Ohio DOT · bid history
| Result | Project | County | Let | Their bid | Winning bid |
|---|---|---|---|---|---|
| Wonof 3 | D11-SP FY2026Pavement | D11 | Apr 2026 | $1.29M | $1.29M |
| Rank 2of 3 | HAS-SR 151-00.00Pavement | HAS | Mar 2026 | $2.54M | $2.37M |
| Rank 2of 2 | MOE-CR 81-01.07Pavement | MOE | Mar 2026 | $169k | $152k |
| Rank 3of 3 | CAR-SR 39-23.34Pavement | CAR | Jan 2026 | $6.10M | $5.39M |
| Rank 2of 2 | JEF-SR 7-(10.75)(14.61)Pavement | JEF | Dec 2025 | $5.95M | $5.39M |
| Wonof 3 | MUS-US 22/SR 83-26.63/00.00Pavement | MUS | Nov 2025 | $5.77M | $5.77M |
| Rank 3of 3 | MUS-/LIC-IR 70-00.76/28.91Pavement | MUS | Oct 2025 | $6.36M | $6.00M |
| Rank 2of 3 | BEL-SR 147-04.90Pavement | BEL | Oct 2025 | $4.00M | $3.50M |
| Wonof 4 | COL-SR 39/SR 45-13.06/00.37Pavement | COL | Sep 2025 | $1.35M | $1.35M |
| Rank 3of 3 | MUS-SR 60-08.03Pavement | MUS | Sep 2025 | $4.17M | $3.24M |
| Rank 2of 2 | GUE-IR 70-12.32Pavement | GUE | Sep 2025 | $8.05M | $7.83M |
| Rank 2of 2 | MRG-SR 78-18.91Pavement | MRG | Aug 2025 | $5.51M | $5.46M |
| Rank 2of 2 | NOB-CR 19-00.00Pavement | NOB | Jun 2025 | $606k | $521k |
| Rank 2of 4 | BEL-IR 70-07.64Pavement | BEL | Jun 2025 | $1.48M | $1.16M |
| Rank 4of 4 | TUS-US 250-12.79Pavement | TUS | May 2025 | $6.14M | $5.03M |
| Rank 3of 3 | D05-Spot Paving FY2026Pavement | D05 | May 2025 | $2.48M | $1.48M |
| Rank 2of 4 | JEF-SR 43-08.40Signals | JEF | May 2025 | $1.33M | $1.22M |
| Rank 4of 5 | JEF-SR 150-03.544Signals | JEF | May 2025 | $646k | $499k |
| Rank 2of 3 | D11-SP FY2025Pavement | D11 | Apr 2025 | $252k | $249k |
| Rank 4of 4 | COL-ODNR GUILFORD LAKE STATE PARPavement | COL | Feb 2025 | $1.39M | $986k |
| Rank 2of 2 | MUS-SR 208-00.00 (PART 1 AND PART 2)Pavement | MUS | Feb 2025 | $10.6M | $9.64M |
| Wonof 3 | JEF-SR 43-02.00Pavement | JEF | Feb 2025 | $1.72M | $1.72M |
| Rank 3of 4 | NOB-SR 821-08.31Pavement | NOB | Jan 2025 | $1.70M | $1.29M |
| Rank 4of 4 | MRG-Appalachian Hills WLA-NR1Pavement | MRG | Jan 2025 | $384k | $304k |
| Wonof 3 | BEL-N Sugar St Pavement RehabPavement | BEL | Jan 2025 | $385k | $385k |
| Wonof 3 | JEF-SR 43-20.94Pavement | JEF | Jan 2025 | $902k | $902k |
| Rank 2of 2 | HAS-US 22-00.00Pavement | HAS | Dec 2024 | $4.24M | $4.14M |
| Rank 2of 3 | BEL-SR 7-02.24Pavement | BEL | Dec 2024 | $1.93M | $1.65M |
| Rank 2of 2 | GUE-IR 70-09.43Pavement | GUE | Dec 2024 | $6.43M | $6.16M |
