ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Ohio-west Virginia Excavating CO | R3Alan Stone CO INC | % of bid |
|---|---|---|---|---|---|
| 614E12740 WORK ZONE LIGHTING SYSTEM | 2 EACH | $37,000 | $7,000 | $11,345 | 15% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 756 FT | $93.00 | $85.00 | $87.00 | 14% |
| 507E00400 STEEL PILES, MISC.:SOLDIER PILES W21X101 | 1,150 FT | $57.00 | $68.00 | $58.00 | 13% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $37,913 | $210,000 | $200,716 | 7% |
| 530E00400 SPECIAL - STRUCTURES PRECAST CONCRETE LAGGING NO. | 106 EACH | $355 | $350 | $291 | 7% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 4 EACH | $8,600 | $10,000 | $9,292 | 7% |
| 632E42700 SIGNAL CABLE, 7 CONDUCTOR, NO. 12 AWG | 2,275 FT |
| Item | Quantity | R1Shelly & Sands INC | R2Ohio-west Virginia Excavating CO | R3Alan Stone CO INC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,200 | $4,000 | $2,250 |
| 202E23000 PAVEMENT REMOVED | 42 SY | $30.00 | $24.00 | $75.00 |
| 203E10000 EXCAVATION | 9 CY | $10.00 | $32.00 | $50.00 |
| 203E20000 EMBANKMENT | 158 CY | $17.00 | $35.00 | $12.00 |
| 204E10000 SUBGRADE COMPACTION | 98 SY | $9.00 | $5.00 | $3.50 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $10.50 |
| $4.50 |
| $4.50 |
| 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 46 CY | $500 | $225 | $541 | 5% |
| 633E65530 CABINET, TYPE 336 | 1 EACH | $18,400 | $10,000 | $10,373 | 4% |
| 622E41000 PORTABLE BARRIER, 32" | 540 FT | $32.00 | $30.00 | $59.00 | 3% |
| 524E94803 DRILLED SHAFTS, 42" DIAMETER, ABOVE BEDROCK, AS PE | 98 FT | $165 | $200 | $551 | 3% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 128 CY | $120 | $95.00 | $200 | 3% |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $12,765 | $9,000 | $8,752 | 3% |
| 632E89300 WOOD POLE | 2 EACH | $6,325 | $2,500 | $2,486 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $20,000 | $23,834 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 10 CY | $800 | $300 | $865 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 400 FT | $19.00 | $20.00 | $21.00 | 2% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 98 FT | $75.00 | $105 | $94.00 | 1% |
| 620E70000 DELINEATOR, MISC.: :FLEXIBLE DELINEATOR | 70 EACH | $100 | $6.00 | $109 | 1% |
| 621E00100 RPM | 13 EACH | $500 | $225 | $541 | 1% |
| 2 EACH |
| $2,350 |
| $2,400 |
| $2,540 |
| 659E10000 SEEDING AND MULCHING | 1,000 SY | $2.15 | $4.00 | $2.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.09 TON | $800 | $500 | $2,772 |
| 659E31000 LIME | 0.2 ACRE | $160 | $450 | $735 |
| 659E35000 WATER | 3 MGAL | $1.00 | $1.00 | $21.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $250 | $175 | $339 |
| 304E20000 AGGREGATE BASE | 14 CY | $125 | $150 | $149 |
| 407E20000 NON-TRACKING TACK COAT | 88 GAL | $4.00 | $7.00 | $4.50 |
| 408E10000 PRIME COAT | 34 GAL | $45.00 | $10.00 | $49.00 |
| 617E10100 COMPACTED AGGREGATE | 5 CY | $150 | $175 | $254 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 :BI-DIRECTIONAL | 7 EACH | $8.00 | $40.00 | $55.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 7 EACH | $14.00 | $25.00 | $55.00 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.04 MILE | $14,525 | $25,000 | $15,694 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 20 FT | $13.50 | $20.00 | $15.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 13 EACH | $10.00 | $11.99 | $13.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 BIDIRECTIONAL | 5 EACH | $8.50 | $13.00 | $9.50 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $20.00 | $55.00 | $100 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $20.00 | $55.00 | $50.00 |
| 632E89400 DOWN GUY | 1 EACH | $3,105 | $1,200 | $1,189 |
| 642E00094 EDGE LINE, 6" | 0.17 MILE | $3,935 | $6,000 | $4,252 |
| 642E00290 CENTER LINE | 0.09 MILE | $7,090 | $12,000 | $7,661 |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 12 CY | $350 | $575 | $530 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 165 FT | $5.00 | $8.00 | $11.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 7 FT | $25.00 | $8.00 | $71.00 |
| 524E95000 DRILLED SHAFTS, MISC.: : EXTENSION | 9 FT | $350 | $170 | $73.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,450 | $8,000 | $4,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,500 | $2,000 | $8,104 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E12740 WORK ZONE LIGHTING SYSTEM | 2 EACH | $37,000 | $74k | 13% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 756 FT | $93 | $70k | 13% |
| 507E00400 STEEL PILES, MISC.:SOLDIER PILES W21X101 | 1,150 FT | $57 | $66k | 12% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $37,913 | $38k | 7% |
| 530E00400 SPECIAL - STRUCTURES PRECAST CONCRETE LAGGING NO. | 106 EACH | $355 | $38k | 7% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 4 EACH | $8,600 | $34k | 6% |
| 632E42700 SIGNAL CABLE, 7 CONDUCTOR, NO. 12 AWG | 2,275 FT | $10.5 | $24k | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 46 CY | $500 | $23k | 4% |
| 633E65530 CABINET, TYPE 336 | 1 EACH | $18,400 | $18k | 3% |
| 622E41000 PORTABLE BARRIER, 32" | 540 FT | $32 | $17k | 3% |