Ohio DOT · bid history
| Result | Project | County | Let | Their bid | Winning bid |
|---|---|---|---|---|---|
| Rank 3of 5 | POR-US 224-00.00Pavement | POR | Apr 2026 | $12.2M | $11.0M |
| Wonof 4 | GEA-SR 528-14.52Pavement | GEA | Mar 2026 | $400k | $400k |
| Rank 3of 5 | POR-SR 82/SR 306-02.37/00.00Pavement | POR | Feb 2026 | $2.11M | $1.79M |
| Wonof 7 | CUY-SR 87-14.72Pavement | CUY | Feb 2026 | $669k | $669k |
| Rank 4of 7 | LAK-SR 84/VAR-18.21/VARPavement | LAK | Jan 2026 | $1.57M | $1.13M |
| Rank 2of 8 | LAK-SR 174-00.00Pavement | LAK | Jan 2026 | $1.73M | $1.73M |
| Rank 3of 4 | D12-PPM FY2026Pavement | D12 | Jan 2026 | $2.72M | $2.38M |
| Wonof 5 | POR-SR 82/VAR-10.64/VARPavement | POR | Jan 2026 | $4.05M | $4.05M |
| Wonof 6 | LAK-US 20-17.13Pavement | LAK | Dec 2025 | $901k | $901k |
| Rank 3of 7 | LAK-SR 174-04.39Pavement | LAK | Dec 2025 | $908k | $747k |
| Wonof 3 | D04-CHIP FY2026Pavement | D04 | Dec 2025 | $1.31M | $1.31M |
| Rank 2of 3 | GEA-/LAK-SR 44-18.39/00.00 RehabPavement | GEA | Dec 2025 | $11.5M | $10.6M |
| Rank 5of 5 | LAK-E 305th St. ResurfacePavement | LAK | Dec 2025 | $3.21M | $2.66M |
| Wonof 3 | ATB-US 20/SR 307-03.94/07.81Pavement | ATB | Dec 2025 | $1.89M | $1.89M |
| Wonof 5 | GEA-SR 88/US 422-02.05/15.52Pavement | GEA | Oct 2025 | $1.60M | $1.60M |
| Wonof 6 | GEA-SR 87-02.73Pavement | GEA | Sep 2025 | $1.36M | $1.36M |
| Wonof 1 | GEA-SR 86/SR 166-00.92/04.10Pavement | GEA | Sep 2025 | $815k | $815k |
| Rank 4of 4 | TRU-SR 193-17.77Pavement | TRU | Jul 2025 | $1.73M | $1.51M |
| Rank 2of 8 | SUM-SR 21-19.57/VARPavement | SUM | Jul 2025 | $873k | $812k |
| Rank 2of 2 | ATB-SR 7-14.95/18.44Pavement | ATB | Jun 2025 | $4.06M | $3.77M |
| Wonof 2 | ATB-US 322-08.11Pavement | ATB | May 2025 | $5.54M | $5.54M |
| Wonof 3 | CUY-Villaview RoadPavement | CUY | Apr 2025 | $2.90M | $2.90M |
| Rank 2of 5 | GEA-Punderson State ParkPavement | GEA | Mar 2025 | $846k | $828k |
| Rank 2of 2 | GEA-US 6-03.51/VARPavement | GEA | Feb 2025 | $4.77M | $4.59M |
| Wonof 3 | GEA-SR 44-00.00Pavement | GEA | Feb 2025 | $800k | $800k |
| Rank 2of 2 | ATB-SR 193-02.29/07.45Pavement | ATB | Feb 2025 | $3.32M | $3.03M |
| Rank 2of 2 | ATB-US 322/VAR-22.48/VARPavement | ATB | Feb 2025 | $2.77M | $2.58M |
| Wonof 2 | GEA-SR 86-05.37Pavement | GEA | Jan 2025 | $1.25M | $1.25M |
| Rank 2of 5 | TRU-SR 45-23.76Pavement | TRU | Dec 2024 | $1.19M | $1.15M |
