WOO-US 20-08.87 Turn Lane Sfty
WOO County · est $0.3M
Bid dateThursday, July 26—
WOO County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 24 more items below.
| Item | Quantity | R1Shelly Company | R2Miller Bros Const INC | R3Geddis Paving & Excavating INC | R4Crestline Paving & Excavating CO INC | % of bid |
|---|---|---|---|---|---|---|
| 442E00200 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 498 CY | $183 | $183 | $255 | $250 | 28% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $50,000 | $25,000 | $40,000 | $25,000 | 15% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 224 CY | $160 | $160 | $190 | $215 | 11% |
| 624E10000 MOBILIZATION | 1 LS | $24,000 | $10,000 | $34,500 |
| Item | Quantity | R1Shelly Company | R2Miller Bros Const INC | R3Geddis Paving & Excavating INC | R4Crestline Paving & Excavating CO INC |
|---|---|---|---|---|---|
| 209E60500 LINEAR GRADING | 1 MILE | $1,500 | $6,500 | $5,000 | $10,000 |
| 659E20000 COMMERCIAL FERTILIZER | 1.22 TON | $600 | $400 | $700 | $600 |
| 659E31000 LIME | 1.87 ACRE | $30.00 | $5.00 | $250 | $30.00 |
| 659E35000 WATER | 24.44 MGAL | $1.00 | $5.00 | $1.00 | $10.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $14,240 |
| 7% |
| 304E20000 AGGREGATE BASE | 269 CY | $68.00 | $65.00 | $68.00 | $80.00 | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/2" | 7,931 SY | $2.10 | $2.10 | $2.30 | $2.00 | 5% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 90 CY | $183 | $183 | $220 | $275 | 5% |
| 203E10000 EXCAVATION | 547 CY | $25.00 | $67.00 | $32.00 | $55.00 | 4% |
| 202E23000 PAVEMENT REMOVED | 818 SY | $12.00 | $7.00 | $10.50 | $7.00 | 3% |
| 659E10000 SEEDING AND MULCHING | 9,050.8 SY | $0.85 | $0.78 | $0.85 | $0.85 | 2% |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $7,325 | $3,000 | $4,000 | $8,325 | 2% |
| 203E20000 EMBANKMENT | 610 CY | $12.00 | $11.00 | $32.00 | $50.00 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,020 | $5,000 | $5,000 | $8,000 | 2% |
| 618E41000 EDGE LINE, RUMBLE STRIPE (ASPHALT CONCRETE) | 1 MILE | $5,904 | $5,904 | $5,850 | $10,000 | 2% |
| 659E00300 TOPSOIL | 1,004.64 CY | $5.00 | $55.00 | $22.00 | $35.00 | 2% |
| 617E10100 COMPACTED AGGREGATE | 44 CY | $80.00 | $63.00 | $110 | $135 | 1% |
| 204E10000 SUBGRADE COMPACTION | 1,610 SY | $2.00 | $1.00 | $0.75 | $3.95 | 1% |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,500 | $2,500 | $4,000 | $3,439 | 1% |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 305 FT | $7.00 | $7.00 | $8.00 | $7.00 | 1% |
| 1 LS |
| $850 |
| $1,075 |
| $3,000 |
| $850 |
| 407E20000 NON-TRACKING TACK COAT | 900 GAL | $2.00 | $2.00 | $1.00 | $1.00 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 673 LB | $0.65 | $0.65 | $1.50 | $1.50 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 1,839 FT | $0.55 | $2.00 | $2.25 | $2.25 |
| 642E00094 EDGE LINE, 6" | 0.82 MILE | $1,250 | $1,250 | $1,000 | $1,250 |
| 642E00290 CENTER LINE | 0.63 MILE | $2,000 | $2,000 | $1,500 | $2,000 |
| 644E00400 CHANNELIZING LINE, 8" | 115 FT | $1.50 | $1.50 | $3.00 | $1.50 |
| 644E00500 STOP LINE | 20 FT | $8.00 | $8.00 | $8.00 | $8.00 |
| 644E00900 ISLAND MARKING | 23 SF | $6.00 | $6.00 | $5.00 | $6.00 |
| 644E01300 LANE ARROW | 6 EACH | $95.00 | $95.00 | $125 | $95.00 |
| 644E01500 DOTTED LINE, 4", WHITE | 121 FT | $4.00 | $4.00 | $3.00 | $4.00 |
| 614E12460 WORK ZONE MARKING SIGN | 6 EACH | $150 | $150 | $125 | $150 |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $150 | $150 | $125 | $150 |
| 614E12600 REPLACEMENT DRUM | 5 EACH | $60.00 | $60.00 | $40.00 | $60.00 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 1 MILE | $1,500 | $1,500 | $2,000 | $1,500 |
| 614E21400 WORK ZONE CENTER LINE, CLASS II | 2 MILE | $1,000 | $1,000 | $1,000 | $1,000 |
| 614E23010 WORK ZONE CHANNELIZING LINE, CLASS I, 12" | 115 FT | $2.50 | $2.50 | $2.00 | $2.50 |
| 614E23656 WORK ZONE CHANNELIZING LINE, CLASS II, 12" | 230 FT | $2.00 | $2.00 | $2.00 | $2.00 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 20 FT | $3.00 | $3.00 | $4.00 | $3.00 |
| 614E30000 WORK ZONE ARROW, CLASS I | 2 EACH | $50.00 | $50.00 | $100 | $50.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E00200 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 498 CY | $183 | $91k | 26% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $50,000 | $50k | 14% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 224 CY | $160 | $36k | 10% |
| 624E10000 MOBILIZATION | 1 LS | $24,000 | $24k | 7% |
| 304E20000 AGGREGATE BASE | 269 CY | $68 | $18k | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/2" | 7,931 SY | $2.1 | $17k | 5% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 90 CY | $183 | $16k | 5% |
| 203E10000 EXCAVATION | 547 CY | $25 | $14k | 4% |
| 202E23000 PAVEMENT REMOVED | 818 SY | $12 | $10k | 3% |
| 659E10000 SEEDING AND MULCHING | 9,050.8 SY | $0.85 | $8k | 2% |