LUC-US 20A-09.77 Roundabout
LUC County · est $1.8M
Bid dateThursday, January 15—
Awarded toVERNON NAGEL INC$1.53M
LUC County · est $1.8M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 856 CY | $145 | $124k | 8% |
| 452E19200 NON-REINFORCED CONCRETE PAVEMENT, MISC.: 8" CONCRE | 779 SY | $101 | $79k | 5% |
| 608E15000 8" CONCRETE WALK | 7,703 SF | $10 | $77k | 5% |
| 624E10000 MOBILIZATION Section 11 - INCIDENTALS - Totals Awd $190,600.00 2 $131,000.00 3 $165,238.09 4 $140,648.89 | 1 LS | $74,520 | $75k | 5% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (347 CY | $174 | $60k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $57,450 | $57k | 4% |
| 304E20000 AGGREGATE BASE | 1,190 CY | $46 | $55k | 4% |
| 206E10500 CEMENT | 219 TON | $233 | $51k | 3% |
| 203E10000 EXCAVATION | 1,246 CY | $40 | $50k | 3% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 231 CY | $205 | $47k | 3% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 101 more items below.
| Item | Quantity | R1Vernon Nagel INC | R2Advanced Excavating & Demolition LLC | R3Gerken Paving INC | R4Geddis Paving & Excavating INC | % of bid |
|---|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 856 CY | $145 | $150 | $156 | $150 | 13% |
| 452E19200 NON-REINFORCED CONCRETE PAVEMENT, MISC.: 8" CONCRE | 779 SY | $101 | $95.00 | $101 | $115 | 8% |
| 608E15000 8" CONCRETE WALK | 7,703 SF | $10.00 | $9.00 | $9.50 | $11.50 | 8% |
| 624E10000 MOBILIZATION Section 11 - INCIDENTALS - Totals Awd $190,600.00 2 $131,000.00 3 $165,238.09 4 $140,648.89 | 1 LS | $74,520 | $30,000 | $80,500 | $50,000 | 8% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (347 CY | $174 | $180 | $180 | $175 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $57,450 | $30,000 | $12,228 | $29,999 | 6% |
| 304E20000 AGGREGATE BASE | 1,190 CY | $46.00 | $53.00 | $47.50 | $54.50 | 6% |
| 206E10500 CEMENT | 219 TON | $233 | $215 | $233 | $240 | 5% |
| 203E10000 EXCAVATION | 1,246 CY | $40.00 | $13.00 | $26.00 | $28.00 | 5% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 231 CY | $205 | $210 | $225 | $210 | 5% |
| 659E00300 TOPSOIL | 1,071 CY | $40.00 | $45.00 | $70.00 | $76.00 | 4% |
| 611E04401 12" CONDUIT, TYPE B, AS PER PLAN | 472 FT | $84.40 | $95.00 | $80.00 | $105 | 4% |
| 611E98180 CATCH BASIN, NO. 3A | 12 EACH | $3,250 | $3,000 | $3,500 | $2,900 | 4% |
| 202E23000 PAVEMENT REMOVED | 4,838 SY | $7.00 | $15.00 | $12.75 | $11.50 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $30,000 | $23,000 | $25,760 | $38,800 | 3% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $102,644.98 2 $112,144.80 3 $135,001.05 4 $143,874.21 | 29,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 611E99574 MANHOLE, NO. 3 | 5 EACH | $5,450 | $3,700 | $5,250 | $3,200 | 3% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 984 FT | $27.50 | $25.00 | $26.50 | $27.00 | 3% |
| 605E06000 4" BASE PIPE UNDERDRAINS | 1,993 FT | $13.00 | $17.00 | $11.75 | $16.00 | 3% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT15B40 | 4 EACH | $5,675 | $5,676 | $5,676 | $4,500 | 2% |
