ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 20 more items below.
| Item | Quantity | R1Alan Stone CO INC | R2Shelly & Sands INC | R3Ohio-west Virginia Excavating CO | R4Suburban Maintenance & Construction | R5R C Construction Company And Son | % of bid |
|---|---|---|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: SOLDIER PILE W14X89 | 1,307 FT | $44.00 | $51.00 | $53.75 | $50.00 | $60.00 | 16% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 447 CY | $112 | $115 | $96.00 | $62.00 | $20.00 | 14% |
| 530E00400 SPECIAL - STRUCTURES PRECAST CONCRETE PANEL 1 | 125 EACH | $399 | $450 | $520 | $350 | $550 | 14% |
| 524E94605 DRILLED SHAFTS, 30" DIAMETER INTO BEDROCK, AS PER | 473 FT | $90.00 | $107 | $133 | $140 | $225 | 12% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $32,722 | $15,500 | $42,500 | $35,000 | $40,000 | 9% |
| 624E10000 MOBILIZATION |
| Item | Quantity | R1Alan Stone CO INC | R2Shelly & Sands INC | R3Ohio-west Virginia Excavating CO | R4Suburban Maintenance & Construction | R5R C Construction Company And Son |
|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 350 FT | $3.00 | $1.80 | $5.00 | $2.50 | $3.00 |
| 204E10000 SUBGRADE COMPACTION | 72 SY | $2.50 | $10.00 | $28.00 | $5.00 | $2.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIIONAL | 7 EACH | $7.50 | $7.00 | $20.00 | $105 | $20.00 |
| 659E10000 SEEDING AND MULCHING | 386 SY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $26,380 |
| $13,000 |
| $12,250 |
| $50,000 |
| $20,000 |
| 7% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 81 CY | $245 | $320 | $229 | $320 | $375 | 5% |
| 622E41000 PORTABLE BARRIER, 32" | 600 FT | $20.00 | $27.00 | $22.00 | $34.00 | $20.00 | 3% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 17 CY | $587 | $550 | $365 | $600 | $650 | 3% |
| 524E94603 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK, AS PE | 162 FT | $61.00 | $95.00 | $93.00 | $65.00 | $175 | 3% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 2 EACH | $4,199 | $2,465 | $3,000 | $2,000 | $2,100 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 350 FT | $23.00 | $22.20 | $25.00 | $25.14 | $27.00 | 2% |
| 202E98200 REMOVAL MISC.:RETAINING WALL | 67 FT | $93.00 | $95.00 | $90.00 | $87.00 | $200 | 2% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $5,800 | $13,500 | $900 | $11,000 | $7,500 | 2% |
| 203E10000 EXCAVATION | 174 CY | $31.00 | $23.00 | $23.00 | $15.00 | $20.00 | 1% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,724 | $8,052 | $1,800 | $5,000 | $12,000 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,428 | $7,000 | $4,000 | $25,000 | $7,500 | 1% |
| 621E00100 RPM | 18 EACH | $178 | $85.00 | $98.00 | $75.00 | $300 | 1% |
| 203E20000 EMBANKMENT | 220 CY | $14.00 | $15.00 | $15.00 | $15.00 | $20.00 | 1% |
| $2.50 |
| $4.50 |
| $8.00 |
| $2.50 |
| $10.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.05 TON | $2,772 | $150 | $1,800 | $500 | $1,200 |
| 659E31000 LIME | 0.08 ACRE | $735 | $695 | $2,800 | $500 | $800 |
| 659E35000 WATER | 1 MGAL | $36.00 | $1.00 | $115 | $1.00 | $1.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 275 FT | $9.00 | $4.50 | $6.00 | $8.00 | $20.00 |
| 518E40012 6" NON-PERFORATED CORRUGATED PLASTIC PIPE | 47 FT | $42.00 | $20.00 | $18.00 | $8.00 | $20.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $331 | $400 | $288 | $250 | $250 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 124 FT | $21.00 | $4.50 | $7.00 | $2.50 | $40.00 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 11 CY | $245 | $385 | $550 | $386 | $350 |
| 304E20000 AGGREGATE BASE | 12 CY | $136 | $135 | $208 | $65.00 | $75.00 |
| 407E20000 NON-TRACKING TACK COAT | 131 GAL | $9.00 | $4.00 | $5.00 | $4.00 | $10.00 |
| 408E10000 PRIME COAT | 125 GAL | $14.00 | $18.00 | $28.00 | $18.00 | $20.00 |
| 617E10100 COMPACTED AGGREGATE | 13 CY | $130 | $135 | $285 | $200 | $75.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 18 EACH | $12.00 | $20.00 | $18.00 | $50.00 | $50.00 |
| 642E00094 EDGE LINE, 6" | 0.27 MILE | $3,149 | $3,000 | $29,000 | $10,000 | $12,500 |
| 642E00290 CENTER LINE | 0.13 MILE | $5,878 | $5,600 | $29,000 | $10,000 | $12,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,500 | $3,950 | $7,000 | $15,000 | $20,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: SOLDIER PILE W14X89 | 1,307 FT | $44 | $58k | 15% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 447 CY | $112 | $50k | 13% |
| 530E00400 SPECIAL - STRUCTURES PRECAST CONCRETE PANEL 1 | 125 EACH | $399 | $50k | 13% |
| 524E94605 DRILLED SHAFTS, 30" DIAMETER INTO BEDROCK, AS PER | 473 FT | $90 | $43k | 11% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $32,722 | $33k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $26,380 | $26k | 7% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 81 CY | $245 | $20k | 5% |
| 622E41000 PORTABLE BARRIER, 32" | 600 FT | $20 | $12k | 3% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 17 CY | $587 | $10k | 3% |
| 524E94603 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK, AS PE | 162 FT | $61 | $10k | 3% |