LAW-SR 217-02.53
LAW County · est $0.5M
Bid dateThursday, June 26—
LAW County · est $0.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 24 more items below.
| Item | Quantity | R1Allard Excavation LLC | R2Alan Stone CO INC | R3Ohio-west Virginia Excavating CO | R4Craig Edward Susany INC | R5Beaver Excavating Company | % of bid |
|---|---|---|---|---|---|---|---|
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 817 FT | $112 | $100 | $127 | $135 | $110 | 21% |
| 507E00400 STEEL PILES, MISC.: W12X53 STEEL BEAM, FURNISHED, | 1,670 FT | $49.00 | $50.00 | $49.00 | $59.00 | $45.00 | 19% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 645 FT | $125 | $110 | $110 | $135 | $135 | 19% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILES, 36" DIAMETER, U | 594 FT | $101 | $100 | $128 | $125 | $120 | 14% |
| 624E10000 MOBILIZATION | 1 LS | $21,500 | $21,000 | $51,200 | $20,000 | $70,000 | 5% |
| 441E70000 |
| Item | Quantity | R1Allard Excavation LLC | R2Alan Stone CO INC | R3Ohio-west Virginia Excavating CO | R4Craig Edward Susany INC | R5Beaver Excavating Company |
|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 14 SY | $36.00 | $120 | $180 | $20.00 | $27.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 43 FT | $10.00 | $9.00 | $44.00 | $20.00 | $7.00 |
| 202E38000 GUARDRAIL REMOVED | 108 FT | $5.00 | $6.00 | $17.00 | $5.00 | $4.50 |
| 203E10000 EXCAVATION | 31 CY | $26.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 46 CY |
| $415 |
| $360 |
| $450 |
| $505 |
| $497 |
| 4% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 44 CY | $400 | $330 | $450 | $490 | $479 | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,607 | $7,100 | $4,000 | $7,500 | $5,500 | 2% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 356 SY | $23.00 | $35.00 | $22.00 | $20.00 | $26.39 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 312.5 FT | $24.34 | $25.00 | $28.00 | $25.00 | $24.34 | 2% |
| 611E07200 18" CONDUIT, TYPE A (SEE SHET FOR ALLOWAB | 42 FT | $147 | $330 | $180 | $190 | $75.00 | 1% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,000 | $4,000 | $7,500 | $14,000 | $2,220 | 1% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 112.5 FT | $26.78 | $27.00 | $30.00 | $27.00 | $26.78 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,929 | $5,200 | $4,200 | $100 | $29,000 | 1% |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 30 CY | $97.00 | $160 | $125 | $200 | $95.00 | 1% |
| 621E00100 RPM | 5 EACH | $550 | $650 | $600 | $550 | $550 | 1% |
| 511E81300 CONCRETE, MISC.: PRECAST REINFORCED CONCRETE LAGGI | 1 EACH | $2,627 | $3,400 | $4,400 | $4,000 | $3,300 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 1 EACH | $2,300 | $2,500 | $2,600 | $2,300 | $2,300 | 1% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 361 SY | $5.35 | $25.00 | $6.00 | $6.00 | $6.50 | 0% |
| $20.00 |
| $72.00 |
| $20.00 |
| $20.76 |
| 203E20000 EMBANKMENT | 55 CY | $23.00 | $20.00 | $46.00 | $20.00 | $41.59 |
| 204E10000 SUBGRADE COMPACTION | 66 SY | $4.00 | $20.00 | $16.00 | $3.00 | $16.40 |
| 659E00300 TOPSOIL | 41 CY | $26.00 | $20.00 | $101 | $50.00 | $104 |
| 659E10000 SEEDING AND MULCHING | 373 SY | $3.00 | $4.00 | $10.00 | $8.00 | $9.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.05 TON | $600 | $660 | $1,435 | $600 | $1,250 |
| 659E31000 LIME | 0.08 ACRE | $500 | $940 | $170 | $50.00 | $150 |
| 659E35000 WATER | 2 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.33 CY | $2,593 | $3,300 | $5,200 | $2,000 | $2,000 |
| 304E20000 AGGREGATE BASE | 8 CY | $179 | $260 | $258 | $200 | $85.00 |
| 407E10000 TACK COAT | 101 GAL | $2.50 | $5.00 | $2.00 | $2.50 | $3.00 |
| 620E31200 REMOVAL OF DELINEATOR | 2 EACH | $46.00 | $30.00 | $30.00 | $10.00 | $13.10 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 5 EACH | $10.00 | $45.00 | $55.00 | $20.00 | $13.20 |
| 626E00112 BARRIER REFLECTOR, TYPE 3 (BI-DIRECTIONAL) | 5 EACH | $10.00 | $10.00 | $14.00 | $10.00 | $10.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 13.1 FT | $12.00 | $15.00 | $15.00 | $12.00 | $12.00 |
| 630E80100 SIGN, FLAT SHEET | 8.6 SF | $28.00 | $35.00 | $60.00 | $28.00 | $28.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $29.00 | $65.00 | $400 | $10.00 | $16.90 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $29.00 | $75.00 | $700 | $15.00 | $130 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.12 MILE | $8,550 | $10,000 | $9,800 | $9,000 | $8,550 |
| 642E00300 CENTER LINE, TYPE 1 | 0.06 MILE | $16,550 | $19,000 | $18,000 | $17,000 | $16,550 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $1,266 | $1,100 | $2,000 | $1,000 | $12,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 817 FT | $112 | $92k | 21% |
| 507E00400 STEEL PILES, MISC.: W12X53 STEEL BEAM, FURNISHED, | 1,670 FT | $49 | $82k | 18% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 645 FT | $125 | $81k | 18% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILES, 36" DIAMETER, U | 594 FT | $101 | $60k | 13% |
| 624E10000 MOBILIZATION | 1 LS | $21,500 | $22k | 5% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 46 CY | $415 | $19k | 4% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 44 CY | $400 | $18k | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,607 | $11k | 2% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 356 SY | $23 | $8k | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 312.5 FT | $24.34 | $8k | 2% |