Figure 0.1 · BRIEFING BID #254010 · ODOT RESULT · awarded Feb 27 MEG-SR 681-06.24 MEG County · est $0.8M
Bid date Thursday, February 27 —
Project scope Bid form · ODOT
47 ITEMS Structures / Bridge 19% Maintaining Traffic 15% Earthwork 13% Drainage 13% Guardrail & Barrier 9% Erosion & Landscaping 9% Other Item Quantity R1 Alan Stone CO INC % of bid 507E00400 STEEL PILES, MISC.:, W24x131 1,876 FT $105 22% 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER 800 FT $215 19% 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE 731 FT $205 16% 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER 806 CY $110 10% 530E51010 SPECIAL - RETAINING WALL, PRECAST CONCRETE LAGGING 1,804 SF $24.60 5% 614E11000 MAINTAINING TRAFFIC 1 LS $35,000 4% 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG 94 CY $350 4% 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) 93 CY $350 4% 624E10000 MOBILIZATION 1 LS $30,000 3% 203E10000 EXCAVATION 741 CY $35.00 3% 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC 132 CY $130 2% 622E41100 PORTABLE BARRIER, UNANCHORED 1,000 FT $12.00 1% 606E15050 GUARDRAIL, TYPE MGS 375 FT $30.00 1% 304E20000 AGGREGATE BASE 99 CY $110 1% 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS — $2,500 1% 611E07200 18" CONDUIT, TYPE A 44 FT $210 1% 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING 1 LS $9,000 1% 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN 17 CY $500 1% 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM 1 LS $7,500 1% 202E23000 PAVEMENT REMOVED 287 SY $20.00 1%
Show all 47 line items Item Quantity R1 Alan Stone CO INC 201E11000 CLEARING AND GRUBBING 1 LS $3,850 202E20010 HEADWALL REMOVED 2 EACH $200 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER 48 FT $7.00 202E98100 REMOVAL MISC.:PILE EXTRACTION 31 EACH $50.00 203E20000 EMBANKMENT 55 CY $5.00 204E10000 SUBGRADE COMPACTION 600 SY $5.00 606E25000 ANCHOR ASSEMBLY, TYPE A 2 EACH $2,000 659E10000 SEEDING AND MULCHING 938 SY $2.00 659E20000 COMMERCIAL FERTILIZER 0.09 TON $620
Project details
Description MEG-SR 681-06.24
Type of work Earthwork How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →