ROS-SR 159-05.06
ROS County · est $1.2M
Bid dateThursday, December 13—
ROS County · est $1.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 114 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Axis Civil Construction LLC | R3Complete General Construction Company | R4Eclipse CO LLC | R5Allard Excavation LLC | R6D G M INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 594 CY | $180 | $180 | $180 | $186 | $165 | $173 | 13% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 1,800 CY | $48.50 | $60.00 | $46.00 | $44.50 | $50.25 | $38.00 | 11% |
| 611E96310 14' X 5' CONDUIT, TYPE A, 706.05 | 58 FT | $1,350 | $1,280 | $1,244 |
| Item | Quantity | R1Shelly & Sands INC | R2Axis Civil Construction LLC | R3Complete General Construction Company | R4Eclipse CO LLC | R5Allard Excavation LLC | R6D G M INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $14,000 | $5,000 | $7,050 | $6,763 | $9,550 | $23,000 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 1,218 SY | $4.75 | $20.00 | $10.00 | $20.50 | $13.00 | $10.00 |
| 202E30000 WALK REMOVED | 115 SF | $4.00 | $2.00 | $4.00 | $2.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1,736 |
| $1,473 |
| $2,000 |
| 10% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (365 CY | $185 | $185 | $185 | $191 | $205 | $215 | 8% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 261 CY | $200 | $200 | $200 | $206 | $230 | $240 | 6% |
| 304E20000 AGGREGATE BASE | 730 CY | $60.00 | $80.00 | $69.00 | $71.00 | $68.25 | $60.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $20,000 | $40,000 | $45,000 | $150,000 | $40,000 | 5% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 925 SY | $43.00 | $60.00 | $61.00 | $51.00 | $45.82 | $80.00 | 5% |
| 832E30000 EROSION CONTROL | 39,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 5% |
| 204E13000 EXCAVATION OF SUBGRADE | 1,800 CY | $19.50 | $20.00 | $26.00 | $25.50 | $14.00 | $8.00 | 4% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 75 CY | $450 | $410 | $420 | $403 | $420 | $650 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 4,076 SY | $7.50 | $7.50 | $7.50 | $7.50 | $3.60 | $4.00 | 4% |
| 203E20000 EMBANKMENT | 1,411 CY | $17.00 | $12.00 | $10.00 | $12.00 | $25.00 | $20.00 | 3% |
| 203E10000 EXCAVATION | 1,148 CY | $20.00 | $20.00 | $28.00 | $18.50 | $26.00 | $20.00 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $21,380 | $12,000 | $8,000 | $27,152 | $7,000 | $18,000 | 3% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 14 CY | $1,525 | $1,450 | $1,500 | $1,939 | $1,440 | $800 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $19,500 | $30,000 | $29,000 | $49,000 | $83,350 | $100,000 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 7 MNTH | $2,665 | $1,600 | $2,200 | $1,000 | $1,200 | $1,200 | 2% |
| 632E64000 STRAIN POLE FOUNDATION | 4 EACH | $4,137 | $4,137 | $4,500 | $5,042 | $4,137 | $4,250 | 2% |
| 632E85200 COMBINATION STRAIN POLE, TYPE TC-81.10, DESIGN 12 | 2 EACH | $8,090 | $8,090 | $7,500 | $8,096 | $8,090 | $9,250 | 2% |
| $4.00 |
| $6.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 42 FT | $22.50 | $15.00 | $25.00 | $15.00 | $26.00 | $12.00 |
| 202E38000 GUARDRAIL REMOVED | 250 FT | $2.00 | $4.00 | $1.80 | $2.00 | $2.50 | $1.00 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 1 EACH | $350 | $100 | $265 | $361 | $150 | $250 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 2 EACH | $150 | $100 | $170 | $155 | $150 | $250 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 2 EACH | $100 | $400 | $95.00 | $103 | $150 | $150 |
| 202E98100 REMOVAL MISC.: CONCRETE PAD REMOVED | 1 EACH | $400 | $750 | $250 | $126 | $680 | $300 |
| 204E10000 SUBGRADE COMPACTION | 3,960 SY | $3.00 | $2.00 | $2.75 | $2.50 | $3.00 | $5.00 |
| 204E45000 PROOF ROLLING | 3 HOUR | $200 | $200 | $186 | $214 | $85.00 | $75.00 |
| 204E50000 GEOTEXTILE FABRIC | 4,700 SY | $0.41 | $1.00 | $3.00 | $1.00 | $1.25 | $0.60 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 250 FT | $27.50 | $27.50 | $20.80 | $28.50 | $45.90 | $30.00 |
| 606E15200 GUARDRAIL, TYPE MGS HALF POST SPACING WITH LONG PO | 62.5 FT | $27.50 | $27.50 | $29.60 | $28.50 | $47.32 | $30.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE ENCHRP 350 OR MASH 2016 | 4 EACH | $2,200 | $2,200 | $2,385 | $2,266 | $2,100 | $2,300 |
| 623E40500 REFERENCE MONUMENT | 6 EACH | $950 | $1,500 | $485 | $368 | $605 | $300 |
| 690E50000 SPECIAL - MAILBOX SUPPORT | 5 EACH | $190 | $200 | $130 | $155 | $250 | $150 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 28 CY | $95.00 | $120 | $115 | $124 | $83.00 | $40.00 |
| 659E00300 TOPSOIL | 385 CY | $12.00 | $25.00 | $30.00 | $44.50 | $19.00 | $10.00 |
| 659E10000 SEEDING AND MULCHING | 3,467 SY | $0.90 | $1.15 | $0.89 | $1.50 | $1.25 | $3.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 173 SY | $0.70 | $1.00 | $0.68 | $1.00 | $0.05 | $0.05 |
| 659E20000 COMMERCIAL FERTILIZER | 0.47 TON | $666 | $605 | $666 | $515 | $500 | $300 |
| 659E31000 LIME | 0.72 ACRE | $153 | $70.00 | $153 | $206 | $200 | $80.00 |
| 659E35000 WATER | 19 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 670E00520 SLOPE EROSION PROTECTION MAT, TYPE B | 1,472 SY | $1.40 | $2.00 | $1.39 | $2.00 | $1.95 | $3.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,155 | $1,500 | $8,322 | $1,545 | $5,140 | $5,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $12,000 | $18,000 | $3,325 | $4,151 | $7,000 | $6,500 |
| 602E20000 CONCRETE MASONRY | 2.8 CY | $1,750 | $800 | $1,340 | $1,247 | $1,400 | $2,000 |
| 605E31100 AGGREGATE DRAINS | 542 FT | $12.50 | $11.00 | $8.00 | $16.00 | $8.90 | $12.00 |
| 611E01400 6" CONDUIT, TYPE E | 100 FT | $8.50 | $10.00 | $23.00 | $19.50 | $21.00 | $4.00 |
| 611E01500 6" CONDUIT, TYPE F | 100 FT | $8.50 | $10.00 | $23.00 | $19.50 | $21.00 | $4.00 |
| 611E03300 10" CONDUIT, TYPE C | 100 FT | $18.50 | $10.00 | $64.00 | $38.00 | $32.00 | $8.00 |
| 611E04600 12" CONDUIT, TYPE C | 100 FT | $27.50 | $22.00 | $65.00 | $39.50 | $36.75 | $20.00 |
| 611E06400 15" CONDUIT, TYPE D | 101 FT | $45.00 | $42.00 | $66.00 | $51.00 | $37.00 | $60.00 |
| 611E10600 24" CONDUIT, TYPE C | 80 FT | $58.00 | $55.00 | $102 | $72.50 | $39.00 | $80.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 5 EACH | $300 | $250 | $210 | $205 | $300 | $75.00 |
| 407E10000 TACK COAT | 760 GAL | $2.25 | $2.25 | $2.25 | $2.50 | $1.95 | $1.95 |
| 408E10000 PRIME COAT | 8 GAL | $10.00 | $10.00 | $10.00 | $10.50 | $15.00 | $15.00 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $1,500 | $1,500 | $1,500 | $1,545 | $350 | $375 |
| 621E00100 RPM | 47 EACH | $74.00 | $69.00 | $74.00 | $71.00 | $74.00 | $110 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 21 EACH | $14.00 | $51.95 | $15.00 | $16.00 | $10.00 | $1.00 |
| 626E00112 BARRIER REFLECTOR, TYPE 3 BIDIRECTIONAL | 7 EACH | $30.00 | $7.50 | $5.00 | $7.50 | $7.00 | $8.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 106 FT | $11.50 | $11.50 | $10.00 | $12.00 | $10.00 | $12.00 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $40.00 | $40.00 | $20.00 | $41.00 | $2.00 | $40.00 |
| 630E80100 SIGN, FLAT SHEET | 62.9 SF | $16.50 | $16.50 | $25.00 | $17.00 | $25.00 | $20.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 11 EACH | $15.00 | $65.00 | $10.00 | $15.50 | $10.00 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $55.00 | $90.00 | $40.00 | $56.50 | $40.00 | $100 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 9 EACH | $15.00 | $90.00 | $10.00 | $15.50 | $10.00 | $15.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 2 EACH | $100 | $350 | $40.00 | $103 | $40.00 | $50.00 |