| Wonof 5 | SUM-SR 82-00.14/08.04Pavement | SUM | Nov 2024 | $2.74M | $2.74M |
| Rank 2of 2 | D04-CHIP FY2025Pavement | D04 | Nov 2024 | $1.01M | $991k |
| Wonof 4 | ATB-US 6-00.00Pavement | ATB | Oct 2024 | $1.58M | $1.58M |
| Rank 2of 5 | POR-SR 225-11.04Pavement | POR | Jul 2024 | $1.73M | $1.61M |
| Wonof 4 | TRU-SR 534-19.12Pavement | TRU | May 2024 | $1.50M | $1.50M |
| Rank 3of 3 | D12-PPM FY2024Pavement | D12 | Mar 2024 | $2.16M | $1.84M |
| Wonof 6 | LAK-US 6-00.44Pavement | LAK | Mar 2024 | $1.14M | $1.14M |
| Rank 2of 2 | ATB-SR 84/SR 531-11.99/07.52Pavement | ATB | Mar 2024 | $2.42M | $2.23M |
| Wonof 3 | LAK-SR 640-00.00Pavement | LAK | Feb 2024 | $3.50M | $3.50M |
| Rank 3of 4 | TRU-US 422/SR 5-02.05/06.43Pavement | TRU | Feb 2024 | $5.86M | $5.34M |
| Wonof 6 | GEA-SR 608-00.00/05.22Pavement | GEA | Feb 2024 | $672k | $672k |
| Rank 2of 7 | CUY-US 6-26.65Pavement | CUY | Jan 2024 | $1.63M | $1.60M |
| Rank 3of 6 | LAK-Liberty StreetPavement | LAK | Jan 2024 | $1.12M | $970k |
| Rank 2of 7 | SUM-SR 18-01.01Pavement | SUM | Jan 2024 | $2.11M | $1.90M |
| Rank 2of 8 | POR-Frost Rd Ph 2 (Streetsboro)Pavement | POR | Dec 2023 | $499k | $497k |
| Rank 3of 4 | CUY-SR 17-12.58Pavement | CUY | Dec 2023 | $2.47M | $2.26M |
| Rank 2of 5 | GEA-SR 87-00.00Pavement | GEA | Oct 2023 | $1.22M | $1.14M |
| Rank 2of 3 | ATB-SR 11-22.16Pavement | ATB | Oct 2023 | $13.6M | $13.1M |
| Wonof 5 | SUM-SR 59-07.95Pavement | SUM | Aug 2023 | $3.55M | $3.55M |
| Rank 3of 4 | POR-SR 59-(06.05)(06.80)Pavement | POR | Aug 2023 | $2.80M | $2.77M |
| Rank 2of 4 | GEA-SR 88-03.40Pavement | GEA | Jun 2023 | $1.06M | $1.04M |
| Wonof 4 | GEA-LaDue Boat Launch PavementPavement | GEA | Jun 2023 | $76k | $76k |
| Rank 3of 3 | CUY-US 6-23.30Pavement | CUY | May 2023 | $3.64M | $2.92M |
| Wonof 4 | CUY-SR 82-09.12Pavement | CUY | May 2023 | $861k | $861k |
| Rank 4of 4 | ASD-/RIC-CHIP FY2023Pavement | ASD | Apr 2023 | $1.83M | $1.44M |
| Rank 4of 4 | D12-PPM FY2023Pavement | D12 | Apr 2023 | $4.64M | $3.70M |
| Rank 2of 5 | SUM-Valley View Rd (Macedonia)Pavement | SUM | Apr 2023 | $296k | $295k |
| Wonof 3 | ATB-US 6/SR 7-20.28/VARPavement | ATB | Apr 2023 | $1.39M | $1.39M |
| Rank 2of 4 | CUY-SR 14-10.05Pavement | CUY | Mar 2023 | $3.30M | $3.05M |
| Rank 2of 3 | MED-SR 606-00.00Pavement | MED | Mar 2023 | $398k | $359k |
| Rank 3of 8 | CUY-York RoadPavement | CUY | Mar 2023 | $907k | $848k |
| Wonof 3 | D04-CHIP FY2023Pavement | D04 | Feb 2023 | $721k | $721k |
| Rank 2of 5 | LAK-SR 86-01.68Pavement | LAK | Jan 2023 | $1.15M | $1.08M |
| Wonof 5 | CUY-SR 17-07.09Pavement | CUY | Jan 2023 | $11.5M | $11.5M |
| Rank 2of 4 | ATB-SR 193-14.57Pavement | ATB | Jan 2023 | $2.40M | $2.37M |
| Rank 2of 6 | GEA-SR 87-07.70Pavement | GEA | Jan 2023 | $1.37M | $1.33M |
| Wonof 3 | LAK-Kirtland RoadPavement | LAK | Dec 2022 | $300k | $300k |
| Rank 3of 6 | POR-SR 5/VAR-05.09/VARPavement | POR | Nov 2022 | $5.74M | $4.92M |
| Wonof 4 | ATB-IR 90-19.56Pavement | ATB | Sep 2022 | $3.08M | $3.08M |
| Wonof 4 | POR-SR 88-13.71Pavement | POR | Aug 2022 | $879k | $879k |
| Rank 3of 4 | ATB-US 20/SR 84-11.02/14.13Pavement | ATB | Jul 2022 | $1.32M | $1.26M |
| Rank 2of 6 | SUM-CR 17-23.27 Brecksville RdPavement | SUM | May 2022 | $1.12M | $1.08M |
| Rank 2of 3 | ATB-SR 84/VAR-21.80/VARPavement | ATB | Apr 2022 | $5.59M | $4.96M |
| Wonof 6 | POR-CR 256-00.00 E Mennonite RdPavement | POR | Apr 2022 | $512k | $512k |
| Rank 2of 5 | LOR-US 6-12.36Pavement | LOR | Apr 2022 | $1.33M | $1.22M |
| Rank 2of 4 | CUY-US 6/US 20-24.44/27.78Pavement | CUY | Mar 2022 | $5.54M | $5.20M |
| Rank 5of 7 | POR-CR 197-01.03 (Frost Rd)Pavement | POR | Mar 2022 | $792k | $690k |
| Rank 4of 4 | CUY-Cedar RoadPavement | CUY | Mar 2022 | $2.46M | $2.40M |
| Rank 5of 5 | LOR-CR 78-00.00 (Moore Rd)Pavement | LOR | Mar 2022 | $574k | $477k |
| Rank 3of 5 | CUY-SR 91-10.63Pavement | CUY | Mar 2022 | $956k | $848k |
| Rank 2of 5 | GEA-SR 87-15.93Pavement | GEA | Mar 2022 | $1.74M | $1.65M |
| Rank 3of 5 | CUY-SR 17-20.44Pavement | CUY | Feb 2022 | $910k | $865k |
| Rank 3of 4 | D04-CHIP FY2022Pavement | D04 | Feb 2022 | $1.31M | $1.19M |
| Wonof 6 | CUY-US 6-03.85Pavement | CUY | Jan 2022 | $1.32M | $1.32M |
| Wonof 5 | LAK-US 6-02.60Pavement | LAK | Jan 2022 | $1.52M | $1.52M |
| Wonof 4 | GEA-SR 87-12.51/VARPavement | GEA | Jan 2022 | $611k | $611k |
| Rank 2of 5 | CUY-SR 3-02.72Pavement | CUY | Dec 2021 | $1.70M | $1.67M |
| Wonof 4 | GEA-US 322-14.47Pavement | GEA | Dec 2021 | $944k | $944k |
| Rank 2of 6 | POR-SR 44/VAR-16.48/VAR (PART 1, 2, 3)Pavement | POR | Dec 2021 | $5.75M | $5.29M |
| Wonof 4 | GEA-US 6-08.86Pavement | GEA | Oct 2021 | $1.44M | $1.44M |
| Wonof 5 | GEA-SR 168-00.21Pavement | GEA | Oct 2021 | $420k | $420k |
| Rank 2of 4 | TRU-SR 534/VAR-00.00/VARPavement | TRU | Aug 2021 | $2.26M | $2.23M |
| Wonof 6 | CUY-US 42-11.01Pavement | CUY | Jul 2021 | $2.20M | $2.20M |
