HAR-SRTS Kenton
HAR County · est $0.1M
Bid dateThursday, February 15—
HAR County · est $0.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 2%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 18 more items below.
| Item | Quantity | R1Smith Paving & Excavating INC | R2Helms And Sons Excavating | R3Rietschlin Construction INC | % of bid |
|---|---|---|---|---|---|
| 608E10000 4" CONCRETE WALK | 1,730 SF | $7.50 | $8.09 | $8.00 | 19% |
| 631E93241 SCHOOL SPEED LIMIT SIGN ASSEMBLY, SOLAR-POWERED, A | 2 EACH | $5,575 | $7,924 | $6,500 | 16% |
| 643E30000 REMOVAL OF PAVEMENT MARKING | 358 FT | $17.25 | $17.25 | $7.00 | 9% |
| 608E52000 CURB RAMP | 514 SF | $10.60 | $15.54 | $10.00 | 8% |
| 832E30000 EROSION CONTROL | 3,922 EACH | $1.00 | $1.00 |
| Item | Quantity | R1Smith Paving & Excavating INC | R2Helms And Sons Excavating | R3Rietschlin Construction INC |
|---|---|---|---|---|
| 202E23010 PAVEMENT REMOVED, ASPHALT | 21 SY | $28.75 | $21.86 | $10.00 |
| 202E30000 WALK REMOVED | 53 SF | $4.00 | $2.24 | $7.00 |
| 202E32000 CURB REMOVED | 17 FT | $21.00 | $7.37 | $20.00 |
| 203E20000 EMBANKMENT | 1 CY | $75.00 | $44.65 | $100 |
| 204E10000 SUBGRADE COMPACTION | 43 SY | $3.15 | $2.49 | $5.00 |
| 608E13000 6" CONCRETE WALK |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1.00 |
| 6% |
| 643E00601 CROSSWALK LINE, AS PER PLAN | 403 FT | $9.35 | $9.35 | $6.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $3,500 | $4,117 | $18,000 | 5% |
| 643E00600 CROSSWALK LINE | 507 FT | $6.25 | $6.25 | $6.00 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,000 | $1,567 | $5,000 | 4% |
| 630E80100 SIGN, FLAT SHEET | 126 SF | $21.00 | $18.00 | $24.00 | 4% |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 232 FT | $10.00 | $12.00 | $12.00 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,650 | $1,100 | $1,500 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 5 CY | $325 | $746 | $400 | 2% |
| 203E10000 EXCAVATION | 27 CY | $60.00 | $50.09 | $100 | 2% |
| 643E01110 SCHOOL SYMBOL MARKING, 96" | 2 EACH | $780 | $780 | $800 | 2% |
| 202E32500 CURB AND GUTTER REMOVED | 69 FT | $22.00 | $7.60 | $25.00 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,200 | $560 | $2,000 | 2% |
| 659E00300 TOPSOIL | 15 CY | $65.00 | $138 | $25.00 | 1% |
| 609E18000 COMBINATION CURB AND GUTTER, TYPE 3 | 19 FT | $40.00 | $77.28 | $100 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $750 | $773 | $2,500 | 1% |
| 74 SF |
| $9.50 |
| $9.00 |
| $9.00 |
| 659E10000 SEEDING AND MULCHING | 134 SY | $2.50 | $7.26 | $10.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 7 SY | $10.00 | $7.23 | $5.00 |
| 304E20000 AGGREGATE BASE | 7 CY | $80.00 | $50.47 | $40.00 |
| 407E10000 TACK COAT | 2 GAL | $50.00 | $2.12 | $10.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 1 CY | $395 | $2,135 | $500 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 20 EACH | $15.00 | $15.00 | $20.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $65.00 | $75.00 | $70.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 14 EACH | $20.00 | $15.00 | $25.00 |
| 643E00400 CHANNELIZING LINE, 8" | 30 FT | $3.50 | $3.50 | $3.50 |
| 643E00500 STOP LINE | 27 FT | $12.50 | $12.50 | $12.00 |
| 643E01300 LANE ARROW | 2 EACH | $220 | $220 | $200 |
| 643E30020 REMOVAL OF PAVEMENT MARKING | 2 EACH | $290 | $290 | $200 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 608E10000 4" CONCRETE WALK | 1,730 SF | $7.5 | $13k | 17% |
| 631E93241 SCHOOL SPEED LIMIT SIGN ASSEMBLY, SOLAR-POWERED, A | 2 EACH | $5,575 | $11k | 15% |
| 643E30000 REMOVAL OF PAVEMENT MARKING | 358 FT | $17.25 | $6k | 8% |
| 608E52000 CURB RAMP | 514 SF | $10.6 | $5k | 7% |
| 832E30000 EROSION CONTROL | 3,922 EACH | $1 | $4k | 5% |
| 643E00601 CROSSWALK LINE, AS PER PLAN | 403 FT | $9.35 | $4k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $3,500 | $4k | 5% |
| 643E00600 CROSSWALK LINE | 507 FT | $6.25 | $3k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,000 | $3k | 4% |
| 630E80100 SIGN, FLAT SHEET | 126 SF | $21 | $3k | 4% |