BEL-SR 647-03.38
BEL County · est $0.1M
Bid dateThursday, July 26—
BEL County · est $0.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 14 more items below.
| Item | Quantity | R1Nls Paving, INC | R2R C Construction Company And Son INC | R3Ohio-west Virginia Excavating CO | R4Shelly & Sands INC | R5Craig Edward Susany INC | % of bid |
|---|---|---|---|---|---|---|---|
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $22,000 | $20,000 | $44,000 | $57,516 | $40,000 | 34% |
| 511E71100 CONCRETE, MISC.: CAST-IN-PLACE CONCRETE LAGGING | 4 CY | $1,550 | $2,800 | $2,500 | $5,700 | $10,000 | 10% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $10,000 | $10,000 | $4,000 | $4,000 | 6% |
| 611E07400 18" CONDUIT, TYPE B | 30 FT | $130 | $275 | $298 | $200 | $450 | 6% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 35 FT | $98.00 | $50.00 | $53.00 | $60.00 | $150 | 5% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN |
| Item | Quantity | R1Nls Paving, INC | R2R C Construction Company And Son INC | R3Ohio-west Virginia Excavating CO | R4Shelly & Sands INC | R5Craig Edward Susany INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $325 | $2,500 | $4,000 | $6,187 | $4,000 |
| 202E20010 HEADWALL REMOVED | 1 EACH | $365 | $750 | $2,000 | $175 | $500 |
| 202E38000 GUARDRAIL REMOVED | 50 FT | $13.00 | $5.00 | $10.00 | $5.00 | $20.00 |
| 204E10000 SUBGRADE COMPACTION | 44 SY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 8 CY |
| $400 |
| $100 |
| $965 |
| $200 |
| $1,000 |
| 5% |
| 606E13000 GUARDRAIL, TYPE 5 | 50 FT | $53.00 | $75.00 | $62.00 | $40.00 | $70.00 | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 5 CY | $400 | $1,000 | $747 | $900 | $1,000 | 3% |
| 601E26000 DUMPED ROCK FILL, TYPE B | 11 CY | $170 | $95.00 | $220 | $175 | $300 | 3% |
| 304E20000 AGGREGATE BASE | 10 CY | $185 | $95.00 | $293 | $150 | $250 | 3% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 2 CY | $840 | $1,500 | $1,800 | $1,300 | $2,000 | 3% |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 22 SY | $75.00 | $250 | $225 | $65.00 | $100 | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (2 CY | $800 | $1,500 | $1,600 | $1,200 | $2,000 | 2% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 37 SY | $39.50 | $50.00 | $67.00 | $25.00 | $100 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 16 SY | $85.00 | $200 | $305 | $110 | $250 | 2% |
| 202E98000 REMOVAL MISC.: W-BEAM RAIL SECTIONS AND PORTIONS O | 1 LS | $1,275 | $15,000 | $1,500 | $6,500 | $15,000 | 2% |
| 621E00100 RPM | 1 EACH | $1,275 | $3,500 | $955 | $845 | $500 | 2% |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $1,250 | $3,500 | $3,500 | $3,000 | $2,500 | 2% |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $750 | $750 | $1,500 | $750 | $500 | 1% |
| $2.00 |
| $2.00 |
| $15.00 |
| $12.50 |
| $20.00 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 18 SY | $5.50 | $100 | $90.00 | $55.00 | $15.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 108 FT | $3.75 | $40.00 | $12.00 | $5.50 | $25.00 |
| 407E10000 TACK COAT | 4 GAL | $2.00 | $25.00 | $3.00 | $2.00 | $10.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 5 GAL | $3.00 | $120 | $3.00 | $110 | $110 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1 EACH | $31.00 | $50.00 | $75.00 | $75.00 | $10.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 1 EACH | $25.00 | $20.00 | $70.00 | $10.00 | $10.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.01 MILE | $50,000 | $55,000 | $72,000 | $52,000 | $100,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.01 MILE | $50,000 | $55,000 | $72,000 | $52,000 | $100,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $275 | $6,500 | $2,000 | $920 | $6,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $300 | $4,500 | $1,200 | $4,500 | $4,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $22,000 | $22k | 32% |
| 511E71100 CONCRETE, MISC.: CAST-IN-PLACE CONCRETE LAGGING | 4 CY | $1,550 | $6k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $4k | 6% |
| 611E07400 18" CONDUIT, TYPE B | 30 FT | $130 | $4k | 6% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 35 FT | $98 | $3k | 5% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 8 CY | $400 | $3k | 5% |
| 606E13000 GUARDRAIL, TYPE 5 | 50 FT | $53 | $3k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 5 CY | $400 | $2k | 3% |
| 601E26000 DUMPED ROCK FILL, TYPE B | 11 CY | $170 | $2k | 3% |
| 304E20000 AGGREGATE BASE | 10 CY | $185 | $2k | 3% |