| Rank 2of 5 | TRU-SR 87-02.26Pavement | TRU | Jul 2021 | $1.89M | $1.85M |
| Rank 2of 4 | LOR-SR 254-06.39Pavement | LOR | Jun 2021 | $620k | $604k |
| Wonof 4 | ATB-SR 11-00.00Pavement | ATB | May 2021 | $2.86M | $2.86M |
| Rank 6of 7 | LOR-SR 58-24.66Pavement | LOR | Mar 2021 | $1.40M | $1.32M |
| Wonof 6 | GEA-SR 44-08.88Pavement | GEA | Mar 2021 | $1.31M | $1.31M |
| Rank 7of 7 | D04-CS FY2021Pavement | D04 | Mar 2021 | $1.69M | $866k |
| Rank 4of 4 | ATB-US 20-21.86 (PART 1, PART 2, PART 3)Pavement | ATB | Mar 2021 | $5.20M | $4.80M |
| Rank 3of 4 | LAK-SR 608-00.00Pavement | LAK | Mar 2021 | $693k | $609k |
| Rank 5of 7 | CUY-SR 14-06.09Pavement | CUY | Feb 2021 | $1.48M | $1.38M |
| Wonof 5 | LAK-US 20-28.14Pavement | LAK | Jan 2021 | $1.14M | $1.14M |
| Wonof 4 | GEA-SR 608-07.53Pavement | GEA | Jan 2021 | $627k | $627k |
| Rank 3of 7 | CUY-SR 17-00.00Pavement | CUY | Jan 2021 | $2.20M | $2.18M |
| Rank 7of 8 | LAK-SR 283-06.82Pavement | LAK | Dec 2020 | $697k | $498k |
| Rank 3of 5 | TRU-SR 82-22.74Pavement | TRU | Dec 2020 | $6.06M | $5.18M |
| Rank 2of 5 | MED-SR 18-00.00Pavement | MED | Dec 2020 | $2.16M | $2.14M |
| Wonof 8 | CUY-West 14th StreetPavement | CUY | Dec 2020 | $1.23M | $1.23M |
| Rank 3of 4 | TRU-SR 11-19.02Pavement | TRU | Dec 2020 | $5.97M | $5.45M |
| Rank 6of 6 | MED-SR 3-03.80Pavement | MED | Nov 2020 | $2.68M | $2.17M |
| Rank 3of 3 | D04-CHIP FY2021Pavement | D04 | Nov 2020 | $751k | $665k |
| Rank 3of 4 | LAK-SR 2-13.40Pavement | LAK | Oct 2020 | $841k | $699k |
| Rank 2of 5 | LAK-SR 84-03.61Pavement | LAK | Oct 2020 | $1.58M | $1.39M |
| Rank 4of 8 | POR-US 224/US 224D-13.51/00.00Pavement | POR | May 2020 | $1.31M | $1.17M |
| Wonof 4 | GEA-SR 306-07.96Pavement | GEA | Apr 2020 | $782k | $782k |
| Wonof 6 | GEA-SR 700-00.00Pavement | GEA | Apr 2020 | $738k | $738k |
| Wonof 5 | CUY-US 6/US 20-20.74/22.94Pavement | CUY | Apr 2020 | $3.44M | $3.44M |
| Rank 2of 6 | D04-SP FY2020 (East)Pavement | D04 | Mar 2020 | $757k | $672k |
| Wonof 4 | LAK-SR 535-00.62Pavement | LAK | Mar 2020 | $819k | $819k |
| Wonof 2 | LAK-SR 307 00.00Pavement | LAK | Mar 2020 | $165k | $165k |
| Wonof 2 | ATB-SR 7/SR 531-31.37/21.21Pavement | ATB | Feb 2020 | $1.14M | $1.14M |
| Rank 2of 6 | POR-SR 43D/SR 59-00.53/00.00Pavement | POR | Feb 2020 | $1.10M | $1.07M |
| Wonof 4 | GEA-SR 306-12.08Pavement | GEA | Feb 2020 | $800k | $800k |
