| Item | Quantity | R1Righter Company INC | R2Shelly & Sands INC | R3Alan Stone CO INC | % of bid |
|---|---|---|---|---|---|
| 607E98000 FENCE, MISC.:PROTECTION FENCE | 805 FT | $750 | $793 | $788 | 29% |
| 530E00400 SPECIAL - STRUCTURES: PRE-ENGINEERED TRUSS BRIDGE | 1 EACH | $293,700 | $300,000 | $265,200 | 14% |
| 507E00400 STEEL PILES, MISC.: W14X159 FURNISHED | 890 FT | $150 | $105 | $112 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $75,000 | 5% |
| 524E94702 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK | 463 FT | $200 | $115 | $151 |
| Item | Quantity | R1Righter Company INC | R2Shelly & Sands INC | R3Alan Stone CO INC |
|---|---|---|---|---|
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 389 SY | $7.00 | $5.00 | $10.00 |
| 202E75000 FENCE REMOVED | 698 FT | $5.00 | $6.00 | $10.00 |
| 202E75250 GATE REMOVED | 1 EACH | $350 | $370 | $210 |
| 203E01890 SPECIAL - SOIL STERILANT | 4,788 SY | $0.80 | $3.00 | $2.00 |
| 204E10000 SUBGRADE COMPACTION | 4,788 SY | $2.00 | $6.00 | $2.50 |
| 204E45000 PROOF ROLLING | 2 HOUR |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 4% |
| 607E98000 FENCE, MISC.: TUBULAR SAFETY RAIL, AS PER PLAN | 805 FT | $95.00 | $101 | $100 | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $75,000 | $89,000 | $88,000 | 4% |
| 607E20100 FENCE, TYPE CL, MISC.: CHAIN LINK FENCE W/ PRIVAC | 871 FT | $82.00 | $87.00 | $87.00 | 3% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 1,760 FT | $40.00 | $20.00 | $24.00 | 3% |
| 511E46210 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 85 CY | $800 | $650 | $688 | 3% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 645 CY | $100 | $118 | $71.00 | 3% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 79 CY | $800 | $648 | $707 | 3% |
| 203E10000 EXCAVATION | 2,310 CY | $25.00 | $24.00 | $42.00 | 3% |
| 203E20000 EMBANKMENT | 1,867 CY | $30.00 | $14.00 | $27.00 | 3% |
| 304E20000 AGGREGATE BASE | 785 CY | $70.00 | $89.00 | $80.00 | 3% |
| 832E30000 EROSION CONTROL | 50,000 EACH | $1.00 | $1.00 | $1.00 | 2% |
| 690E20240 SPECIAL - ROADWAY: TEMPORARY ROAD | 1 LS | $50,000 | $71,000 | $93,465 | 2% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 58 CY | $800 | $1,426 | $1,065 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (229 CY | $172 | $172 | $197 | 2% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 38,233 LB | $1.00 | $0.87 | $1.20 | 2% |
| $250 |
| $200 |
| $213 |
| 606E15050 GUARDRAIL, TYPE MGS | 567 FT | $17.50 | $19.00 | $19.00 |
| 607E98000 FENCE, MISC.: BIKEWAY RAILING | 191 FT | $38.50 | $41.00 | $41.00 |
| 607E98100 FENCE, MISC.: GATE, CHAIN LINK W/ PRIVACY SLATS | 3 EACH | $3,750 | $3,961 | $3,936 |
| 607E98100 FENCE, MISC.:TRIANGULAR BARRIER GATE | 3 EACH | $10,750 | $11,354 | $11,283 |
| 608E10000 4" CONCRETE WALK | 135 SF | $15.00 | $49.00 | $20.00 |
| 608E53020 DETECTABLE WARNING | 54 SF | $25.00 | $51.00 | $53.00 |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN | 300 FT | $60.00 | $12.00 | $58.00 |
| 659E00300 TOPSOIL | 898 CY | $25.00 | $21.00 | $38.00 |
| 659E00541 SEEDING AND MULCHING, CLASS 3C, AS PER PLAN | 6,076 SY | $0.80 | $1.00 | $1.75 |
| 659E14001 REPAIR SEEDING AND MULCHING, AS PER PLAN | 304 SY | $0.80 | $1.00 | $0.45 |
| 659E15001 INTER-SEEDING, AS PER PLAN | 304 SY | $0.80 | $1.00 | $0.10 |
| 659E20000 COMMERCIAL FERTILIZER | 0.83 TON | $625 | $660 | $700 |
| 659E31000 LIME | 1.26 ACRE | $70.00 | $74.00 | $115 |
| 659E35000 WATER | 33 MGAL | $1.00 | $1.00 | $1.50 |
| 670E00500 SLOPE EROSION PROTECTION | 2,000 SY | $1.82 | $2.00 | $2.30 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $5,000 | $1,904 | $12,210 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $30,000 | $27,800 | $12,200 |
| 602E20000 CONCRETE MASONRY | 0.8 CY | $2,000 | $4,186 | $4,500 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 151 FT | $20.00 | $19.00 | $17.00 |
| 611E00406 4" CONDUIT, TYPE F | 100 FT | $5.00 | $32.00 | $26.00 |
| 611E01200 6" CONDUIT, TYPE D | 17 FT | $40.00 | $37.00 | $81.00 |
| 611E01500 6" CONDUIT, TYPE F | 60 FT | $7.00 | $27.00 | $37.00 |
| 611E02600 8" CONDUIT, TYPE F | 60 FT | $10.00 | $41.00 | $37.00 |
| 611E04900 12" CONDUIT, TYPE D | 78 FT | $30.00 | $42.00 | $98.00 |