| 644E00100 EDGE LINE, 4" | 0.63 MILE | $2,555 | $4,562 | $3,450 | $3,196 | $2,555 | $3,500 |
| 644E00300 CENTER LINE | 0.43 MILE | $4,800 | $6,993 | $6,900 | $6,004 | $4,800 | $7,000 |
| 644E00400 CHANNELIZING LINE, 8" | 605 FT | $1.75 | $1.65 | $2.50 | $2.00 | $1.75 | $2.50 |
| 644E00500 STOP LINE | 126 FT | $5.00 | $6.35 | $9.39 | $6.00 | $1.95 | $10.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 615 FT | $5.00 | $6.55 | $6.00 | $6.50 | $5.00 | $6.50 |
| 644E01300 LANE ARROW | 10 EACH | $90.00 | $109 | $115 | $113 | $90.00 | $120 |
| 625E23306 NO. 10 AWG 600 VOLT DISTRIBUTION CABLE | 912 FT | $0.70 | $0.68 | $1.50 | $1.50 | $0.68 | $1.65 |
| 625E25400 CONDUIT, 2", 725.04 | 26 FT | $20.75 | $20.73 | $14.00 | $31.00 | $20.73 | $26.00 |
| 625E25600 CONDUIT, 4", 725.04 | 8 FT | $70.89 | $70.89 | $39.00 | $56.50 | $70.89 | $40.00 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 2 EACH | $838 | $838 | $575 | $814 | $838 | $800 |
| 625E29000 TRENCH | 34 FT | $22.82 | $22.82 | $7.00 | $20.50 | $22.82 | $15.00 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $947 | $947 | $1,100 | $2,266 | $947 | $1,000 |
| 625E31510 PULL BOX REMOVED | 2 EACH | $200 | $200 | $220 | $387 | $200 | $250 |
| 625E32000 GROUND ROD | 5 EACH | $254 | $253 | $250 | $247 | $253 | $260 |
| 625E75402 LIGHT POLE REMOVED FOR STORAGE | 2 EACH | $291 | $291 | $200 | $963 | $291 | $400 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 2 EACH | $447 | $447 | $340 | $515 | $447 | $375 |
| 625E75504 LUMINAIRE REMOVED FOR STORAGE | 2 EACH | $146 | $146 | $35.00 | $20.50 | $146 | $140 |
| 625E75510 POWER SERVICE REMOVED | 2 EACH | $194 | $194 | $900 | $963 | $194 | $725 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 6 EACH | $1,133 | $1,133 | $700 | $773 | $1,133 | $800 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 2 EACH | $1,642 | $1,642 | $1,200 | $1,370 | $1,642 | $1,350 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 8 EACH | $103 | $103 | $44.00 | $92.50 | $103 | $50.00 |
| 632E30300 MESSENGER WIRE, 7 STRAND, 7/16" DIAMETER WITH ACCE | 416 FT | $9.25 | $9.19 | $12.00 | $13.50 | $9.19 | $14.00 |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 416 FT | $14.25 | $14.11 | $14.00 | $18.50 | $14.11 | $16.00 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 717 FT | $3.10 | $3.07 | $2.50 | $4.00 | $3.07 | $3.50 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 53 FT | $5.50 | $5.38 | $5.00 | $5.00 | $5.38 | $5.25 |
| 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG | 50 FT | $5.05 | $5.05 | $5.00 | $5.00 | $5.05 | $5.25 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $1,552 | $1,552 | $2,300 | $2,266 | $1,552 | $3,000 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 1 EACH | $793 | $793 | $900 | $670 | $793 | $850 |
| 632E83200 STRAIN POLE, TYPE TC-81.10, DESIGN 12 | 2 EACH | $7,429 | $7,429 | $7,000 | $7,457 | $7,429 | $8,500 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $2,910 | $2,910 | $3,200 | $3,852 | $2,910 | $3,250 |
| 632E90104 REUSE OF TRAFFIC CONTROL ITEM: RADAR DETECTION SYS | 1 EACH | $2,779 | $2,779 | $4,100 | $7,344 | $2,779 | $6,500 |
| 633E67100 CABINET FOUNDATION | 1 EACH | $1,684 | $1,684 | $2,700 | $3,399 | $1,684 | $2,500 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $351 | $351 | $800 | $567 | $351 | $1,050 |
| 633E75000 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT | 1 EACH | $4,946 | $4,946 | $4,500 | $5,006 | $4,946 | $5,000 |
| 809E69100 STOP LINE RADAR DETECTION | 2 EACH | $6,977 | $6,977 | $6,000 | $7,354 | $6,977 | $6,500 |
| 625E18510 BRACKET ARM, 30' | 2 EACH | $1,315 | $1,315 | $1,350 | $1,751 | $1,315 | $1,700 |
