BEL-SR 9-00.21
BEL County · est $0.6M
Bid dateThursday, September 27—
BEL County · est $0.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 48 more items below.
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Shelly & Sands INC | R3Suburban Maintenance & Construction | R4INC Complete General Construction Company | R5Alan Stone CO INC | R6Great Lakes Construction CO | R7Lockhart Concrete CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 507E00200 STEEL PILES HP12X53, FURNISHED | 3,210 FT | $34.90 | $30.00 | $30.00 | $33.00 | $35.00 | $34.00 | $28.00 | 22% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 1,050 FT | $72.00 | $93.00 | $115 | $95.00 | $123 | $170 | $50.00 | 15% |
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Shelly & Sands INC | R3Suburban Maintenance & Construction | R4INC Complete General Construction Company | R5Alan Stone CO INC | R6Great Lakes Construction CO | R7Lockhart Concrete CO |
|---|---|---|---|---|---|---|---|---|
| 202E23010 PAVEMENT REMOVED, ASPHALT | 340 SY | $24.00 | $23.00 | $15.00 | $15.00 | $12.00 | $25.00 | $20.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 39 FT | $18.00 | $17.00 | $80.00 | $20.00 | $24.00 | $15.00 | $20.00 |
| 202E38000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 885 CY | $65.00 | $23.50 | $63.00 | $80.00 | $85.00 | $110 | $20.00 | 11% |
| 511E81300 CONCRETE, MISC.:8"X36"X57" PRECAST CONCRETE LAGGIN | 177 EACH | $232 | $290 | $280 | $310 | $251 | $310 | $2,600 | 8% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 1,123 FT | $33.00 | $57.00 | $32.00 | $80.00 | $75.00 | $135 | $50.00 | 7% |
| 511E81300 CONCRETE, MISC.:8"X24"X57" PRECAST CONCRETE LAGGIN | 122 EACH | $181 | $240 | $260 | $275 | $212 | $280 | $2,600 | 4% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 84 CY | $242 | $425 | $315 | $850 | $450 | $375 | $1,000 | 4% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 171 CY | $95.50 | $110 | $65.00 | $95.00 | $90.00 | $100 | $50.00 | 3% |
| 611E08700 21" CONDUIT, TYPE A, 706.02 | 43 FT | $336 | $170 | $200 | $250 | $223 | $175 | $150 | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (59 CY | $215 | $214 | $256 | $224 | $250 | $256 | $300 | 2% |
| 507E00400 STEEL PILES, MISC.:W14X61, FURNISHED | 175 FT | $71.50 | $37.00 | $35.00 | $38.00 | $48.00 | $41.00 | $33.00 | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 42 CY | $295 | $291 | $288 | $294 | $310 | $288 | $320 | 2% |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 487.5 FT | $24.50 | $24.50 | $30.00 | $24.48 | $26.00 | $24.48 | $26.00 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 41 CY | $290 | $288 | $251 | $392 | $310 | $251 | $280 | 2% |
| 304E20000 AGGREGATE BASE | 115 CY | $99.00 | $85.00 | $65.00 | $80.00 | $92.00 | $125 | $50.00 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $11,000 | $20,000 | $40,000 | $20,000 | $95,000 | $20,000 | $49,000 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $35,940 | $50,000 | $10,000 | $30,000 | $35,000 | $79,000 | 2% |
| 202E11200 PORTIONS OF STRUCTURE REMOVED | 1 LS | $9,000 | $11,650 | $50,000 | $40,000 | $20,000 | $8,000 | $2,000 | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 10 CY | $885 | $550 | $762 | $775 | $400 | $762 | $320 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (T=3") | 855 SY | $10.00 | $10.50 | $12.50 | $6.85 | $14.00 | $6.00 | $16.00 | 2% |
| 538 FT |
| $6.00 |
| $1.50 |
| $2.50 |
| $1.50 |
| $3.00 |
| $5.00 |
| $5.00 |
| 203E20000 EMBANKMENT | 306 CY | $12.00 | $12.50 | $15.00 | $25.00 | $17.00 | $25.00 | $30.00 |
| 204E10000 SUBGRADE COMPACTION | 425 SY | $5.00 | $4.00 | $15.00 | $9.00 | $2.50 | $2.50 | $2.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E(NCHRP 350 OR MASH 2016 | 1 EACH | $2,200 | $2,135 | $2,300 | $2,135 | $2,241 | $2,135 | $2,200 |
| 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH GEOTEXTILE FA | 4 CY | $323 | $155 | $120 | $500 | $405 | $375 | $120 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $335 | $88.00 | $100 | $100 | $100 | $100 | $250 |
| 659E00300 TOPSOIL | 107 CY | $40.00 | $20.00 | $60.00 | $20.00 | $67.00 | $80.00 | $50.00 |
| 659E10000 SEEDING AND MULCHING | 961 SY | $3.50 | $3.00 | $3.31 | $3.31 | $3.50 | $2.80 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 48 SY | $8.00 | $0.70 | $3.00 | $3.00 | $3.00 | $0.50 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.13 TON | $1,000 | $665 | $650 | $650 | $3,199 | $600 | $600 |
| 659E31000 LIME | 0.2 ACRE | $800 | $150 | $100 | $100 | $840 | $111 | $400 |
