Two Lane Resurfacing
Coshocton County · plans pulled by 1 GCs
Coshocton County · plans pulled by 1 GCs
1 sub pulled plans · Shelly & Sands INC wins 52% of OH pavement bids it enters
If your number lands…historical win odds, OH
Share of OH bids over the last 5 years that landed there vs the official estimate and won (n=9,593 bids) — historical frequency, not a forecast. ODOT's estimate stays sealed until bids open.
Pulled plans1 sub
Likely also biddingOH pavement regulars · 8
Confirmed = pulled plans on this letting (revealed interest, from the agency portal). Likely = firms that bid OH pavementwork in the last 3 years, ranked by where and how recently they bid it — firms most active in this project’s county and ODOT district rank first. Win rate is historical — the share of bids that firm entered and won, not a prediction of this letting.
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
Bid form · ODOT
57 advertised pay items from the ODOT bid form. Open a category to see its items — unit prices appear here once bids open.
| 252E01500 | FULL DEPTH PAVEMENT SAWING | 457 FT |
| 253E02000 | PAVEMENT REPAIR (A) | 3,150 CY |
| 253E02000 | PAVEMENT REPAIR (B) | 60 CY |
| 254E01000 | PAVEMENT PLANING, ASPHALT CONCRETE, 1.50" | 165,174 SY |
| 254E01000 | PAVEMENT PLANING, ASPHALT CONCRETE, 2.25" | 4,809 SY |
| 407E20000 | NON-TRACKING TACK COAT | 21,470 GAL |
| 408E10001 | PRIME COAT, AS PER PLAN | 10,855 GAL |
| 409E30000 | SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINTS | 144 FT |
| 441E50101 | ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS PER PLAN, PG70- | 6,179 CY |
| 441E50201 | ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448), AS PER PLAN, PG64-22 | 4,173 CY |
| 441E70000 | ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG64-22 | 247 CY |
| 452E11010 | 7" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 13 SY |
| 516E31011 | 2" DEEP JOINT SEALER, AS PER PLAN | 144 FT |
| 617E10101 | COMPACTED AGGREGATE, AS PER PLAN | 1,508 CY |
| 202E23000 | PAVEMENT REMOVED | 15 SY |
| 202E23500 | WEARING COURSE REMOVED | 7,067 SY |
| 202E30000 | WALK REMOVED | 880 SF |
| 202E58500 | CATCH BASIN ABANDONED | 1 EACH |
| 203E10000 | EXCAVATION | 6 CY |
| 209E72051 | PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLAN | 23.13 MILE |
| 608E10000 | 4" CONCRETE WALK | 523 SF |
| 608E15000 | 8" CONCRETE WALK | 224 SF |
| 608E52001 | CURB RAMP, AS PER PLAN (A) | 144 SF |
| 608E52001 | CURB RAMP, AS PER PLAN (B) | 66 SF |
| 608E53020 | DETECTABLE WARNING | 32 SF |
| 609E26000 | CURB, TYPE 6 | 129 FT |
| 623E40000 | MONUMENT ASSEMBLY REMOVED AND RESET | 2 EACH |
| 621E00100 | RPM | 1,074 EACH |
| 621E54000 | RAISED PAVEMENT MARKER REMOVED | 1,074 EACH |
| 644E00104 | EDGE LINE, 6" | 23.16 MILE |
| 644E00300 | CENTER LINE | 11.73 MILE |
| 644E00500 | STOP LINE | 833 FT |
| 644E00620 | CROSSWALK LINE, 12" | 761 FT |
| 644E01000 | RAILROAD SYMBOL MARKING | 6 EACH |
| 644E01200 | PARKING LOT STALL MARKING | 1,740 FT |
| 644E20800 | YIELD LINE | 24 FT |
| 646E10010 | EDGE LINE, 6" | 0.06 MILE |
| 646E10200 | CENTER LINE | 0.03 MILE |
| 646E10510 | CROSSWALK LINE, 12" | 90 FT |
| 647E20212 | HANDICAP SYMBOL MARKING, TYPE B125 | 3 EACH |
| 614E11110 | LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSISTANCE | 50 HOUR |
| 614E12460 | WORK ZONE MARKING SIGN | 35 EACH |
| 614E13000 | ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY |
| 614E21550 | WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 23.46 MILE |
| 614E26610 | WORK ZONE STOP LINE, CLASS III, 642 PAINT | 200 FT |
| 100E00300 | PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY AND PROPERTY DAMAGE LIABILITY INSURANCE | Lump sum |
| 103E05000 | PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYMENT BOND | Lump sum |
| 614E11000 | MAINTAINING TRAFFIC | Lump sum |
| 623E10000 | CONSTRUCTION LAYOUT STAKES AND SURVEYING | Lump sum |
| 624E10000 | MOBILIZATION | Lump sum |
| 611E98631 | CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 10 EACH |
| 611E98635 | CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN | 1 EACH |
| 611E99654 | MANHOLE ADJUSTED TO GRADE | 10 EACH |
| 638E10800 | VALVE BOX ADJUSTED TO GRADE | 18 EACH |
| 653E10001 | TOPSOIL FURNISHED AND PLACED, AS PER PLAN | 10 CY |
| 659E00500 | SEEDING AND MULCHING, CLASS 1 | 83 SY |
| 832E30000 | EROSION CONTROL | 1,000 EACH |