MAR-SR 746-09.05
MAR County · est $1.2M
Bid dateThursday, April 23—
Awarded toDOUBLE Z CONSTRUCTION COMPANY$1.34M
MAR County · est $1.2M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 203 CY | $1,350 | $274k | 20% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $250,000 | $250k | 19% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 358 FT | $260 | $93k | 7% |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 125 SY | $550 | $69k | 5% |
| 514E27700 FIELD PAINTING, MISC.: COATING OF BEAM ENDS | 315 SF | $198 | $62k | 5% |
| 509E30030 NO. 5 DEFORMED GFRP REINFORCEMENT | 36,350 FT | $1.6 | $58k | 4% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $85,500.00 2 $105,500.00 3 $149,500.00 | 1 LS | $50,000 | $50k | 4% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $45,000 | $45k | 3% |
| 516E45305 REFURBISH BEARING DEVICE, AS PER PLAN | 10 EACH | $3,500 | $35k | 3% |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $3,200 | $32k | 2% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 55 more items below.
| Item | Quantity | R1Double Z Construction Company | R2Complete General Construction Company | R3Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 203 CY | $1,350 | $1,300 | $1,350 | 24% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $250,000 | $345,000 | $264,600 | 22% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 358 FT | $260 | $246 | $200 | 8% |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 125 SY | $550 | $480 | $650 | 6% |
| 514E27700 FIELD PAINTING, MISC.: COATING OF BEAM ENDS | 315 SF | $198 | $175 | $179 | 5% |
| 509E30030 NO. 5 DEFORMED GFRP REINFORCEMENT | 36,350 FT | $1.60 | $1.60 | $1.50 | 5% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $85,500.00 2 $105,500.00 3 $149,500.00 | 1 LS | $50,000 | $60,000 | $75,000 | 4% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $45,000 | $34,000 | $41,000 | 4% |
| 516E45305 REFURBISH BEARING DEVICE, AS PER PLAN | 10 EACH | $3,500 | $2,500 | $4,200 | 3% |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $3,200 | $1,110 | $1,232 | 3% |
| 513E10221 STRUCTURAL STEEL MEMBERS, LEVEL 1, AS PER PLAN | 648 LB | $46.00 | $43.75 | $57.50 | 3% |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 16 CY | $1,700 | $1,500 | $3,300 | 2% |
| 526E90010 TYPE A INSTALLATION | 65 FT | $340 | $300 | $400 | 2% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $20,000 | $24,000 | $30,000 | 2% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 81 CY | $240 | $290 | $600 | 2% |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 6,228 LB | $2.50 | $2.25 | $2.99 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $15,000 | $16,000 | $20,000 | 1% |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 9,790 FT | $1.45 | $1.42 | $1.50 | 1% |
| 625E33000 STRUCTURE GROUNDING SYSTEM Section 7 - STRUCTURE REPAIR (MAR-00746-09.050) - Totals Awd $1,123,563.65 2 $1,137,125.55 3 $1,183,960.22 | 1 EACH | $13,776 | $16,000 | $38,600 | 1% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 45 CY | $300 | $325 | $900 | 1% |
| Item | Quantity | R1Double Z Construction Company | R2Complete General Construction Company | R3Shelly & Sands INC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $5,000 | $10,000 |
| 202E23000 PAVEMENT REMOVED | 237.23 SY | $45.00 | $21.00 | $30.00 |
| 202E38000 GUARDRAIL REMOVED | 200 FT | $8.00 | $2.00 | $4.00 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $80.00 | $350 | $160 |
| 203E10000 EXCAVATION | 85 CY | $80.00 | $30.00 | $50.00 |
| 203E20000 EMBANKMENT | 178 CY | $30.00 | $50.00 | $25.00 |
| 204E10000 SUBGRADE COMPACTION | 260 SY | $10.00 | $4.00 | $12.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $180 | $130 | $300 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 200 FT | $27.60 | $27.60 | $27.00 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 Section 1 - ROADWAY - Totals Awd $48,115.35 2 $40,001.83 3 $46,876.90 | 4 EACH | $2,520 | $2,520 | $2,700 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 8 SY | $200 | $165 | $250 |
