WAY-SR 241-01.32
WAY County · est $0.5M
Bid dateThursday, May 8—
WAY County · est $0.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Alan Stone CO INC | R3Dennison Bridge INC | R4Craig Edward Susany INC | % of bid |
|---|---|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: W16x57 FURNISHED | 1,740.5 FT | $52.00 | $50.00 | $50.00 | $53.00 | 25% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 1,770 FT | $49.60 | $55.00 | $80.00 | $77.00 | 24% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 30" DIAMETER, UN | 580 FT | $82.90 | $71.00 | $90.00 | $108 | 13% |
| 611E10200 24" CONDUIT, TYPE A, 707.33, 748.06 (0.500) | 49 FT | $291 | $290 | $275 | $300 | 4% |
| 607E15000 FENCE, TYPE 47 | 635 FT | $21.00 | $20.00 | $20.00 | $25.00 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $12,500 | $25,000 |
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Alan Stone CO INC | R3Dennison Bridge INC | R4Craig Edward Susany INC |
|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 69 SY | $44.00 | $15.00 | $25.00 | $25.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 38 FT | $58.00 | $10.00 | $30.00 | $25.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 1 EACH | $167 | $410 | $100 | $250 |
| 202E53100 MAILBOX REMOVED | 3 EACH | $475 | $140 | $10.00 | $25.00 |
| 202E75000 FENCE REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $18,000 |
| $20,000 |
| 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 562.5 FT | $22.00 | $20.00 | $21.00 | $22.00 | 3% |
| 659E00300 TOPSOIL | 69 CY | $164 | $20.00 | $40.00 | $80.00 | 3% |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 17.4 CY | $445 | $680 | $850 | $1,300 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $7,200 | $500 | $1,000 | $6,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,000 | $5,000 | $5,500 | $14,000 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $2,250 | $1,500 | $1,250 | $1,700 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,000 | $12,000 | $5,000 | $1,000 | 2% |
| 203E10000 EXCAVATION | 97.1 CY | $58.62 | $25.00 | $15.00 | $25.00 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $5,500 | $6,000 | $5,200 | $6,000 | 2% |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 6 SNMT | $891 | $950 | $800 | $900 | 1% |
| 301E56001 ASPHALT CONCRETE BASE, (449), AS PER PLAN (PG64-22 | 8 CY | $661 | $560 | $800 | $1,100 | 1% |
| 690E98000 SPECIAL - INCLINOMETER | 1 EACH | $4,800 | $1,500 | $3,000 | $3,400 | 1% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 33.3 CY | $140 | $140 | $175 | $200 | 1% |
| 659E10000 SEEDING AND MULCHING | 623 SY | $7.00 | $2.50 | $4.00 | $7.00 | 1% |
| 635 FT |
| $3.00 |
| $2.00 |
| $2.00 |
| $2.00 |
| 203E20000 EMBANKMENT | 128.1 CY | $29.00 | $20.00 | $20.00 | $25.00 |
| 204E10000 SUBGRADE COMPACTION | 73 SY | $17.00 | $4.00 | $10.00 | $10.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 1 EACH | $2,800 | $2,700 | $2,600 | $3,000 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,500 | $1,500 | $1,450 | $1,500 |
| 607E98100 FENCE, MISC.: CROSSING, TYPE 2 | 1 EACH | $1,400 | $1,500 | $1,300 | $1,000 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $1,600 | $3,500 | $750 | $5,500 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $1,600 | $3,500 | $750 | $600 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 3 EACH | $245 | $250 | $230 | $1,500 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $167 | $150 | $100 | $15.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 31 SY | $7.00 | $20.00 | $4.00 | $7.00 |
| 659E15000 INTER-SEEDING | 31 SY | $7.00 | $20.00 | $4.00 | $4.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.08 TON | $1,400 | $630 | $1,000 | $1,000 |
| 659E31000 LIME | 0.13 ACRE | $170 | $800 | $100 | $600 |
| 659E35000 WATER | 3.44 MGAL | $1.00 | $1.00 | $1.00 | $1.00 |
| 670E00520 SLOPE EROSION PROTECTION MAT, TYPE B | 124 SY | $5.00 | $20.00 | $4.00 | $5.00 |
| 832E30000 EROSION CONTROL | 2,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.46 CY | $4,700 | $2,400 | $2,500 | $3,000 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.0") | 139 SY | $21.00 | $35.00 | $25.00 | $40.00 |
| 304E20000 AGGREGATE BASE | 6.3 CY | $481 | $220 | $250 | $300 |
| 407E10000 TACK COAT | 25 GAL | $33.00 | $4.00 | $15.00 | $5.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 51.1 GAL | $30.00 | $5.00 | $25.00 | $12.00 |
| 617E10100 COMPACTED AGGREGATE | 21.3 CY | $200 | $180 | $150 | $200 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (1WAY) | 8 EACH | $17.00 | $15.00 | $15.00 | $15.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.4 MILE | $2,700 | $2,500 | $2,600 | $2,500 |
| 642E00300 CENTER LINE, TYPE 1 | 0.2 MILE | $4,700 | $4,300 | $4,500 | $4,300 |
| 511E81300 CONCRETE, MISC.: PRECAST CONCRETE LAGGING | 1 EACH | $3,000 | $3,500 | $3,000 | $3,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,250 | $4,800 | $3,000 | $5,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $800 | $18,000 | $6,000 | $7,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: W16x57 FURNISHED | 1,740.5 FT | $52 | $91k | 22% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 1,770 FT | $49.6 | $88k | 21% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 30" DIAMETER, UN | 580 FT | $82.9 | $48k | 12% |
| 611E10200 24" CONDUIT, TYPE A, 707.33, 748.06 (0.500) | 49 FT | $291 | $14k | 3% |
| 607E15000 FENCE, TYPE 47 | 635 FT | $21 | $13k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $12,500 | $13k | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 562.5 FT | $22 | $12k | 3% |
| 659E00300 TOPSOIL | 69 CY | $164 | $11k | 3% |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 17.4 CY | $445 | $8k | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $7,200 | $7k | 2% |