D11-GR-FY2026
D11 County · est $4.3M
Bid dateThursday, February 19—
Awarded toLAKE ERIE CONSTRUCTION COMPANY$4.04M
D11 County · est $4.3M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 606E15050 GUARDRAIL, TYPE MGS | 93,576 FT | $17.2 | $1.61M | 40% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 464 EACH | $2,250 | $1.04M | 26% |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 138,254 FT | $2.2 | $304k | 8% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 11,025 FT | $18.8 | $207k | 5% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 111 EACH | $1,050 | $117k | 3% |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 41 EACH | $2,420 | $99k | 2% |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 3,024.75 FT | $27.2 | $82k | 2% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 24 EACH | $2,300 | $55k | 1% |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 73 EACH | $750 | $55k | 1% |
| 606E60029 IMPACT ATTENUATOR, TYPE 2 (BIDIRECTIONAL), AS PER | 2 EACH | $25,500 | $51k | 1% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 38 more items below.
| Item | Quantity | R1Lake Erie Construction Company | % of bid |
|---|---|---|---|
| 606E15050 GUARDRAIL, TYPE MGS | 93,576 FT | $17.20 | 41% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 464 EACH | $2,250 | 27% |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 138,254 FT | $2.20 | 8% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 11,025 FT | $18.80 | 5% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 111 EACH | $1,050 | 3% |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 41 EACH | $2,420 | 3% |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 3,024.75 FT | $27.20 | 2% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 24 EACH | $2,300 | 1% |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 73 EACH | $750 | 1% |
| 606E60029 IMPACT ATTENUATOR, TYPE 2 (BIDIRECTIONAL), AS PER | 2 EACH | $25,500 | 1% |
| 606E13000 GUARDRAIL, TYPE 5 | 2,869 FT | $16.80 | 1% |
| 606E98000 GUARDRAIL, MISC.:RAIL PANEL | 4,362.5 FT | $10.00 | 1% |
| 614E18000 MAINTAINING TRAFFIC, MISC.:GUARDRAIL REPAIR Section 4 - MAINTENANCE OF TRAFFIC - Totals Awd $32,100.00 | 60 EACH | $535 | 1% |
| 624E10000 MOBILIZATION Section 5 - INCIDENTALS - Totals Awd $73,630.00 | 1 LS | $32,000 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $21,550 | 1% |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BI-DIRECTIONAL Section 3 - TRAFFIC CONTROL - Totals Awd $19,292.00 | 1,820 EACH | $10.60 | 0% |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) | 2 EACH | $9,150 | 0% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $18,250 | 0% |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 756 FT | $22.00 | 0% |
| 209E15050 RESHAPING UNDER GUARDRAIL | 26.77 MILE | $600 | 0% |
| Item | Quantity | R1Lake Erie Construction Company |
|---|---|---|
| 203E20000 EMBANKMENT | 100 CY | $78.00 |
| 203E40000 BORROW | 50 CY | $65.00 |
| 606E13050 GUARDRAIL, TYPE 5A | 100 FT | $24.60 |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN | 300 FT | $52.00 |
| 606E15250 GUARDRAIL, TYPE MGS QUARTER POST SPACING | 175 FT | $35.00 |
| 606E18500 GUARDRAIL POST, 9 FEET | 25 EACH | $35.00 |
| 606E20050 ROUNDED END SECTION | 9 EACH | $50.00 |
| 606E25000 ANCHOR ASSEMBLY, TYPE A | 3 EACH | $1,360 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 7 EACH | $1,440 |
| 606E26000 ANCHOR ASSEMBLY, TYPE B | 2 EACH | $2,250 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 2 EACH | $2,850 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 3 EACH | $880 |
| 606E26600 ANCHOR ASSEMBLY, TYPE MGS BURIED IN BACKSLOPE | 2 EACH | $1,750 |
| 606E27810 ANCHOR ASSEMBLY REBUILT, MGS TYPE A | 9 EACH | $725 |
| 606E27846 ANCHOR ASSEMBLY REBUILT, MGS TYPE B | 1 EACH | $1,200 |
| 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN | 1 EACH | $1,000 |
| 606E55020 SPECIAL - CABLE BARRIER, REPLACEMENT CABLE | 100 FT | $8.00 |
| 606E55100 SPECIAL - CABLE BARRIER, CONCRETE LINE POST FOUNDA | 5 EACH | $280 |
| 606E55110 SPECIAL - CABLE BARRIER, CONCRETE ANCHOR FOUNDATIO | 2 EACH | $450 |
| 606E55140 SPECIAL - CABLE BARRIER, ANCHOR POST | 5 EACH | $220 |
| 606E55160 SPECIAL - CABLE BARRIER, TERMINAL STRUT | 5 EACH | $225 |
| 606E55170 SPECIAL - CABLE BARRIER, TURNBUCKLE | 4 EACH | $300 |
| 606E55180 SPECIAL - CABLE BARRIER, SPLICE | 5 EACH | $275 |
| 606E55190 SPECIAL - CABLE BARRIER, POST REFLECTOR | 50 EACH | $12.50 |
| 606E55200 SPECIAL - CABLE BARRIER, TENSIONING | 4 EACH | $650 |
| 606E55210 SPECIAL - CABLE BARRIER, ANCHOR RECONSTRUCTED | 10 EACH | $1,475 |
| 606E55220 SPECIAL - CABLE BARRIER, ANCHOR POST RESET | 2 EACH | $425 |
| 606E98100 GUARDRAIL, MISC.:ANCHOR BUCKLE REPLACEMENT | 4 EACH | $350 |
| 606E98100 GUARDRAIL, MISC.:ANCHOR TRIGGER POST | 2 EACH | $420 |
| 606E98100 GUARDRAIL, MISC.:LINE POST | 100 EACH | $85.00 |
| 606E98100 GUARDRAIL, MISC.:TENSIONED CABLE ANCHOR TERMINAL | 5 EACH | $2,420 |
| 625E32000 GROUND ROD Section 1 - ROADWAY - Totals Awd $3,897,347.40 | 42 EACH | $125 |
| 659E10000 SEEDING AND MULCHING | 56,223 SY | $0.25 |
| 659E20000 COMMERCIAL FERTILIZER | 8.35 TON | $69.00 |
| 659E31000 LIME | 11.62 ACRE | $5.00 |
| 659E35000 WATER | 303 MGAL | $0.20 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $15,750.60 | 1,000 EACH | $1.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,830 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →