ATH-SR 329-05.44
ATH County · est $0.3M
Bid dateThursday, May 17—
ATH County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 28 more items below.
| Item | Quantity | R1Parker Corporation | R2Shelly & Sands INC | R3Axis Civil Construction LLC | R4Allard Excavation LLC | R5R C Construction Company And Son | % of bid |
|---|---|---|---|---|---|---|---|
| 601E25001 DUMPED ROCK FILL, TYPE A, AS PER PLAN | 1,094 CY | $65.00 | $57.00 | $60.00 | $56.24 | $65.00 | 25% |
| 203E35121 GRANULAR MATERIAL, TYPE C, AS PER PLAN | 655 CY | $65.00 | $70.00 | $72.00 | $59.67 | $75.00 | 15% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 357 SY | $75.00 | $60.00 | $44.00 | $85.00 | $125 | 9% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 67 CY | $361 | $400 | $330 | $360 | $450 | 8% |
| 203E20000 EMBANKMENT | 2,168 CY | $10.00 | $16.00 | $20.00 | $18.35 | $20.00 | 8% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN |
| Item | Quantity | R1Parker Corporation | R2Shelly & Sands INC | R3Axis Civil Construction LLC | R4Allard Excavation LLC | R5R C Construction Company And Son |
|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 83 SY | $5.00 | $23.00 | $30.00 | $17.00 | $20.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 60 FT | $20.00 | $6.00 | $40.00 | $4.75 | $100 |
| 204E10000 SUBGRADE COMPACTION | 125 SY | $0.50 | $8.00 | $3.00 | $3.72 | $2.00 |
| 690E12010 SPECIAL - GEOTEXTILE FABRIC , 712.09, TYPE A | 671 SY | $2.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 192 CY |
| $65.00 |
| $95.00 |
| $113 |
| $68.50 |
| $75.00 |
| 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $8,100 | $22,000 | $31,900 | $25,000 | 4% |
| 611E13200 30" CONDUIT, TYPE A | 86 FT | $105 | $160 | $180 | $98.52 | $150 | 3% |
| 203E10000 EXCAVATION | 831 CY | $10.00 | $10.00 | $20.00 | $5.40 | $20.00 | 3% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 66 CY | $115 | $122 | $125 | $123 | $150 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,600 | $2,250 | $3,500 | $7,300 | $17,000 | 2% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 4 EACH | $1,500 | $2,200 | $2,000 | $2,100 | $1,500 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $6,000 | $15,000 | $22,000 | $2,500 | $35,000 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 14 CY | $401 | $500 | $600 | $400 | $375 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $5,500 | $10,000 | $20,000 | $56,100 | $10,000 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (15 CY | $341 | $475 | $330 | $340 | $450 | 2% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $5,000 | $8,900 | $3,500 | $4,900 | $20,000 | 2% |
| 622E41000 PORTABLE BARRIER, 32" | 470 FT | $10.00 | $28.00 | $24.00 | $16.00 | $20.00 | 2% |
| 611E01400 6" CONDUIT, TYPE E , 707.31 (PERFORATED) | 723 FT | $6.00 | $3.75 | $6.00 | $1.87 | $25.00 | 2% |
| 623E40500 REFERENCE MONUMENT | 6 EACH | $500 | $480 | $550 | $548 | $750 | 1% |
| $1.25 |
| $3.00 |
| $1.77 |
| $10.00 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $100 | $250 | $100 | $150 | $150 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 5 CY | $65.00 | $260 | $125 | $108 | $65.00 |
| 659E10000 SEEDING AND MULCHING | 2,929 SY | $1.00 | $1.60 | $1.10 | $1.00 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.26 TON | $1,924 | $710 | $625 | $500 | $1,200 |
| 659E31000 LIME | 0.61 ACRE | $820 | $100 | $150 | $75.00 | $900 |
| 659E35000 WATER | 8 MGAL | $0.05 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 1.2 CY | $750 | $2,250 | $1,550 | $2,122 | $2,500 |
| 605E31100 AGGREGATE DRAINS | 98 FT | $10.00 | $15.00 | $12.00 | $14.63 | $10.00 |
| 611E01500 6" CONDUIT, TYPE F , 707.33 | 63 FT | $6.00 | $18.00 | $6.00 | $4.36 | $10.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $100 | $450 | $200 | $195 | $250 |
| 304E20000 AGGREGATE BASE | 31 CY | $65.00 | $90.00 | $110 | $94.00 | $75.00 |
| 407E20000 NON-TRACKING TACK COAT | 139 GAL | $4.00 | $3.00 | $5.00 | $4.00 | $10.00 |
| 617E10100 COMPACTED AGGREGATE | 25 CY | $65.00 | $110 | $90.00 | $78.19 | $75.00 |
| 621E00100 RPM | 10 EACH | $150 | $500 | $500 | $150 | $300 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 10 EACH | $20.00 | $40.00 | $18.00 | $9.00 | $50.00 |
| 642E00094 EDGE LINE, 6" | 0.26 MILE | $5,100 | $3,000 | $3,000 | $3,000 | $6,500 |
| 642E00290 CENTER LINE | 0.13 MILE | $5,300 | $5,600 | $5,600 | $5,600 | $10,000 |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $100 | $13,500 | $3,200 | $17,000 | $7,500 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 , BIDIRECTIONAL | 21 EACH | $10.00 | $17.00 | $7.00 | $5.00 | $40.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 21 EACH | $10.00 | $18.00 | $2.68 | $8.00 | $40.00 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.33 MILE | $1,600 | $2,500 | $2,200 | $2,500 | $7,500 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 24 FT | $10.00 | $18.00 | $18.00 | $18.00 | $50.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,000 | $16,500 | $5,500 | $6,000 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 601E25001 DUMPED ROCK FILL, TYPE A, AS PER PLAN | 1,094 CY | $65 | $71k | 23% |
| 203E35121 GRANULAR MATERIAL, TYPE C, AS PER PLAN | 655 CY | $65 | $43k | 14% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 357 SY | $75 | $27k | 9% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 67 CY | $361 | $24k | 8% |
| 203E20000 EMBANKMENT | 2,168 CY | $10 | $22k | 7% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN | 192 CY | $65 | $12k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $10k | 3% |
| 611E13200 30" CONDUIT, TYPE A | 86 FT | $105 | $9k | 3% |
| 203E10000 EXCAVATION | 831 CY | $10 | $8k | 3% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 66 CY | $115 | $8k | 2% |