DEF-US 24-01.61/02.89
DEF County · est $3.3M
Bid dateThursday, April 24—
DEF County · est $3.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 60 more items below.
| Item | Quantity | R1Miller Bros Const INC | R2Vernon Nagel INC | R3Geddis Paving & Excavating INC | R4Miller Contracting Group INC | R5Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 203E20000 EMBANKMENT | 91,088 CY | $11.70 | $14.50 | $18.00 | $14.25 | $33.53 | 44% |
| 203E10000 EXCAVATION | 52,395 CY | $11.70 | $10.00 | $10.00 | $18.75 | $20.47 | 26% |
| 624E10000 MOBILIZATION | 1 LS | $130,500 | $145,000 | $100,000 | $302,000 | $82,491 | 5% |
| 601E28000 DUMPED ROCK FILL, TYPE D | 1,824 CY | $42.00 | $92.00 | $100 | $85.00 | $119 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 3,600 FT | $21.00 | $14.00 | $78.00 | $44.00 | $49.73 | 3% |
| 609E23001 COMBINATION CURB AND GUTTER, TYPE 4, AS PER PLAN | 2,240 FT |
| Item | Quantity | R1Miller Bros Const INC | R2Vernon Nagel INC | R3Geddis Paving & Excavating INC | R4Miller Contracting Group INC | R5Eclipse CO LLC |
|---|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 5 EACH | $400 | $400 | $700 | $602 | $496 |
| 202E23000 PAVEMENT REMOVED | 136 SY | $50.00 | $80.00 | $32.00 | $66.00 | $24.86 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 202 FT | $7.00 | $6.00 | $42.00 | $22.00 | $29.24 |
| 202E35200 PIPE REMOVED, OVER 24" DIAMETER | 20 FT | $40.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $24.00 |
| $30.00 |
| $40.50 |
| $27.00 |
| $45.45 |
| 2% |
| 607E15000 FENCE, TYPE 47 | 2,507 FT | $17.00 | $17.00 | $19.00 | $19.00 | $1.82 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $35,000 | $25,000 | $5,250 | $10,000 | $2,500 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,000 | $21,500 | $50,000 | $56,073 | $56,353 | 1% |
| 611E05200 12" CONDUIT, TYPE F, 707.05 TYPE C, 707.21, OR 707 | 493 FT | $70.00 | $70.00 | $120 | $67.00 | $85.35 | 1% |
| 659E10000 SEEDING AND MULCHING | 37,267 SY | $0.90 | $1.30 | $1.00 | $1.65 | $1.46 | 1% |
| 606E16050 GUARDRAIL REBUILT, TYPE MGS | 2,587.5 FT | $12.00 | $12.00 | $13.50 | $13.25 | $15.35 | 1% |
| 832E30000 EROSION CONTROL | 25,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 651E10000 TOPSOIL STOCKPILED | 4,137 CY | $6.00 | $6.50 | $3.85 | $18.00 | $22.62 | 1% |
| 652E10000 PLACING STOCKPILED TOPSOIL | 4,137 CY | $6.00 | $5.00 | $4.50 | $11.00 | $27.14 | 1% |
| 611E06700 15" CONDUIT, TYPE F, 707.05 TYPE C, 707.21, OR 707 | 317 FT | $76.00 | $100 | $120 | $73.00 | $96.30 | 1% |
| 611E20700 48" CONDUIT, TYPE A, 706.02 | 60 FT | $380 | $350 | $455 | $262 | $565 | 1% |
| 611E98180 CATCH BASIN, NO. 3A | 8 EACH | $2,800 | $3,500 | $3,000 | $2,922 | $4,709 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,500 | $28,000 | $29,300 | $38,400 | $50,000 | 1% |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $14,500 | $15,000 | $19,300 | $15,751 | $14,613 | 1% |
| $22.00 |
| $78.00 |
| $49.00 |
| $120 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 2,637.5 FT | $3.00 | $3.00 | $3.35 | $4.00 | $2.42 |
| 202E58100 CATCH BASIN REMOVED | 2 EACH | $800 | $400 | $630 | $550 | $538 |
| 202E75000 FENCE REMOVED | 2,418 FT | $3.50 | $4.00 | $3.90 | $4.00 | $2.32 |
| 204E10000 SUBGRADE COMPACTION | 872 SY | $1.00 | $1.00 | $0.50 | $3.00 | $0.94 |
| 209E10000 DITCH CLEANOUT | 478 FT | $11.00 | $15.00 | $18.50 | $8.00 | $42.64 |
| 606E35012 MGS BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 1 | 2 EACH | $850 | $850 | $950 | $926 | $2,363 |
| 606E35112 MGS BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 2 | 2 EACH | $450 | $450 | $505 | $490 | $455 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 8 EACH | $500 | $450 | $685 | $1,317 | $625 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $4,500 | $2,680 | $6,700 | $3,049 | $2,525 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $4,500 | $2,450 | $6,700 | $3,049 | $2,525 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 236 SY | $57.00 | $55.00 | $110 | $79.00 | $112 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 53 CY | $100 | $125 | $260 | $123 | $137 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $60.00 | $60.00 | $67.00 | $131 | $152 |
| 659E14000 REPAIR SEEDING AND MULCHING | 1,863 SY | $0.90 | $0.90 | $1.00 | $1.00 | $0.96 |
| 659E20000 COMMERCIAL FERTILIZER | 5.1 TON | $850 | $850 | $850 | $926 | $586 |
| 659E31000 LIME | 7.7 ACRE | $35.00 | $35.00 | $35.00 | $39.00 | $40.40 |
| 659E35000 WATER | 202 MGAL | $1.00 | $1.00 | $1.00 | $2.00 | $1.01 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,025 | $2,500 | $1,150 | $1,116 | $1,035 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $6,150 | $7,500 | $6,900 | $7,812 | $11,363 |
| 602E20000 CONCRETE MASONRY | 3.5 CY | $2,400 | $2,600 | $2,900 | $4,172 | $2,787 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 60 FT | $35.00 | $30.00 | $41.50 | $45.00 | $37.13 |
| 611E01500 6" CONDUIT, TYPE F | 20 FT | $28.00 | $12.00 | $320 | $53.00 | $45.79 |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 10 CY | $300 | $200 | $255 | $154 | $358 |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 3 CY | $1,925 | $1,925 | $3,050 | $2,096 | $1,944 |
| 304E20000 AGGREGATE BASE | 146 CY | $95.00 | $100 | $89.00 | $84.00 | $86.03 |
| 625E00450 CONNECTION, FUSED PULL APART | 2 EACH | $125 | $214 | $140 | $137 | $216 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 3 EACH | $125 | $197 | $140 | $137 | $199 |
| 625E10604 LIGHT POLE ANCHOR BOLTS, HEADED | 4 EACH | $75.00 | $238 | $84.00 | $82.00 | $241 |
| 625E14200 LIGHT POLE FOUNDATION, 24" X 10' DEEP | 1 EACH | $2,900 | $3,103 | $3,250 | $3,158 | $3,134 |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 113 FT | $13.00 | $20.35 | $14.50 | $15.00 | $20.55 |
| 625E29002 TRENCH, 24" DEEP | 103 FT | $20.00 | $17.95 | $22.50 | $22.00 | $18.13 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $1,650 | $2,040 | $1,850 | $1,797 | $2,060 |
| 625E32000 GROUND ROD | 1 EACH | $300 | $481 | $335 | $327 | $486 |
| 625E35010 REMOVE AND REERECT EXISTING LIGHT POLE | 1 EACH | $2,850 | $2,018 | $3,200 | $3,103 | $2,038 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 1 EACH | $400 | $1,206 | $450 | $436 | $1,218 |
| 625E75801 DISCONNECT CIRCUIT, AS PER PLAN | 1 EACH | $346 | $593 | $390 | $376 | $598 |
| 630E07000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W8X18 | 42 FT | $65.00 | $65.00 | $73.00 | $71.00 | $68.18 |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 41.3 FT | $50.00 | $50.00 | $56.00 | $55.00 | $50.50 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 4 EACH | $1,425 | $1,425 | $1,600 | $1,552 | $1,566 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 5 EACH | $75.00 | $75.00 | $84.00 | $82.00 | $80.80 |
| 630E85600 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND REERECTIO | 1 EACH | $425 | $425 | $475 | $463 | $556 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 3 EACH | $110 | $110 | $125 | $120 | $101 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 4 EACH | $225 | $225 | $250 | $245 | $247 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $75.00 | $90.00 | $175 | $101 | $75.75 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,047 | $2,050 | $2,300 | $2,229 | $2,067 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 4 EACH | $250 | $250 | $410 | $272 | $252 |
| 614E12600 REPLACEMENT DRUM | 10 EACH | $55.21 | $56.00 | $235 | $61.00 | $55.76 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE WAY | 72 EACH | $13.39 | $13.50 | $19.00 | $15.00 | $13.52 |
| 614E13350 OBJECT MARKER, ONE WAY | 72 EACH | $20.89 | $21.00 | $24.50 | $23.00 | $21.10 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 6 SNMT | $965 | $965 | $1,750 | $1,051 | $975 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 1.32 MILE | $9,546 | $9,550 | $10,700 | $10,393 | $9,641 |
| 614E24402 WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I | 1,560 FT | $1.38 | $1.38 | $1.55 | $2.00 | $1.39 |
| 616E10000 WATER | 287 MGAL | $5.00 | $1.00 | $10.00 | $68.00 | $27.36 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 24 SNMT | $422 | $425 | $425 | $460 | $426 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $2,150 | $1,800 | $2,000 | $1,615 | $809 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $12,400 | $28,000 | $25,000 | $20,386 | $29,018 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E20000 EMBANKMENT | 91,088 CY | $11.7 | $1.07M | 41% |
| 203E10000 EXCAVATION | 52,395 CY | $11.7 | $613k | 23% |
| 624E10000 MOBILIZATION | 1 LS | $130,500 | $131k | 5% |
| 601E28000 DUMPED ROCK FILL, TYPE D | 1,824 CY | $42 | $77k | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 3,600 FT | $21 | $76k | 3% |
| 609E23001 COMBINATION CURB AND GUTTER, TYPE 4, AS PER PLAN | 2,240 FT | $24 | $54k | 2% |
| 607E15000 FENCE, TYPE 47 | 2,507 FT | $17 | $43k | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $35,000 | $35k | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,000 | $35k | 1% |
| 611E05200 12" CONDUIT, TYPE F, 707.05 TYPE C, 707.21, OR 707 | 493 FT | $70 | $35k | 1% |