| 659E35000 WATER | 5 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $3.00 | $1.00 | $100 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.4 CY | $4,600 | $1,500 | $5,000 | $3,000 | $1,846 | $1,500 | $1,000 |
| 407E10000 TACK COAT | 139 GAL | $2.00 | $2.00 | $2.50 | $3.00 | $3.50 | $2.50 | $2.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 91 GAL | $13.00 | $13.00 | $14.00 | $14.31 | $11.00 | $14.00 | $5.00 |
| 621E00100 RPM | 8 EACH | $690 | $100 | $625 | $625 | $525 | $295 | $65.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 8 EACH | $99.00 | $9.00 | $500 | $30.00 | $13.00 | $23.19 | $25.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 7 EACH | $9.00 | $7.00 | $50.00 | $7.00 | $7.50 | $7.00 | $12.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 54 FT | $11.00 | $17.50 | $50.00 | $17.50 | $19.00 | $17.50 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $55.00 | $45.00 | $50.00 | $45.00 | $213 | $45.00 | $50.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $11.00 | $10.00 | $100 | $10.00 | $66.00 | $10.00 | $25.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.2 MILE | $3,500 | $3,200 | $3,200 | $3,200 | $3,359 | $4,300 | $4,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.1 MILE | $6,700 | $6,000 | $6,000 | $6,000 | $6,298 | $5,730 | $10,000 |
| 407E10000 TACK COAT | 15 GAL | $2.00 | $2.00 | $2.50 | $3.00 | $3.50 | $2.50 | $5.00 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 10 CY | $600 | $75.00 | $400 | $100 | $114 | $150 | $50.00 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 10 CY | $500 | $80.00 | $300 | $100 | $120 | $150 | $50.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $7,500 | $8,496 | $6,750 | $6,750 | $7,085 | $6,440 | $9,000 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $500 | $160 | $300 | $140 | $523 | $409 | $240 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.1 MILE | $6,000 | $5,500 | $5,500 | $5,500 | $5,773 | $5,200 | $21,000 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.2 MILE | $3,200 | $2,875 | $2,875 | $2,875 | $3,018 | $3,900 | $12,000 |
| 616E10000 WATER | 20 MGAL | $5.00 | $18.00 | $1.00 | $60.00 | $21.00 | $55.00 | $100 |
| 617E10100 COMPACTED AGGREGATE | 15 CY | $181 | $140 | $150 | $150 | $129 | $150 | $80.00 |
| 617E25000 WATER | 1 MGAL | $5.00 | $35.00 | $1.00 | $60.00 | $1.50 | $55.00 | $100 |
| 203E35000 GRANULAR EMBANKMENT | 99 CY | $85.00 | $75.00 | $65.00 | $75.00 | $78.00 | $110 | $42.00 |
| 507E00410 STEEL PILES, MISC.: HP12X53 STEEL BEAM SPLICE | 15 EACH | $538 | $175 | $250 | $500 | $250 | $325 | $200 |
| 507E00410 STEEL PILES, MISC.: W14X61 STEEL BEAM SPLICE | 3 EACH | $595 | $210 | $250 | $750 | $250 | $325 | $250 |
| 511E71100 CONCRETE, MISC.:8"X144"X58.5" CAST-IN-PLACE CONCRE | 2 CY | $1,800 | $1,750 | $1,000 | $7,500 | $2,553 | $4,500 | $3,500 |
| 511E81300 CONCRETE, MISC.:8"X24"X57" PRECAST CONCRETE LAGGIN | 2 EACH | $845 | $450 | $500 | $275 | $455 | $290 | $2,600 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 520 FT | $9.00 | $3.00 | $8.00 | $10.00 | $12.00 | $10.00 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 6 FT | $35.00 | $50.00 | $8.00 | $25.00 | $91.00 | $50.00 | $10.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $230 | $275 | $500 | $250 | $300 | $350 | $300 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,000 | $4,982 | $15,000 | $8,000 | $6,300 | $8,000 | $42,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,000 | $6,034 | $30,000 | $6,000 | $20,000 | $20,000 | $22,000 |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $650 | $3,500 | $1,100 | $2,000 | $1,550 | $2,000 | $1,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,000 | $6,950 | $10,000 | $4,000 | $10,000 | $8,000 | $39,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00200 STEEL PILES HP12X53, FURNISHED | 3,210 FT | $34.9 | $112k | 18% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 1,050 FT | $72 | $76k | 12% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 885 CY | $65 | $58k | 9% |
| 511E81300 CONCRETE, MISC.:8"X36"X57" PRECAST CONCRETE LAGGIN | 177 EACH | $231.65 | $41k | 6% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 1,123 FT | $33 | $37k | 6% |
| 511E81300 CONCRETE, MISC.:8"X24"X57" PRECAST CONCRETE LAGGIN | 122 EACH | $181 | $22k | 3% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 84 CY | $242 | $20k | 3% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 171 CY | $95.5 | $16k | 3% |
| 611E08700 21" CONDUIT, TYPE A, 706.02 | 43 FT | $335.75 | $14k | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (59 CY | $215 | $13k | 2% |