| Rank 2of 2 | GUE-/MUS/NOB-SR 146/SR 340/SR 672 VARPavement | GUE | Dec 2024 | $4.88M | $4.77M |
| Rank 2of 2 | NOB-IR 77-00.00 WAS-IR 77-13.19 NBPavement | NOB | Nov 2024 | $6.93M | $5.82M |
| Rank 2of 3 | JEF-SR 150/VAR-03.43/VARPavement | JEF | Nov 2024 | $5.69M | $5.39M |
| Rank 5of 6 | NOB-IR 77-06.40Pavement | NOB | Nov 2024 | $4.25M | $2.78M |
| Rank 2of 2 | HAS-US 250-04.20Pavement | HAS | Oct 2024 | $6.85M | $6.42M |
| Rank 2of 2 | NOB-SR 313-00.00/SR 761-00.00Pavement | NOB | Sep 2024 | $3.03M | $2.44M |
| Wonof 3 | BEL-US 40/VAR-27.47/VARPavement | BEL | Sep 2024 | $2.63M | $2.63M |
| Wonof 3 | HAS-/JEF-US 250-30.20/00.00Pavement | HAS | Jul 2024 | $1.27M | $1.27M |
| Rank 2of 2 | NOB-CR 5-00.00Pavement | NOB | Jul 2024 | $576k | $542k |
| Rank 2of 2 | MOE-CR 22-00.00Pavement | MOE | Jun 2024 | $1.47M | $1.40M |
| Wonof 2 | MOE-SR 537-00.00 SR 800-17.92Pavement | MOE | Jun 2024 | $5.28M | $5.28M |
| Wonof 3 | D11-SP FY2024(B)Pavement | D11 | Jun 2024 | $1.06M | $1.06M |
| Rank 2of 2 | GUE-IR 70-06.51Pavement | GUE | Jun 2024 | $4.28M | $4.12M |
| Rank 2of 2 | TUS-NP Shared Use Path Phase 1Safety | TUS | May 2024 | $2.95M | $2.88M |
| Rank 2of 2 | MRG-CR 4/VAR-01.38/VARPavement | MRG | Mar 2024 | $2.05M | $1.81M |
| Rank 3of 3 | COL-SR 39-02.61Pavement | COL | Mar 2024 | $8.38M | $8.21M |
| Rank 2of 2 | BEL-SR 7-12.07Pavement | BEL | Feb 2024 | $1.82M | $1.77M |
| Wonof 2 | JEF-SR 646-00.00Pavement | JEF | Feb 2024 | $1.10M | $1.10M |
| Rank 2of 2 | WAS-SR 821-04.444Pavement | WAS | Feb 2024 | $5.31M | $4.34M |
| Rank 2of 2 | MOE-CR 29-07.02Pavement | MOE | Feb 2024 | $507k | $415k |
| Rank 2of 3 | COL-SR 7-03.56Pavement | COL | Jan 2024 | $1.95M | $1.79M |
| Wonof 3 | BEL-SR 647-01.62Pavement | BEL | Jan 2024 | $1.61M | $1.61M |
| Rank 2of 2 | JEF-US 22-03.86Pavement | JEF | Jan 2024 | $3.64M | $3.27M |
| Rank 2of 2 | MUS-SR 284-00.00Pavement | MUS | Jan 2024 | $4.29M | $3.56M |
| Rank 2of 2 | BEL-SR 26/SR 331-00.00/02.20Pavement | BEL | Dec 2023 | $3.60M | $3.23M |
| Wonof 2 | BEL-/JEF-SR 7-23.51/00.00Pavement | BEL | Dec 2023 | $3.80M | $3.80M |
| Rank 3of 3 | COL-US 30-12.79, COL-SR 11-10.82Pavement | COL | Nov 2023 | $2.97M | $2.66M |
| Wonof 2 | TUS-IR 77-00.00Pavement | TUS | Nov 2023 | $3.58M | $3.58M |
| Rank 2of 2 | TUS-SR 258-00.49Pavement | TUS | Nov 2023 | $2.40M | $2.21M |