| 633E65520 CABINET, TYPE 332 | 1 EACH | $8,557 | $8,557 | $9,600 | $9,476 | $8,557 | $8,300 |
| 633E99000 CONTROLLER ITEM, MISC.:CONTROLLER UNIT, INSTALLATI | 1 EACH | $721 | $721 | $2,750 | $2,266 | $721 | $500 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 100 CY | $103 | $59.67 | $68.00 | $65.00 | $55.00 | $20.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $70.00 | $75.00 | $81.00 | $72.00 | $75.00 | $50.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 370 FT | $0.75 | $1.00 | $1.00 | $2.50 | $2.00 | $2.20 |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 4 EACH | $2,000 | $2,200 | $2,120 | $1,854 | $1,800 | $1,800 |
| 614E12420 DETOUR SIGNING | 1 LS | $3,450 | $3,450 | $6,500 | $3,683 | $3,723 | $3,600 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 100 CY | $152 | $295 | $250 | $174 | $250 | $125 |
| 614E13314 BARRIER REFLECTOR, TYPE 3, BIDIRECTIONAL | 6 EACH | $17.50 | $12.00 | $30.00 | $7.50 | $10.00 | $50.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 15 EACH | $21.50 | $15.00 | $18.00 | $8.00 | $10.00 | $50.00 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.58 MILE | $12,100 | $6,000 | $12,100 | $11,330 | $12,100 | $12,250 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.52 MILE | $2,050 | $2,050 | $2,050 | $4,393 | $2,050 | $2,200 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 1.16 MILE | $6,050 | $1,500 | $6,050 | $6,254 | $6,050 | $6,200 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 44 FT | $10.75 | $4.50 | $10.75 | $9.50 | $10.75 | $12.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $12,500 | $14,000 | $36,000 | $19,491 | $12,000 | $17,500 |
| 616E10000 WATER | 12 MGAL | $5.50 | $1.00 | $80.00 | $27.00 | $1.00 | $1.00 |
| 622E41000 PORTABLE BARRIER, 32" | 370 FT | $21.00 | $18.00 | $14.00 | $37.50 | $19.50 | $16.00 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $12,500 | $14,000 | $8,050 | $18,138 | $7,300 | $20,000 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $15,750 | $10,000 | $16,435 | $3,090 | $7,400 | $3,000 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $5,500 | $12,000 | $21,000 | $5,819 | $6,700 | $13,000 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 9,968 LB | $1.25 | $1.70 | $1.50 | $2.00 | $1.30 | $1.50 |
| 511E46611 CLASS QC1 CONCRETE, HEADWALL, AS PER PLAN | 2 CY | $837 | $2,500 | $2,040 | $2,180 | $1,050 | $1,500 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 65 SY | $30.00 | $33.00 | $30.00 | $41.00 | $30.00 | $35.00 |
| 512E33000 TYPE 2 WATERPROOFING | 202 SY | $22.50 | $22.00 | $22.50 | $21.50 | $22.50 | $13.00 |
| 512E33010 TYPE 3 WATERPROOFING | 129 SY | $30.00 | $36.00 | $30.00 | $46.50 | $30.00 | $20.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 35 SF | $1.30 | $3.00 | $10.00 | $11.00 | $2.00 | $12.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 9 CY | $181 | $290 | $78.00 | $121 | $125 | $100 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 63 SF | $135 | $110 | $125 | $60.50 | $130 | $100 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,500 | $8,500 | $10,252 | $29,000 | $15,000 | $42,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 594 CY | $180 | $107k | 9% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 1,800 CY | $48.5 | $87k | 7% |
| 611E96310 14' X 5' CONDUIT, TYPE A, 706.05 | 58 FT | $1,350 | $78k | 7% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (365 CY | $185 | $68k | 6% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 261 CY | $200 | $52k | 4% |
| 304E20000 AGGREGATE BASE | 730 CY | $60 | $44k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 925 SY | $43 | $40k | 3% |
| 832E30000 EROSION CONTROL | 39,000 EACH | $1 | $39k | 3% |
| 204E13000 EXCAVATION OF SUBGRADE | 1,800 CY | $19.5 | $35k | 3% |