COS-SR 93-00.75
COS County · est $2.7M
Bid dateThursday, May 22—
COS County · est $2.7M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 40 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Alan Stone CO INC | R3Ohio-west Virginia Excavating CO | R4Dennison Bridge INC | % of bid |
|---|---|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: W36X256 STEEL BEAM, FURNISHED | 3,120 FT | $219 | $200 | $236 | $245 | 37% |
| 524E94903 DRILLED SHAFTS, 48" DIAMETER ABOVE BEDROCK, AS PER | 1,956 FT | $173 | $210 | $204 | $205 | 18% |
| 524E94905 DRILLED SHAFTS, 48" DIAMETER, INTO BEDROCK, AS PER | 1,245 FT | $173 | $235 | $267 | $245 | 12% |
| 203E10000 EXCAVATION | 5,832 CY | $16.00 | $13.00 | $17.85 | $20.00 | 5% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 445 CY | $185 | $220 | $210 | $235 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $65,000 | $64,500 | $73,750 | $100,000 |
| Item | Quantity | R1Shelly & Sands INC | R2Alan Stone CO INC | R3Ohio-west Virginia Excavating CO | R4Dennison Bridge INC |
|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 25 FT | $4.00 | $4.50 | $15.70 | $4.00 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 300 FT | $3.20 | $3.50 | $8.13 | $4.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 1 EACH | $145 | $160 | $475 | $150 |
| 202E75000 FENCE REMOVED | 889 FT | $3.50 | $2.00 | $2.40 | $10.00 |
| 204E10000 SUBGRADE COMPACTION |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $50,000 | $21,000 | $16,900 | $40,000 | 3% |
| 203E20000 EMBANKMENT | 5,155 CY | $9.00 | $8.50 | $27.46 | $25.00 | 3% |
| 304E20000 AGGREGATE BASE | 483 CY | $92.00 | $80.00 | $93.50 | $120 | 2% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 1,969 FT | $14.00 | $7.00 | $17.00 | $20.00 | 1% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (125 CY | $220 | $280 | $239 | $315 | 1% |
| 203E35120 GRANULAR MATERIAL, TYPE C | 300 CY | $85.00 | $90.00 | $104 | $110 | 1% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 89 CY | $285 | $310 | $276 | $425 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $24,400 | $13,000 | $5,395 | $10,000 | 1% |
| 832E30000 EROSION CONTROL | 20,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $19,000 | $20,000 | $20,800 | $50,000 | 1% |
| 202E23000 PAVEMENT REMOVED | 2,562 SY | $5.50 | $10.00 | $7.70 | $22.00 | 1% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 638 FT | $22.00 | $25.00 | $27.40 | $23.50 | 1% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $1,250 | $750 | $822 | $500 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,305 | $13,000 | $22,740 | $23,000 | 1% |
| 2,880 SY |
| $2.50 |
| $3.00 |
| $0.80 |
| $5.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 300 CY | $32.00 | $20.00 | $28.10 | $45.00 |
| 204E50000 GEOTEXTILE FABRIC | 900 SY | $0.75 | $1.50 | $1.77 | $3.00 |
| 606E16560 GUARDRAIL REBUILT, TYPE MGS WITH LONG POSTS | 300 FT | $16.00 | $18.00 | $21.09 | $17.00 |
| 606E19001 GUARDRAIL POST, STEEL, AS PER PLAN | 40 EACH | $60.00 | $65.00 | $57.50 | $60.00 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 1 EACH | $860 | $950 | $1,290 | $900 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 6 EACH | $500 | $840 | $215 | $500 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $2,100 | $4,500 | $935 | $4,000 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $2,100 | $4,500 | $935 | $4,000 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 8 SY | $180 | $160 | $281 | $400 |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 5,869 SY | $0.75 | $1.50 | $0.95 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.79 TON | $900 | $1,200 | $1,450 | $1,500 |
| 659E31000 LIME | 1.21 ACRE | $154 | $500 | $200 | $150 |
| 659E35000 WATER | 32 MGAL | $1.00 | $1.00 | $1.25 | $1.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 29 FT | $50.00 | $20.00 | $42.00 | $30.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 4 EACH | $450 | $450 | $305 | $400 |
| 407E20000 NON-TRACKING TACK COAT | 354 GAL | $3.50 | $6.00 | $5.25 | $4.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 175 GAL | $10.00 | $10.00 | $11.81 | $15.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 49 CY | $160 | $150 | $124 | $120 |
| 621E00100 RPM | 8 EACH | $400 | $440 | $469 | $420 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 6 EACH | $40.00 | $25.00 | $72.25 | $20.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BI-DIRECTIONAL | 13 EACH | $13.00 | $13.00 | $14.00 | $14.00 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 11.5 FT | $26.00 | $30.00 | $21.00 | $27.50 |
| 630E80100 SIGN, FLAT SHEET | 9 SF | $34.00 | $40.00 | $35.00 | $36.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 3 EACH | $10.00 | $10.00 | $140 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $15.00 | $15.00 | $140 | $15.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.36 MILE | $2,650 | $2,900 | $3,100 | $2,800 |
| 642E00300 CENTER LINE, TYPE 1 | 0.18 MILE | $4,775 | $5,300 | $5,600 | $5,100 |
| 614E12420 DETOUR SIGNING | 1 LS | $6,550 | $6,300 | $6,625 | $6,000 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $1,500 | $1,700 | $1,750 | $1,500 |
| 616E10000 WATER | 10 MGAL | $65.00 | $1.00 | $12.00 | $70.00 |
| 203E07502 SPECIAL - INCLINOMETER | 2 EACH | $750 | $2,700 | $2,100 | $3,500 |
| 518E21201 POROUS BACKFILL WITH GEOTEXTILE FABRIC, AS PER PLA | 93 CY | $125 | $150 | $165 | $150 |
| 518E40001 6" PERFORATED CORRUGATED PLASTIC PIPE, AS PER PLAN | 328 FT | $3.25 | $6.00 | $26.50 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 12 FT | $55.00 | $4.50 | $44.00 | $25.00 |
| 690E98400 SPECIAL -GEOTECHNICAL INSTRUMENT DECOMMISSIONING | 1 LS | $900 | $15,000 | $3,525 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: W36X256 STEEL BEAM, FURNISHED | 3,120 FT | $219 | $683k | 35% |
| 524E94903 DRILLED SHAFTS, 48" DIAMETER ABOVE BEDROCK, AS PER | 1,956 FT | $173 | $338k | 17% |
| 524E94905 DRILLED SHAFTS, 48" DIAMETER, INTO BEDROCK, AS PER | 1,245 FT | $173 | $215k | 11% |
| 203E10000 EXCAVATION | 5,832 CY | $16 | $93k | 5% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 445 CY | $185 | $82k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $65,000 | $65k | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $50,000 | $50k | 3% |
| 203E20000 EMBANKMENT | 5,155 CY | $9 | $46k | 2% |
| 304E20000 AGGREGATE BASE | 483 CY | $92 | $44k | 2% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 1,969 FT | $14 | $28k | 1% |