| Rank 3of 6 | HAS-SR 342-03.88Earthwork | HAS | Oct 2023 | $489k | $316k |
| Rank 3of 3 | CAR-SR 39-10.23, CAR-SR 43-16.31Pavement | CAR | Sep 2023 | $3.58M | $3.19M |
| Rank 3of 3 | COL-SR 164/SR 644-15.72/03.96Pavement | COL | Sep 2023 | $2.96M | $2.75M |
| Rank 2of 2 | NOB-SR 78-00.00 NOB-SR 821-07.46Pavement | NOB | Jun 2023 | $5.12M | $4.58M |
| Wonof 2 | D11-SP FY2024(A)Pavement | D11 | Jun 2023 | $2.23M | $2.23M |
| Rank 2of 2 | COS-SR 83-00.00Pavement | COS | May 2023 | $3.34M | $3.10M |
| Rank 3of 4 | JEF-SR 151-12.45Signals | JEF | May 2023 | $642k | $581k |
| Rank 2of 2 | BEL-SR 149-10.99Pavement | BEL | Apr 2023 | $10.0M | $9.87M |
| Rank 2of 2 | BEL-IR 470-00.00Pavement | BEL | Apr 2023 | $6.52M | $6.40M |
| Rank 3of 3 | MUS-SR 60-14.61/17.93Pavement | MUS | Apr 2023 | $6.17M | $5.37M |
| Rank 2of 3 | JEF-CR 10-02.10Pavement | JEF | Apr 2023 | $879k | $877k |
| Rank 5of 7 | NOB-Appalachian Hills WLAPavement | NOB | Mar 2023 | $1.18M | $1.07M |
| Rank 8of 9 | GUE-SR 265-05.68Earthwork | GUE | Feb 2023 | $176k | $124k |
| Rank 4of 6 | BEL-SR 9-18.70Earthwork | BEL | Jan 2023 | $349k | $269k |
| Wonof 3 | JEF-SR 152-21.96Pavement | JEF | Dec 2022 | $1.48M | $1.48M |
| Rank 2of 2 | NOB-SR 339-00.00/SR 574-00.00Pavement | NOB | Dec 2022 | $5.36M | $4.62M |
| Rank 4of 4 | CAR-/HAS-SR 212-VARPavement | CAR | Dec 2022 | $2.46M | $2.08M |
| Rank 3of 3 | COL-US 30-31.21, COL-SR 39-19.83Pavement | COL | Dec 2022 | $8.32M | $6.94M |
| Rank 2of 2 | GUE-SR 513/SR 761-00.00/00.00Pavement | GUE | Nov 2022 | $5.11M | $3.92M |
| Rank 2of 2 | BEL-IR 70-00.00Pavement | BEL | Oct 2022 | $4.96M | $4.39M |
| Rank 2of 2 | JEF-SR 7-19.21Pavement | JEF | Sep 2022 | $6.03M | $4.66M |
| Rank 2of 2 | MOE-CR 106-00.00Pavement | MOE | Jul 2022 | $467k | $380k |
| Wonof 2 | WAS-IR 77-06.63 SBPavement | WAS | Jul 2022 | $6.03M | $6.03M |
| Rank 3of 3 | HAS-SR 519-06.38Pavement | HAS | Jun 2022 | $875k | $509k |
| Wonof 2 | MRG-Jesse Owens SP FY22Maintenance | MRG | May 2022 | $1.37M | $1.37M |
| Rank 2of 2 | GUE-/MUS/COS-SR 662-00.00/00.00/00.00Pavement | GUE | May 2022 | $7.17M | $6.83M |
| Rank 5of 7 | BEL-CR 56-33.21/34.26Earthwork | BEL | Apr 2022 | $500k | $429k |
| Rank 2of 3 | D11-SP FY2022Pavement | D11 | Apr 2022 | $1.97M | $1.40M |
| Rank 2of 2 | JEF-SR 43-00.00Pavement | JEF | Apr 2022 | $1.40M | $1.09M |
| Rank 2of 2 | NOB-CR 2/CR 20-00.00/04.67Pavement | NOB | Mar 2022 | $1.95M | $1.77M |
| Rank 2of 3 | BEL-IR 70-15.72Pavement | BEL | Mar 2022 | $7.97M | $6.21M |
| Rank 2of 2 | TUS-SR 258-00.00Pavement | TUS | Mar 2022 | $2.87M | $2.07M |
| Rank 6of 6 | HAS-Country Club Rd SidewalksSafety | HAS | Feb 2022 | $324k | $223k |
| Wonof 2 | GUE-US 22/US 40-07.62/08.23Pavement | GUE | Feb 2022 | $3.10M | $3.10M |
| Rank 4of 6 | COL-SR 267-01.74Pavement | COL | Jan 2022 | $1.17M | $1.02M |
| Rank 3of 5 | COL-SR 11-15.99Pavement | COL | Dec 2021 | $3.62M | $2.86M |
| Rank 2of 4 | CAR-SR 644-00.00Pavement | CAR | Dec 2021 | $2.08M | $1.99M |
| Rank 2of 2 | GUE-Salt Fork Resurfacing FY22Pavement | GUE | Dec 2021 | $1.07M | $907k |
| Rank 2of 2 | NOB-SR 145-00.00 WAS-SR 145-00.00Pavement | NOB | Nov 2021 | $3.76M | $2.85M |
| Rank 2of 2 | NOB-IR 77-00.00Pavement | NOB | Nov 2021 | $2.62M | $1.97M |
| Rank 2of 2 | MRG-SR 555-15.34Pavement | MRG | Oct 2021 | $5.34M | $4.54M |
| Wonof 2 | BEL-SR 7-17.70Pavement | BEL | Oct 2021 | $2.22M | $2.22M |
| Rank 2of 2 | TUS-/HAS-US 250-23.47/00.00Pavement | TUS | Oct 2021 | $11.4M | $10.2M |
| Wonof 2 | MUS-IR 70-21.64Pavement | MUS | Sep 2021 | $5.67M | $5.67M |
| Rank 2of 2 | BEL-SR 7-05.88Pavement | BEL | Sep 2021 | $3.35M | $3.13M |
| Rank 2of 8 | JEF-CR 6-05.39Earthwork | JEF | Aug 2021 | $213k | $210k |
| Rank 2of 2 | LIC-/MUS-IR 70-23.84/00.00Pavement | LIC | Jul 2021 | $6.80M | $6.32M |
| Rank 2of 2 | COS-SR 93/SR 93D-03.52/00.00Pavement | COS | Jul 2021 | $2.60M | $2.30M |
| Rank 2of 2 | MOE-CR 28-00.00Pavement | MOE | Jul 2021 | $496k | $489k |
| Rank 2of 3 | HAS-SR 9-22.44Pavement | HAS | Jun 2021 | $530k | $480k |
| Rank 2of 3 | JEF-TR 167-03.13Pavement | JEF | Jun 2021 | $415k | $402k |
| Rank 2of 2 | MOE-SR 26-17.91Pavement | MOE | Jun 2021 | $5.35M | $4.93M |
| Rank 2of 2 | NOB-SR 147-03.50Pavement | NOB | May 2021 | $6.95M | $6.89M |
| Rank 2of 3 | JEF-SR 43-11.07Pavement | JEF | May 2021 | $2.82M | $2.68M |
| Rank 4of 4 | D11-SP FY2021Pavement | D11 | Apr 2021 | $1.66M | $1.20M |
| Wonof 3 | HAS-CR 5-04.78Pavement | HAS | Apr 2021 | $143k | $143k |
| Rank 2of 2 | MUS-SR 60-00.00 (PART 1 AND PART 2)Pavement | MUS | Apr 2021 | $22.2M | $19.9M |
| Rank 2of 3 | MUS-IR 70-05.57Pavement | MUS | Apr 2021 | $3.02M | $2.95M |
| Rank 3of 9 | COL-SR 164-04.53Pavement | COL | Feb 2021 | $911k | $766k |