| 611E05200 12" CONDUIT, TYPE F | 37 FT | $40.00 | $60.00 | $89.00 |
| 611E10900 24" CONDUIT, TYPE D | 33 FT | $80.00 | $70.00 | $92.00 |
| 611E98390 CATCH BASIN, NO. 7 | 1 EACH | $1,500 | $2,200 | $1,306 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $2,000 | $2,200 | $1,490 |
| 611E98511 CATCH BASIN, NO. 2-3, AS PER PLAN | 1 EACH | $3,000 | $2,400 | $1,838 |
| 611E99651 MANHOLE FRAME AND COVER, AS PER PLAN | 1 EACH | $500 | $2,004 | $10,455 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $400 | $430 | $319 |
| 407E10000 TACK COAT | 259 GAL | $2.20 | $2.20 | $6.50 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 163 CY | $198 | $198 | $182 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 81 SY | $100 | $98.00 | $195 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $750 | $850 | $1,123 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 1 EACH | $1,000 | $1,600 | $1,070 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 146 FT | $12.00 | $13.00 | $13.00 |
| 630E80100 SIGN, FLAT SHEET | 59 SF | $20.00 | $22.00 | $21.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 3 EACH | $15.00 | $16.00 | $100 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $15.00 | $16.00 | $50.00 |
| 644E00300 CENTER LINE | 0.83 MILE | $5,280 | $6,706 | $5,542 |
| 644E00500 STOP LINE | 15 FT | $7.50 | $10.00 | $8.00 |
| 644E01382 WORD ON PAVEMENT, 48" | 8 EACH | $310 | $396 | $326 |
| 690E50600 SPECIAL - BOLLARD, AS PER PLAN | 1 EACH | $125 | $133 | $132 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 20 HOUR | $65.00 | $77.00 | $79.00 |
| 690E65010 SPECIAL - WORK INVOLVING SOLID WASTE | 98 TON | $105 | $146 | $129 |
| 304E20000 AGGREGATE BASE | 3 CY | $200 | $185 | $195 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $5,000 | $29,000 | $42,642 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $10,000 | $39,000 | $9,000 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $20,000 | $26,800 | $33,811 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 1,600 FT | $10.00 | $17.00 | $24.00 |
| 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK | 35 CY | $950 | $920 | $974 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 469 SY | $20.00 | $22.00 | $21.00 |
| 513E90000 STRUCTURAL STEEL, MISC.: L6X4X1/2 SUPPORT ANGLE | 49 LB | $25.00 | $34.00 | $72.00 |
| 516E46900 BEARING DEVICE, MISC.: ANCHOR ROD (GALVANIZED) | 8 EACH | $150 | $200 | $994 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 265 CY | $100 | $85.00 | $140 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 443 FT | $10.00 | $6.00 | $6.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 77 FT | $15.00 | $18.00 | $36.00 |
| 526E10000 REINFORCED CONCRETE APPROACH SLABS (T=12") | 47 SY | $200 | $370 | $286 |
| 526E90010 TYPE A INSTALLATION | 28 FT | $150 | $515 | $255 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 50 CY | $150 | $125 | $63.00 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 12 CF | $881 | $940 | $925 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $30,000 | $14,867 | $17,500 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,000 | $11,800 | $22,188 |
| 619E16000 FIELD OFFICE, TYPE A | 16 MNTH | $850 | $2,700 | $1,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $25,000 | $34,000 | $37,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 607E98000 FENCE, MISC.:PROTECTION FENCE | 805 FT | $750 | $604k | 23% |
| 530E00400 SPECIAL - STRUCTURES: PRE-ENGINEERED TRUSS BRIDGE | 1 EACH | $293,700 | $294k | 11% |
| 507E00400 STEEL PILES, MISC.: W14X159 FURNISHED | 890 FT | $150 | $134k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 4% |
| 524E94702 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK | 463 FT | $200 | $93k | 4% |
| 607E98000 FENCE, MISC.: TUBULAR SAFETY RAIL, AS PER PLAN | 805 FT | $95 | $76k | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $75,000 | $75k | 3% |
| 607E20100 FENCE, TYPE CL, MISC.: CHAIN LINK FENCE W/ PRIVAC | 871 FT | $82 | $71k | 3% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 1,760 FT | $40 | $70k | 3% |
| 511E46210 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 85 CY | $800 | $68k | 3% |