| Item | Quantity | R1Vernon Nagel INC | R2Advanced Excavating & Demolition LLC | R3Gerken Paving INC | R4Geddis Paving & Excavating INC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,303 | $20,000 | $22,000 | $4,500 |
| 202E32000 CURB REMOVED | 239 FT | $3.50 | $15.00 | $4.50 | $7.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 737 FT | $16.00 | $20.00 | $22.00 | $35.00 |
| 202E58100 CATCH BASIN REMOVED | 6 EACH | $200 | $850 | $1,125 | $770 |
| 202E98200 REMOVAL MISC.: 4" GAS LINE | 127 FT | $7.80 | $16.00 | $11.00 | $7.00 |
| 203E20000 EMBANKMENT | 1,710 CY | $8.00 | $22.00 | $26.75 | $19.00 |
| 204E10000 SUBGRADE COMPACTION | 83 SY | $4.00 | $5.00 | $8.25 | $0.50 |
| 204E45000 PROOF ROLLING | 2 HOUR | $280 | $300 | $160 | $150 |
| 206E11000 CURING COAT | 7,241 SY | $0.99 | $1.50 | $0.99 | $2.00 |
| 206E15020 CEMENT STABILIZED SUBGRADE, 14 INCHES DEEP | 7,241 SY | $2.39 | $5.75 | $2.39 | $2.50 |
| 608E52000 CURB RAMP | 1,338 SF | $15.40 | $10.00 | $9.50 | $18.50 |
| 608E53020 DETECTABLE WARNING | 226 SF | $40.00 | $40.00 | $34.00 | $45.00 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C Section 1 - ROADWAY - Totals Awd $303,326.96 2 $368,564.25 3 $366,589.33 4 $375,235.50 | 5 EACH | $1,150 | $875 | $1,850 | $1,150 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $60.00 | $150 | $60.00 | $67.00 |
| 659E10000 SEEDING AND MULCHING | 8,286 SY | $2.40 | $1.25 | $1.20 | $1.20 |
| 659E14000 REPAIR SEEDING AND MULCHING | 415 SY | $1.20 | $2.00 | $1.20 | $1.20 |
| 659E15000 INTER-SEEDING | 415 SY | $1.00 | $0.75 | $1.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 1.16 TON | $850 | $900 | $850 | $950 |
| 659E31000 LIME | 1.71 ACRE | $35.00 | $5.00 | $35.00 | $40.94 |
| 659E35000 WATER | 46 MGAL | $1.00 | $0.75 | $1.00 | $1.00 |
| 670E00700 DITCH EROSION PROTECTION | 910 SY | $1.80 | $2.90 | $1.80 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,100 | $925 | $925 | $1,050 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $1,860 | $3,500 | $3,125 | $3,500 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $2,196 | $15,000 | $13,275 | $14,900 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 2 SY | $200 | $250 | $275 | $315 |
| 605E05200 4" UNCLASSIFIED PIPE UNDERDRAINS | 1,005 FT | $13.00 | $15.00 | $15.00 | $22.50 |
| 605E31100 AGGREGATE DRAINS | 100 FT | $17.50 | $15.00 | $27.00 | $8.50 |
| 611E00400 4" CONDUIT, TYPE E | 140 FT | $22.00 | $40.00 | $28.00 | $73.00 |
| 611E00406 4" CONDUIT, TYPE F | 206 FT | $22.00 | $40.00 | $21.00 | $73.00 |
| 611E00900 6" CONDUIT, TYPE B | 100 FT | $20.00 | $55.00 | $34.00 | $49.00 |
| 611E01400 6" CONDUIT, TYPE E | 100 FT | $17.50 | $50.00 | $17.00 | $8.00 |
| 611E01500 6" CONDUIT, TYPE F | 100 FT | $17.50 | $50.00 | $17.00 | $8.00 |
| 611E04600 12" CONDUIT, TYPE C | 311 FT | $68.00 | $88.00 | $42.00 | $77.00 |
| 611E04900 12" CONDUIT, TYPE D | 93 FT | $61.00 | $65.00 | $47.00 | $77.00 |
| 611E05901 15" CONDUIT, TYPE B, AS PER PLAN | 115 FT | $68.00 | $90.00 | $76.00 | $120 |
| 611E08901 21" CONDUIT, TYPE B, AS PER PLAN | 58 FT | $225 | $110 | $155 | $170 |
| 611E10401 24" CONDUIT, TYPE B, AS PER PLAN | 40 FT | $275 | $92.00 | $195 | $250 |