| Rank 4of 10 | MOE-WNF Drainage Improvement Ph1Drainage | MOE | Feb 2021 | $422k | $350k |
| Rank 2of 2 | BEL-IR 70-05.04Pavement | BEL | Jan 2021 | $3.06M | $2.88M |
| Wonof 3 | HAS-US 250-19.17Pavement | HAS | Jan 2021 | $978k | $978k |
| Rank 2of 3 | BEL-SR 147/VAR-13.23/VARPavement | BEL | Jan 2021 | $3.18M | $2.84M |
| Wonof 5 | JEF-SR 150A/SR 7 Park & RidePavement | JEF | Jan 2021 | $282k | $282k |
| Rank 3of 3 | COS-SR 93/93D-03.52/00.00Pavement | COS | Dec 2020 | $2.21M | $1.74M |
| Rank 8of 10 | HAS-SR 342-01.79Earthwork | HAS | Dec 2020 | $107k | $83k |
| Rank 3of 3 | MOE-SR 255-11.66Pavement | MOE | Dec 2020 | $6.28M | $5.47M |
| Rank 2of 2 | WAS-IR 77-06.63Pavement | WAS | Nov 2020 | $4.31M | $3.82M |
| Rank 4of 4 | COS-US 36-26.49Pavement | COS | Nov 2020 | $6.14M | $5.25M |
| Rank 4of 6 | HAS-SR 646-01.21Earthwork | HAS | Nov 2020 | $203k | $148k |
| Rank 2of 2 | JEF-US 22-00.00Pavement | JEF | Nov 2020 | $2.90M | $2.67M |
| Rank 2of 2 | JEF-US 22-10.13Pavement | JEF | Nov 2020 | $3.14M | $2.98M |
| Rank 3of 3 | JEF-CR 2-02.54Pavement | JEF | Oct 2020 | $559k | $504k |
| Rank 2of 2 | JEF-SR 7-06.40Pavement | JEF | Oct 2020 | $1.99M | $1.91M |
| Rank 4of 7 | BEL-SR 148-09.36Earthwork | BEL | Sep 2020 | $134k | $97k |
| Rank 2of 4 | TUS-US 36-17.49, TUS-US 250-21.35Pavement | TUS | Sep 2020 | $2.49M | $2.49M |
| Rank 2of 2 | MRG-SR 376-00.00Pavement | MRG | Aug 2020 | $4.06M | $3.84M |
| Rank 2of 3 | BEL-SR 149-32.69Pavement | BEL | Aug 2020 | $997k | $986k |
| Rank 3of 7 | BEL-SR 647-02.27Earthwork | BEL | Jul 2020 | $157k | $130k |
| Rank 5of 9 | JEF-SR 164-09.40Earthwork | JEF | Jul 2020 | $285k | $209k |
| Rank 2of 2 | GUE-US 22/SR 800-15.16/00.00Pavement | GUE | Jun 2020 | $4.45M | $4.15M |
| Wonof 6 | BEL-SR 647-02.70Earthwork | BEL | May 2020 | $272k | $272k |
| Rank 2of 2 | NOB-IR 77-02.50Pavement | NOB | May 2020 | $378k | $337k |
| Wonof 3 | JEF-SR 43-04.48Pavement | JEF | May 2020 | $885k | $885k |
| Rank 2of 4 | GUE-Salt Fork Resurfacing FY20Pavement | GUE | May 2020 | $2.26M | $2.20M |
| Rank 3of 4 | D11-SP-FY2020Pavement | D11 | Apr 2020 | $990k | $952k |
| Rank 3of 3 | HAS-SR 258-00.00Pavement | HAS | Apr 2020 | $2.39M | $2.24M |
| Rank 2of 3 | HAS-SR 519-06.78Pavement | HAS | Mar 2020 | $1.15M | $994k |
| Wonof 3 | BEL-SR 647-00.00Pavement | BEL | Mar 2020 | $440k | $440k |
| Rank 2of 2 | COS-CR 9-00.00Pavement | COS | Feb 2020 | $1.39M | $1.16M |
| Rank 2of 3 | JEF-/COL-SR 7-31.13/00.00Pavement | JEF | Feb 2020 | $7.31M | $6.73M |
| Rank 4of 4 | COL-US 30-28.03Pavement | COL | Feb 2020 | $2.70M | $2.53M |
| Wonof 3 | HAS-US 250-22.03Pavement | HAS | Dec 2018 | $2.28M | $2.28M |
| Rank 2of 2 | BEL-SR 800-00.00Pavement | BEL | Dec 2018 | $6.08M | $5.17M |
| Rank 2of 2 | GUE-IR 77-00.00Pavement | GUE | Dec 2018 | $3.68M | $3.04M |
| Rank 2of 10 | GUE-Salt Fork Culverts FY 2019Drainage | GUE | Nov 2018 | $181k | $173k |
| Rank 2of 3 | BEL-SR 149-00.28Pavement | BEL | Nov 2018 | $580k | $505k |
| Rank 6of 6 | COL-US 30-17.80Pavement | COL | Oct 2018 | $432k | $295k |
| Rank 4of 4 | TUS-IR 77-12.39Pavement | TUS | Oct 2018 | $4.05M | $3.46M |
| Rank 2of 2 | COS-SR 541/SR 206-08.73/00.00Pavement | COS | Oct 2018 | $3.91M | $3.67M |
| Rank 4of 5 | NOB-SR 313-00.67Earthwork | NOB | Oct 2018 | $255k | $160k |
| Rank 3of 3 | MOE-Monroe Lake ODNRPavement | MOE | Sep 2018 | $240k | $195k |
| Rank 2of 2 | MRG-SR 60-09.36Pavement | MRG | Sep 2018 | $3.29M | $2.88M |
| Rank 6of 7 | COL-SR 518-0.00/4.80Pavement | COL | Sep 2018 | $1.09M | $923k |
| Rank 2of 2 | MRG-/WAS-SR 83-00.00/01.35 WAS-SR 530-00.00Pavement | MRG | Aug 2018 | $3.86M | $3.23M |
| Rank 2of 2 | BEL-SR 149/SR 331-30.85/00.00, HAS-SR 331-00.00Pavement | BEL | Aug 2018 | $3.12M | $2.60M |
| Wonof 5 | BEL-SR 647-03.38Earthwork | BEL | Jul 2018 | $68k | $68k |
| Rank 2of 2 | MOE-SR 78-00.00Pavement | MOE | Jul 2018 | $2.39M | $2.26M |
| Rank 3of 4 | BEL-SR 7-11.00 & VARIOUSEarthwork | BEL | Jul 2018 | $102k | $71k |
| Rank 3of 5 | D11-SP-FY2019(A)Pavement | D11 | Jun 2018 | $919k | $848k |
| Rank 2of 2 | MOE-SR 26-16.33Pavement | MOE | Jun 2018 | $2.28M | $1.84M |
| Rank 6of 6 | TUS-SR 259-00.55Pavement | TUS | May 2018 | $515k | $328k |
| Rank 2of 2 | GUE-US 40/SR 285/SR 313 VARPavement | GUE | May 2018 | $5.12M | $4.96M |
| Rank 2of 2 | TUS-US 36-03.85Pavement | TUS | May 2018 | $2.55M | $2.22M |
| Rank 3of 3 | HAS-SP-FY2018(C)Maintenance | HAS | May 2018 | $460k | $389k |
| Rank 6of 6 | CAR-SR 39-00.00Pavement | CAR | Apr 2018 | $2.16M | $1.71M |
Source: public.bid_results, ODOT bid tabs. Bidder strings are normalized to upper-case but not yet entity-resolved, so related firms (e.g. "Shelly Company" vs "Shelly & Sands") are shown separately.