| Rank 4of 4 | SUM-/WAY-SR 21/SR 585-00.00/VAR (PART 1 AND PART 2)Pavement | SUM | Feb 2020 | $6.84M | $6.52M |
| Rank 4of 6 | CUY-East 55th StreetPavement | CUY | Feb 2020 | $1.55M | $1.47M |
| Wonof 4 | GEA-SR 608-02.45/04.58Pavement | GEA | Feb 2020 | $284k | $284k |
| Rank 3of 4 | ATB-US 20-25.92Pavement | ATB | Dec 2018 | $1.04M | $885k |
| Wonof 3 | ATB-US 20/SR 84-06.35/14.23Pavement | ATB | Nov 2018 | $1.86M | $1.86M |
| Wonof 2 | D04-CHIP FY2019Pavement | D04 | Sep 2018 | $1.26M | $1.26M |
| Wonof 5 | MED-SMOOTH FY2019 (B)Pavement | MED | Aug 2018 | $3.36M | $3.36M |
| Rank 3of 4 | STA-SR 44/SR 153/SR 173-14.67/06.25/00.00Pavement | STA | Jul 2018 | $3.31M | $2.96M |
| Rank 3of 6 | TRU-SR 534-13.26Pavement | TRU | Jun 2018 | $1.23M | $1.12M |
| Rank 6of 7 | CUY-Prospect AvePavement | CUY | May 2018 | $1.89M | $1.53M |
| Rank 5of 6 | LOR-SR 10-06.53Pavement | LOR | May 2018 | $586k | $494k |
| Rank 5of 7 | MED-SR 57-00.00Pavement | MED | Apr 2018 | $1.57M | $1.45M |
| Rank 4of 6 | LAK-SR 283/SR 535-16.19/00.00Pavement | LAK | Apr 2018 | $1.01M | $931k |
| Rank 2of 7 | ATB-SR 11/SR 45-13.94/24.07Pavement | ATB | Apr 2018 | $3.88M | $3.82M |
| Wonof 6 | LAK-SR 528-00.00/04.21Pavement | LAK | Apr 2018 | $970k | $970k |
| Rank 2of 7 | CUY-SR 91-07.73Pavement | CUY | Mar 2018 | $921k | $884k |
| Wonof 6 | GEA-SR 166-00.00/VARPavement | GEA | Mar 2018 | $698k | $698k |
| Wonof 6 | GEA-SR 528-16.48Pavement | GEA | Mar 2018 | $2.03M | $2.03M |
| Wonof 6 | GEA-US 6-00.00Pavement | GEA | Feb 2018 | $661k | $661k |
| Rank 4of 7 | POR-SR 303-02.71Pavement | POR | Feb 2018 | $488k | $449k |
| Rank 7of 10 | SUM-Olde Eight Rd Phase 1Pavement | SUM | Feb 2018 | $696k | $616k |
| Wonof 8 | TRU-SR 5-00.00Pavement | TRU | Feb 2018 | $2.97M | $2.97M |
| Rank 2of 4 | ATB-SR 531-06.86Pavement | ATB | Jan 2018 | $1.50M | $1.35M |
| Wonof 6 | GEA-SR-SR 700-02.71Pavement | GEA | Jan 2018 | $562k | $562k |
| Rank 2of 5 | LAK-SR-SR 86-05.49Maintenance | LAK | Jan 2018 | $533k | $497k |
| Rank 2of 7 | GEA-SR-SR 306-00.00Pavement | GEA | Jan 2018 | $1.08M | $948k |
| Wonof 7 | ATB-SR 45-01.87Pavement | ATB | Jan 2018 | $2.09M | $2.09M |
| Wonof 7 | POR-SR 305/SR 700-0.00/VARPavement | POR | Jan 2018 | $1.38M | $1.38M |
Source: public.bid_results, ODOT bid tabs. Bidder strings are normalized to upper-case but not yet entity-resolved, so related firms (e.g. "Shelly Company" vs "Shelly & Sands") are shown separately.