| 611E10600 24" CONDUIT, TYPE C | 91 FT | $106 | $95.00 | $130 | $140 |
| 611E98470 CATCH BASIN, NO. 2-2B | 6 EACH | $1,850 | $2,500 | $2,750 | $1,950 |
| 611E98510 CATCH BASIN, NO. 2-3 | 1 EACH | $3,150 | $2,650 | $4,250 | $2,700 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $520 | $750 | $860 | $810 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 2 EACH | $2,160 | $1,300 | $2,250 | $2,450 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET Section 3 - DRAINAGE - Totals Awd $248,249.80 2 $263,604.00 3 $244,036.75 4 $286,441.50 | 1 EACH | $500 | $500 | $335 | $725 |
| 407E10000 TACK COAT | 613 GAL | $2.00 | $2.00 | $2.50 | $2.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 53 CY | $45.00 | $80.00 | $69.00 | $110 |
| 609E18000 COMBINATION CURB AND GUTTER, TYPE 3 | 140 FT | $27.50 | $25.00 | $26.75 | $29.00 |
| 609E26000 CURB, TYPE 6 | 546 FT | $18.50 | $16.00 | $17.75 | $19.00 |
| 609E31000 COMBINATION CURB AND GUTTER, TYPE 9 | 314 FT | $23.50 | $20.00 | $20.75 | $24.50 |
| 609E33000 CURB, TYPE 10 Section 4 - PAVEMENT - Totals Awd $432,556.00 2 $437,613.00 3 $448,327.00 4 $463,558.50 | 899 FT | $17.00 | $14.00 | $15.50 | $17.50 |
| 638E02504 12" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 53, ME | 7 FT | $1,350 | $1,000 | $1,500 | $2,150 |
| 638E10600 FIRE HYDRANT AND GATE VALVE REMOVED AND RESET | 1 EACH | $4,400 | $5,000 | $5,500 | $3,950 |
| 638E98000 WATER WORK, MISC.:MANHOLE ADJUSTED TO GRADE | 4 EACH | $400 | $1,250 | $2,400 | $1,200 |
| 638E98000 WATER WORK, MISC.:MANHOLE RECONSTRUCTED TO GRADE | 2 EACH | $400 | $1,250 | $2,100 | $1,950 |
| 638E98000 WATER WORK, MISC.:MANHOLE RELOCATED Section 5 - WATER WORK - Totals Awd $20,070.00 2 $23,000.00 3 $41,250.00 4 $34,900.00 | 1 EACH | $3,820 | $3,500 | $11,450 | $7,200 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE Section 6 - SANITARY SEWER - Totals Awd $5,200.00 2 $2,500.00 3 $2,500.00 4 $4,400.00 | 2 EACH | $2,600 | $1,250 | $1,250 | $2,200 |
| 625E00450 CONNECTION, FUSED PULL APART | 18 EACH | $201 | $201 | $201 | $140 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 12 EACH | $201 | $201 | $201 | $140 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT10B40 | 3 EACH | $5,528 | $5,528 | $5,528 | $4,100 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT12B40 | 2 EACH | $5,639 | $5,639 | $5,639 | $4,100 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 9 EACH | $2,429 | $2,429 | $2,429 | $2,000 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 3,681 FT | $4.90 | $4.90 | $4.90 | $5.20 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 948 FT | $2.00 | $2.00 | $2.00 | $2.50 |
| 625E25400 CONDUIT, 2", 725.04 | 892 FT | $6.80 | $6.80 | $6.80 | $21.00 |
| 625E25500 CONDUIT, 3", 725.04 | 175 FT | $7.90 | $7.90 | $7.90 | $34.00 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 9 EACH | $625 | $625 | $625 | $460 |
| 625E29000 TRENCH | 1,067 FT | $9.60 | $9.60 | $9.60 | $12.00 |
| 625E30700 PULL BOX, 725.08, 18" | 7 EACH | $1,484 | $1,484 | $1,484 | $1,150 |
| 625E32000 GROUND ROD | 9 EACH | $516 | $516 | $516 | $275 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $8,847 | $8,847 | $8,847 | $8,400 |
