TRU-US 422-08.01
TRU County · est $0.2M
Bid dateThursday, December 18—
TRU County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 18 more items below.
| Item | Quantity | R1Cornerstone Electric INC | R2Perram Electric INC | R3Tc Randel Constructon LLC | R4S E T INC | R5Kokosing Construction Company INC | R6Miller Cable Company | % of bid |
|---|---|---|---|---|---|---|---|---|
| 632E78349 COMBINATION SIGNAL SUPPORT, TYPE TC-12.31 DESIGN 1 | 1 EACH | $34,000 | $33,435 | $31,000 | $42,000 | $40,000 | $47,730 | 18% |
| 632E72150 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 14 | 1 EACH | $20,000 | $19,940 | $20,000 | $24,000 | $24,000 | $26,235 | 10% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 2 EACH | $8,600 | $9,340 |
| Item | Quantity | R1Cornerstone Electric INC | R2Perram Electric INC | R3Tc Randel Constructon LLC | R4S E T INC | R5Kokosing Construction Company INC | R6Miller Cable Company |
|---|---|---|---|---|---|---|---|
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS | 1 LS | $1,000 | $395 | $500 | $500 | $1,000 | $5,500 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E00400 4" CONDUIT, TYPE E | 20 FT | $10.00 | $10.85 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $8,700 |
| $10,000 |
| $10,000 |
| $10,600 |
| 9% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $17,000 | $17,045 | $17,500 | $22,000 | $23,000 | $21,580 | 9% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 2 EACH | $8,000 | $8,345 | $7,250 | $9,000 | $16,000 | $9,950 | 8% |
| 619E16010 FIELD OFFICE, TYPE B | 9 MNTH | $1,500 | $1,500 | $1,650 | $200 | $300 | $750 | 7% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 147 FT | $75.00 | $87.35 | $111 | $72.00 | $125 | $80.00 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10,000 | $9,600 | $6,000 | $13,000 | $10,000 | 5% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 1 EACH | $8,400 | $8,735 | $8,400 | $10,000 | $9,500 | $10,100 | 4% |
| 646E10400 STOP LINE | 71 FT | $100 | $46.15 | $56.00 | $26.00 | $49.55 | $77.50 | 4% |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $6,500 | $6,440 | $5,700 | $7,000 | $6,800 | $6,850 | 3% |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 7 EACH | $900 | $970 | $900 | $1,100 | $1,100 | $1,525 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,000 | $8,235 | $10,000 | $15,000 | $13,979 | $25,500 | 3% |
| 625E30706 PULL BOX, 725.08, 24" | 3 EACH | $1,500 | $2,005 | $925 | $1,200 | $2,900 | $1,685 | 2% |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 77 SF | $45.00 | $32.35 | $46.00 | $48.00 | $45.00 | $50.00 | 2% |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $3,000 | $2,685 | $1,250 | $3,500 | $6,000 | $2,750 | 2% |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 1 EACH | $2,500 | $3,375 | $2,350 | $2,500 | $2,200 | $3,300 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $50.00 | $75.00 | $85.00 | $95.00 | $80.00 | $80.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,000 | $2,019 | $6,000 | $2,671 | $1,500 | $3,500 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,000 | $1,185 | $3,600 | $3,000 | $2,500 | $5,560 | 1% |
| $10.00 |
| $20.00 |
| $15.00 |
| $8.00 |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 2 EACH | $800 | $497 | $1,660 | $1,700 | $1,630 | $1,725 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $50.00 | $49.30 | $22.00 | $20.00 | $20.00 | $21.00 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 1 EACH | $750 | $395 | $500 | $500 | $475 | $500 |
| 630E97700 SIGNING, MISC.: REMOVAL OF SIGN POST REFLECTOR | 4 EACH | $25.00 | $24.65 | $16.00 | $16.00 | $15.00 | $15.75 |
| 625E25500 CONDUIT, 3", 725.04 | 42 FT | $30.00 | $37.85 | $27.00 | $44.00 | $57.00 | $35.00 |
| 625E29000 TRENCH | 42 FT | $20.00 | $14.10 | $19.00 | $20.00 | $20.00 | $16.00 |
| 625E32000 GROUND ROD | 3 EACH | $200 | $322 | $185 | $230 | $350 | $285 |
| 625E36011 UNDERGROUND WARNING/MARKING TAPE, AS PER PLAN | 42 FT | $1.00 | $1.00 | $3.50 | $2.00 | $35.00 | $3.00 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (TRU 422 CONTROLL | 1 EACH | $500 | $2,000 | $3,500 | $840 | $1,400 | $4,250 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 7 EACH | $25.00 | $10.00 | $20.00 | $50.00 | $70.00 | $50.00 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 523 FT | $3.50 | $2.40 | $6.50 | $3.00 | $3.00 | $3.50 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 126 FT | $4.00 | $2.80 | $22.75 | $3.00 | $4.50 | $3.75 |
| 632E69300 POWER CABLE, 3 CONDUCTOR, NO. 4 AWG | 30 FT | $6.00 | $9.95 | $4.50 | $10.00 | $25.00 | $15.00 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 1 EACH | $800 | $790 | $400 | $500 | $5,300 | $950 |
| 809E69123 ATC CONTROLLER, AS PER PLAN | — | $500 | $547 | $550 | $1,000 | $1,100 | $1,862 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 632E78349 COMBINATION SIGNAL SUPPORT, TYPE TC-12.31 DESIGN 1 | 1 EACH | $34,000 | $34k | 17% |
| 632E72150 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 14 | 1 EACH | $20,000 | $20k | 10% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 2 EACH | $8,600 | $17k | 8% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $17,000 | $17k | 8% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 2 EACH | $8,000 | $16k | 8% |
| 619E16010 FIELD OFFICE, TYPE B | 9 MNTH | $1,500 | $14k | 7% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 147 FT | $75 | $11k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 5% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 1 EACH | $8,400 | $8k | 4% |
| 646E10400 STOP LINE | 71 FT | $100 | $7k | 3% |