LAK-SR-SR 86-05.49
LAK County · est $0.5M
Bid dateThursday, January 25—
LAK County · est $0.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 16 more items below.
| Item | Quantity | R1Chagrin Valley Paving INC | R2Ronyak Paving INC | R3Kokosing Construction Company INC | R4Burton Scot Contractors LLC | R5Barbicas Construction Company INC | % of bid |
|---|---|---|---|---|---|---|---|
| 690E98700 SPECIAL - THINLAY ASPHALT CONCRETE, TYPE MED, AS P | 1,552 CY | $140 | $150 | $170 | $155 | $200 | 46% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $55,000 | $36,000 | $31,700 | $45,000 | $30,000 | 12% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A | — | $0.70 | $0.60 | $0.70 | $1.00 | $2.00 | 11% |
| Item | Quantity | R1Chagrin Valley Paving INC | R2Ronyak Paving INC | R3Kokosing Construction Company INC | R4Burton Scot Contractors LLC | R5Barbicas Construction Company INC |
|---|---|---|---|---|---|---|
| 209E60501 LINEAR GRADING, AS PER PLAN | 8.62 MILE | $250 | $700 | $270 | $900 | $300 |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 8.62 MILE | $250 | $2,000 | $2,000 | $1,550 | $400 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $26,000 |
| $38,000 |
| $20,000 |
| $20,000 |
| $10,000 |
| 5% |
| 646E10010 EDGE LINE, 6" | 9.64 MILE | $2,115 | $2,115 | $2,469 | $2,115 | $2,690 | 4% |
| 646E10200 CENTER LINE | 4.82 MILE | $3,720 | $3,720 | $2,634 | $3,720 | $3,670 | 4% |
| 407E20000 NON-TRACKING TACK COAT | 6,457 GAL | $2.00 | $2.25 | $2.00 | $2.50 | $5.00 | 3% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 150 SY | $75.00 | $160 | $70.00 | $80.00 | $30.00 | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 141 CY | $70.00 | $45.00 | $135 | $40.00 | $80.00 | 2% |
| 621E00100 RPM | 310 EACH | $25.95 | $26.50 | $24.50 | $26.50 | $25.95 | 2% |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 3,409 LB | $2.00 | $2.00 | $0.80 | $3.00 | $4.00 | 1% |
| 630E97800 SIGNING, MISC.:ADDITIONAL SIGNS, GROUND MOUNTED, A | 300 SF | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $75.00 | $45.00 | $60.00 | $59.00 | $65.00 | 1% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 22 CY | $250 | $500 | $563 | $575 | $250 | 1% |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 9.64 MILE | $515 | $515 | $485 | $515 | $485 | 1% |
| 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN | 8 EACH | $600 | $575 | $575 | $650 | $400 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,200 | $4,200 | $2,000 | $6,500 | $10,000 | 1% |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 9.64 MILE | $375 | $375 | $395 | $375 | $395 | 1% |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 4.82 MILE | $660 | $660 | $985 | $660 | $985 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 4.82 MILE | $525 | $525 | $750 | $525 | $750 | 1% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN |
| 2 EACH |
| $1,000 |
| $650 |
| $650 |
| $765 |
| $700 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 400 LB | $1.50 | $2.00 | $2.00 | $1.50 | $1.20 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $250 | $300 | $1,170 | $1,300 | $250 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 310 EACH | $1.00 | $3.00 | $4.50 | $8.00 | $4.00 |
| 646E10400 STOP LINE | 220 FT | $9.15 | $9.15 | $10.00 | $9.15 | $11.75 |
| 646E10500 CROSSWALK LINE | 64 FT | $5.30 | $5.30 | $7.00 | $5.30 | $5.85 |
| 646E20110 SCHOOL SYMBOL MARKING, 96" | 2 EACH | $350 | $350 | $590 | $350 | $590 |
| 690E98400 SPECIAL - INVENTORY EXISTING PAVEMENT MARKINGS | 1 LS | $1,375 | $1,375 | $750 | $1,375 | $750 |
| 614E12460 WORK ZONE MARKING SIGN | 22 EACH | $90.00 | $90.00 | $90.00 | $74.00 | $70.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $925 | $925 | $925 | $1,050 | $925 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 220 FT | $2.50 | $2.50 | $2.50 | $2.50 | $2.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 220 FT | $2.40 | $2.40 | $2.50 | $2.40 | $2.50 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $500 | $1,500 | $1,141 | $3,675 | $1,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 690E98700 SPECIAL - THINLAY ASPHALT CONCRETE, TYPE MED, AS P | 1,552 CY | $140 | $217k | 44% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $55,000 | $55k | 11% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A | — | $0.7 | $50k | 10% |
| 624E10000 MOBILIZATION | 1 LS | $26,000 | $26k | 5% |
| 646E10010 EDGE LINE, 6" | 9.64 MILE | $2,115 | $20k | 4% |
| 646E10200 CENTER LINE | 4.82 MILE | $3,720 | $18k | 4% |
| 407E20000 NON-TRACKING TACK COAT | 6,457 GAL | $2 | $13k | 3% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 150 SY | $75 | $11k | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 141 CY | $70 | $10k | 2% |
| 621E00100 RPM | 310 EACH | $25.95 | $8k | 2% |