| 659E00300 TOPSOIL | 56.61 CY | $85.00 | $45.00 | $100 |
| 659E10000 SEEDING AND MULCHING | 510 SY | $10.00 | $6.50 | $15.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 26 SY | $4.80 | $1.50 | $1.00 |
| 659E15000 INTER-SEEDING | 26 SY | $4.80 | $0.10 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.07 TON | $750 | $750 | $1,000 |
| 659E31000 LIME | 0.11 ACRE | $10.00 | $90.00 | $175 |
| 659E35000 WATER | 2 MGAL | $1.00 | $0.50 | $1.00 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $12,817.05 2 $8,287.45 3 $16,454.25 | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 20 FT | $10.00 | $25.00 | $55.00 |
| 605E31100 AGGREGATE DRAINS | 50 FT | $20.00 | $25.00 | $50.00 |
| 611E01500 6" CONDUIT, TYPE F | 20 FT | $10.00 | $60.00 | $35.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET Section 3 - DRAINAGE - Totals Awd $1,850.00 2 $3,250.00 3 $4,800.00 | 1 EACH | $450 | $300 | $500 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, VARIABLE DEPTH | 118 SY | $22.00 | $22.00 | $60.00 |
| 304E20000 AGGREGATE BASE | 104 CY | $105 | $140 | $200 |
| 407E20000 NON-TRACKING TACK COAT | 60 GAL | $4.25 | $4.25 | $3.50 |
| 617E10100 COMPACTED AGGREGATE Section 4 - PAVEMENT - Totals Awd $49,711.00 2 $60,776.00 3 $120,065.00 | 25 CY | $120 | $210 | $115 |
| 626E00116 BARRIER REFLECTOR, TYPE 5, BIDIRECTIONAL | 16 EACH | $12.00 | $12.00 | $20.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 75 FT | $22.40 | $22.40 | $24.00 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $45.00 | $45.00 | $53.00 |
| 630E80100 SIGN, FLAT SHEET | 18 SF | $25.00 | $25.00 | $27.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 6 EACH | $15.00 | $15.00 | $54.00 |
| 644E00100 EDGE LINE, 4" | 0.04 MILE | $12,780 | $12,780 | $14,000 |
| 644E00300 CENTER LINE | 0.01 MILE | $24,500 | $24,500 | $26,000 |
| 646E10000 EDGE LINE, 4" | 0.09 MILE | $12,780 | $12,780 | $13,700 |
| 646E10200 CENTER LINE Section 5 - TRAFFIC CONTROL - Totals Awd $5,633.40 2 $5,633.40 3 $6,314.00 | 0.05 MILE | $24,500 | $24,500 | $24,500 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $70.00 | $95.00 | $110 |
| 614E12420 DETOUR SIGNING | 1 LS | $10,000 | $7,000 | $7,500 |
| 616E10000 WATER Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $12,975.00 2 $11,550.00 3 $12,900.00 | 5 MGAL | $35.00 | $150 | $200 |
| 202E22900 APPROACH SLAB REMOVED | 79 SY | $70.00 | $70.00 | $100 |
| 202E23500 WEARING COURSE REMOVED | 620 SY | $15.00 | $14.00 | $15.00 |
| 509E30040 NO. 6 DEFORMED GFRP REINFORCEMENT | 1,735 FT | $1.80 | $1.86 | $1.70 |
| 509E30060 NO. 8 DEFORMED GFRP REINFORCEMENT | 254 FT | $2.60 | $3.35 | $4.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 168 EACH | $30.00 | $20.00 | $35.00 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $5,000 | $4,500 | $7,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 136 SY | $54.00 | $35.25 | $38.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 15 EACH | $53.25 | $53.25 | $57.00 |
| 513E95030 STRUCTURAL STEEL, MISC.: DRILLED HOLES | 30 EACH | $86.00 | $86.00 | $86.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 43 SF | $16.00 | $17.00 | $4.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 97 FT | $40.00 | $48.00 | $51.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 38 CY | $140 | $120 | $160 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 412 FT | $20.00 | $20.00 | $18.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $10,000 | $10,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,500 | $4,500 | $25,000 |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $2,000 | $5,000 | $6,500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →