OTT-SR 2-17.69 Slope Stab.
OTT County · est $0.7M
Bid dateThursday, April 24—
OTT County · est $0.7M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 46 more items below.
| Item | Quantity | R1Vernon Nagel INC | R2Great Lakes Demolition Company | R3Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|
| 203E10000 EXCAVATION | 3,290 CY | $18.00 | $6.00 | $17.25 | 13% |
| 832E30000 EROSION CONTROL | 40,000 EACH | $1.00 | $1.00 | $1.00 | 9% |
| 203E20001 EMBANKMENT, AS PER PLAN | 3,290 CY | $12.00 | $6.00 | $17.25 | 9% |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 617 SY | $60.00 | $61.00 | $99.00 | 8% |
| 609E23000 COMBINATION CURB AND GUTTER, TYPE 4 | 846 FT | $35.00 | $25.00 | $41.00 | 7% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,938 FT | $15.00 | $30.00 | $42.50 | 7% |
| 203E35130 GRANULAR MATERIAL, TYPE D | 438 CY |
| Item | Quantity | R1Vernon Nagel INC | R2Great Lakes Demolition Company | R3Eclipse CO LLC |
|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 60 SY | $30.00 | $90.00 | $19.50 |
| 202E30701 CONCRETE BARRIER REMOVED, AS PER PLAN | 137.5 FT | $16.00 | $20.00 | $22.75 |
| 202E32000 CURB REMOVED | 18 FT | $10.00 | $10.00 | $24.50 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 60 FT | $5.00 | $25.00 | $27.75 |
| 202E38000 GUARDRAIL REMOVED | 325 FT | $4.00 | $4.00 | $2.50 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $65.00 |
| $55.00 |
| $76.50 |
| 6% |
| 624E10000 MOBILIZATION | 1 LS | $25,000 | $60,000 | $29,500 | 6% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 70 CY | $310 | $320 | $310 | 5% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $20,000 | $6,500 | $1,000 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $18,000 | $18,650 | $29,083 | 4% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 202 CY | $85.00 | $50.00 | $75.25 | 4% |
| 659E00300 TOPSOIL | 462 CY | $30.00 | $50.00 | $73.50 | 3% |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 35 CY | $350 | $420 | $350 | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 325 FT | $31.00 | $31.00 | $23.25 | 2% |
| 659E00530 SEEDING AND MULCHING, CLASS 3B | 4,129 SY | $2.25 | $3.00 | $2.00 | 2% |
| 203E35110 GRANULAR MATERIAL, TYPE B | 165 CY | $55.00 | $50.00 | $68.50 | 2% |
| 606E16050 GUARDRAIL REBUILT, TYPE MGS | 570 FT | $15.75 | $16.00 | $15.25 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,500 | $7,000 | $8,621 | 2% |
| 671E15050 EROSION CONTROL MAT, TYPE F | 3,650 SY | $1.90 | $6.00 | $2.00 | 2% |
| 570 FT |
| $4.00 |
| $4.00 |
| $3.25 |
| 202E42806 ANCHOR ASSEMBLY REMOVED FOR REUSE, TYPE T | 1 EACH | $350 | $350 | $125 |
| 202E47200 BRIDGE TERMINAL ASSEMBLY REMOVED FOR REUSE | 2 EACH | $350 | $350 | $100 |
| 202E47801 IMPACT ATTENUATOR REMOVED, AS PER PLAN | 1 EACH | $1,000 | $1,500 | $525 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $250 | $450 | $441 |
| 202E98000 REMOVAL MISC.:, TRAFFIC DRUMS | 1 LS | $250 | $4,500 | $210 |
| 202E98200 REMOVAL MISC.:, UNDERDRAIN | 380 FT | $18.00 | $15.00 | $8.50 |
| 203E40001 BORROW, AS PER PLAN | 402 CY | $15.00 | $25.00 | $15.75 |
| 204E10000 SUBGRADE COMPACTION | 606 SY | $1.00 | $3.00 | $0.75 |
| 204E13000 EXCAVATION OF SUBGRADE | 202 CY | $24.00 | $15.00 | $37.50 |
| 204E50000 GEOTEXTILE FABRIC | 606 SY | $1.75 | $4.00 | $4.50 |
| 606E27910 ANCHOR ASSEMBLY REBUILT, MGS TYPE T | 1 EACH | $875 | $875 | $1,260 |
| 606E35012 MGS BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 1 | 1 EACH | $1,250 | $1,250 | $2,340 |
| 606E35112 MGS BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 2 | 1 EACH | $675 | $675 | $520 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 7 CY | $185 | $200 | $217 |
| 659E14000 REPAIR SEEDING AND MULCHING | 214 SY | $1.20 | $1.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.61 TON | $850 | $800 | $1,114 |
| 659E35000 WATER | 22 MGAL | $1.00 | $20.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.21 CY | $5,000 | $3,500 | $4,154 |
| 611E05200 12" CONDUIT, TYPE F, 707.05 TYPE C OR 707.21 | 65 FT | $105 | $150 | $103 |
| 611E98370 CATCH BASIN, NO. 6 | 1 EACH | $4,600 | $3,250 | $4,961 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 394 FT | $2.00 | $4.00 | $2.25 |
| 304E20000 AGGREGATE BASE | 91 CY | $75.00 | $55.00 | $78.25 |
| 407E10000 TACK COAT | 82 GAL | $5.00 | $4.00 | $5.00 |
| 609E23001 COMBINATION CURB AND GUTTER, TYPE 4, AS PER PLAN | 45 FT | $35.00 | $25.00 | $50.00 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 193 LB | $1.00 | $4.00 | $6.00 |
| 642E00104 EDGE LINE, 6", TYPE 1, WHITE | 0.1 MILE | $1,000 | $1,000 | $1,500 |
| 642E00204 LANE LINE, 6", TYPE 1 | 1.07 MILE | $500 | $500 | $1,500 |
| 642E01510 DOTTED LINE, 6", TYPE 1 | 550 FT | $0.50 | $0.50 | $1.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $80.00 | $150 | $75.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 1,938 FT | $1.00 | $5.00 | $2.75 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,750 | $2,750 | $1,767 |
| 614E12500 REPLACEMENT SIGN | 3 EACH | $192 | $192 | $150 |
| 614E12600 REPLACEMENT DRUM | 6 EACH | $56.00 | $56.00 | $55.25 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE-WAY | 39 EACH | $8.00 | $8.00 | $12.50 |
| 614E13350 OBJECT MARKER, ONE WAY | 39 EACH | $18.00 | $18.00 | $19.75 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $900 | $900 | $1,076 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 1 MILE | $1,000 | $1,000 | $2,500 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 2,594 FT | $0.50 | $0.50 | $0.50 |
| 616E10000 WATER | 130 MGAL | $1.00 | $20.00 | $29.25 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,000 | $8,500 | $13,589 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E10000 EXCAVATION | 3,290 CY | $18 | $59k | 11% |
| 832E30000 EROSION CONTROL | 40,000 EACH | $1 | $40k | 8% |
| 203E20001 EMBANKMENT, AS PER PLAN | 3,290 CY | $12 | $39k | 8% |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 617 SY | $60 | $37k | 7% |
| 609E23000 COMBINATION CURB AND GUTTER, TYPE 4 | 846 FT | $35 | $30k | 6% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,938 FT | $15 | $29k | 6% |
| 203E35130 GRANULAR MATERIAL, TYPE D | 438 CY | $65 | $28k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $25,000 | $25k | 5% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 70 CY | $310 | $22k | 4% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $20,000 | $20k | 4% |