Bridge Repair
Darke County · plans pulled by 4 GCs
Darke County · plans pulled by 4 GCs
1 prime + 3 subs pulled plans · Bcc Ohio INC wins 53% of OH bridge bids it enters
If your number lands…historical win odds, OH
Share of OH bids over the last 5 years that landed there vs the official estimate and won (n=9,593 bids) — historical frequency, not a forecast. ODOT's estimate stays sealed until bids open.
Pulled plans1 prime · 3 subs
Likely also biddingOH bridge regulars · 7
Confirmed = pulled plans on this letting (revealed interest, from the agency portal). Likely = firms that bid OH bridgework in the last 3 years, ranked by where and how recently they bid it — firms most active in this project’s county and ODOT district rank first. Win rate is historical — the share of bids that firm entered and won, not a prediction of this letting.
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
Bid form · ODOT
24 advertised pay items from the ODOT bid form. Open a category to see its items — unit prices appear here once bids open.
| 513E95000 | STRUCTURAL STEEL, MISC.: REPAIR OF DAMAGED MAIN MEMBERS, COMPLETE PENETRATION WELDING | 1 FT |
| 514E20001 | FIELD PAINTING OF DAMAGED STRUCTURAL STEEL, AS PER PLAN | 40 SF |
| 849E10001 | DAMAGE ASSESSMENT, AS PER PLAN | Lump sum |
| 849E10500 | SURFACE PREPARATION | Lump sum |
| 849E10700 | STRAIGHTENING DAMAGED MEMBERS | Lump sum |
| 512E10600 | CONCRETE REPAIR BY EPOXY INJECTION | 18 FT |
| 513E90000 | STRUCTURAL STEEL, MISC.: REPAIR OF DAMAGED SECONDARY MATERIAL BY REPLACEMENT | 475 LB |
| 513E95000 | STRUCTURAL STEEL, MISC.: REPAIR OF DAMAGED MAIN MEMBERS, COMPLETE PENETRATION WELDING | 1 FT |
| 514E20001 | FIELD PAINTING OF DAMAGED STRUCTURAL STEEL, AS PER PLAN | 394 SF |
| 849E10001 | DAMAGE ASSESSMENT, AS PER PLAN | Lump sum |
| 849E10500 | SURFACE PREPARATION | Lump sum |
| 849E10600 | REPAIRING DAMAGED MEMBERS BY GRINDING | 1 HOUR |
| 849E10700 | STRAIGHTENING DAMAGED MEMBERS | Lump sum |
| 512E10600 | CONCRETE REPAIR BY EPOXY INJECTION | 8 FT |
| 513E95000 | STRUCTURAL STEEL, MISC.: REPAIR OF DAMAGED MAIN MEMBERS, COMPLETE PENETRATION WELDING | 2 FT |
| 514E20001 | FIELD PAINTING OF DAMAGED STRUCTURAL STEEL, AS PER PLAN | 484 SF |
| 514E27700 | FIELD PAINTING, MISC.: ZINC RICH PRIMER | 12 SF |
| 849E10001 | DAMAGE ASSESSMENT, AS PER PLAN | Lump sum |
| 849E10500 | SURFACE PREPARATION | Lump sum |
| 849E10700 | STRAIGHTENING DAMAGED MEMBERS | Lump sum |
| 103E05000 | PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYMENT BOND | Lump sum |
| 614E11000 | MAINTAINING TRAFFIC | Lump sum |
| 624E10000 | MOBILIZATION | Lump sum |
| 614E11110 | LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSISTANCE | 60 HOUR |