MISC.: SHOULDER SUPPORT BENCHING | 6,250 FT | $6 | $38k | 2% |