| 625E36010 UNDERGROUND WARNING MARKING TAPE | 1,067 FT | $2.70 | $2.70 | $2.70 | $2.00 |
| 625E39000 TEMPORARY LIGHTING | 1 LS | $111 | $111 | $111 | $8,000 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (PS-A) Section 7 - LIGHTING - Totals Awd $149,751.10 2 $150,355.10 3 $150,355.10 4 $156,296.20 | 1 EACH | $1,178 | $1,778 | $1,778 | $3,400 |
| 620E70000 DELINEATOR, MISC.: BASE MOUNTED | 4 EACH | $185 | $350 | $350 | $200 |
| 621E00100 RPM | 107 EACH | $82.50 | $86.00 | $82.50 | $95.50 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 559 FT | $15.20 | $14.00 | $14.00 | $17.00 |
| 630E08601 SIGN POST REFLECTOR, AS PER PLAN | 16 EACH | $45.00 | $40.00 | $40.00 | $50.50 |
| 630E80100 SIGN, FLAT SHEET | 286.2 SF | $21.00 | $21.00 | $21.00 | $23.50 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 10 EACH | $12.00 | $25.00 | $25.00 | $13.50 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 7 EACH | $19.00 | $25.00 | $25.00 | $21.50 |
| 644E00104 EDGE LINE, 6" | 0.5 MILE | $5,500 | $8,000 | $8,000 | $5,500 |
| 644E00300 CENTER LINE | 0.23 MILE | $7,500 | $10,000 | $10,000 | $7,500 |
| 644E00630 CROSSWALK LINE, 24" | 294 FT | $7.00 | $7.00 | $7.00 | $7.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 133 FT | $7.00 | $7.00 | $7.00 | $7.00 |
| 644E01300 LANE ARROW | 4 EACH | $125 | $100 | $100 | $125 |
| 644E01510 DOTTED LINE, 6" | 216 FT | $2.00 | $1.50 | $1.50 | $2.00 |
| 644E20800 YIELD LINE Section 8 - TRAFFIC CONTROL - Totals Awd $34,883.50 2 $36,236.20 3 $35,861.70 4 $38,176.70 | 72 FT | $20.00 | $10.00 | $10.00 | $20.00 |
| 661E00500 MULCH | 9 CY | $90.00 | $90.00 | $90.00 | $90.00 |
| 661E14000 PERENNIALS, SCHIZACHYRIUM SCOPARIUM | 25 EACH | $25.50 | $60.00 | $25.50 | $25.50 |
| 661E14000 PERENNIALS, SPOROBOLUS HETEROLEPS | 38 EACH | $25.50 | $60.00 | $25.50 | $25.50 |
| 661E20100 DECIDUOUS SHRUB, 5' HEIGHT, VIBURNUM PRUNIFOLIUM | 3 EACH | $126 | $700 | $126 | $126 |
| 661E31000 LANDSCAPE WATERING | 301 GAL | $1.00 | $5.00 | $1.00 | $1.00 |
| 661E99930 PLANTING, MISC.:LANDSCAPING FABRIC UNDER WASHED ST | 448 SY | $6.75 | $2.60 | $6.75 | $7.50 |
| 661E99930 PLANTING, MISC.:WASHED STONE, 2" TO 3" Section 9 - LANDSCAPING - Totals Awd $17,619.66 2 $25,039.80 3 $17,619.66 4 $19,447.50 | 448 SY | $25.67 | $35.00 | $25.67 | $29.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $70.00 | $92.00 | $122 | $145 |
| 614E12420 DETOUR SIGNING | 1 LS | $2,250 | $2,500 | $2,250 | $20,000 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 16 SNMT | $1,000 | $1,000 | $1,000 | $1,150 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 36 FT | $10.00 | $10.00 | $10.00 | $11.00 |
| 616E10000 WATER Section 10 - MAINTENANCE OF TRAFFIC - Totals Awd $24,470.00 2 $26,320.00 3 $28,970.00 4 $50,511.00 | 10 MGAL | $26.00 | $10.00 | $60.00 | $11.50 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $11,930 | $30,000 | $12,250 | $14,700 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $5,000 | $10,500 | $7,500 | $1,150 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,950 | $1,250 | $4,500 | $1,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →