WAS-US 50-05.50
WAS County · est $0.4M
Bid dateThursday, November 8—
WAS County · est $0.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 15 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2D G M INC | R3Alan Stone CO INC | R4Eclipse CO LLC | R5Parker Corporation | % of bid |
|---|---|---|---|---|---|---|---|
| 601E28000 DUMPED ROCK FILL, TYPE D | 2,706 CY | $61.00 | $75.00 | $72.00 | $85.00 | $100 | 53% |
| 609E23001 COMBINATION CURB AND GUTTER, TYPE 4, AS PER PLAN | 1,398 FT | $22.75 | $40.00 | $52.50 | $33.50 | $100 | 10% |
| 622E41000 PORTABLE BARRIER, 32" | 1,520 FT | $13.75 | $16.00 | $21.00 | $27.00 | $10.00 | 7% |
| 606E16500 GUARDRAIL REBUILT, TYPE 5 | 1,397 FT | $10.75 | $12.00 | $12.00 | $11.00 | $11.00 | 5% |
| 203E20000 EMBANKMENT | 876 CY | $16.25 | $15.00 | $27.00 | $7.50 | $20.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 |
| Item | Quantity | R1Shelly & Sands INC | R2D G M INC | R3Alan Stone CO INC | R4Eclipse CO LLC | R5Parker Corporation |
|---|---|---|---|---|---|---|
| 202E32500 CURB AND GUTTER REMOVED | 101 FT | $8.25 | $1.00 | $18.00 | $7.50 | $10.00 |
| 202E42610 ANCHOR ASSEMBLY REMOVED FOR REUSE, TYPE B-98 | 1 EACH | $150 | $250 | $433 | $184 | $200 |
| 202E47200 BRIDGE TERMINAL ASSEMBLY REMOVED FOR REUSE | 2 EACH | $100 | $250 | $0.50 | $184 | $150 |
| 606E28000 ANCHOR ASSEMBLY REBUILT, TYPE B-98 | 1 EACH | $1,250 | $900 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $8,000 |
| $20,000 |
| $25,000 |
| $20,000 |
| 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,425 | $4,000 | $6,500 | $9,500 | $20,000 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,900 | $12,500 | $8,651 | $11,085 | $20,000 | 2% |
| 203E10000 EXCAVATION | 160 CY | $39.00 | $25.00 | $37.00 | $19.00 | $20.00 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,675 | $18,500 | $12,000 | $27,047 | $20,000 | 2% |
| 659E10000 SEEDING AND MULCHING | 6,463 SY | $0.67 | $1.50 | $1.50 | $1.50 | $1.25 | 1% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 2 EACH | $1,850 | $2,000 | $1,942 | $1,900 | $2,500 | 1% |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 1,397 FT | $2.50 | $2.00 | $3.00 | $3.50 | $3.00 | 1% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 721 SY | $4.50 | $8.00 | $17.00 | $11.00 | $10.00 | 1% |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,025 | $4,000 | $6,500 | $7,455 | $10,000 | 1% |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED | 180 FT | $15.00 | $16.00 | $26.00 | $47.50 | $10.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,750 | $8,000 | $4,500 | $16,500 | $10,000 | 1% |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 1.35 MILE | $1,175 | $1,400 | $1,234 | $2,520 | $7,500 | 1% |
| 204E10000 SUBGRADE COMPACTION | 389 SY | $3.75 | $4.00 | $2.50 | $5.00 | $1.00 | 0% |
| $1,312 |
| $893 |
| $1,300 |
| 606E35010 BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 1 | 1 EACH | $1,200 | $1,000 | $1,260 | $1,045 | $1,250 |
| 606E35110 BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 2 | 1 EACH | $250 | $300 | $263 | $273 | $300 |
| 659E20000 COMMERCIAL FERTILIZER | 0.59 TON | $789 | $300 | $788 | $788 | $1,700 |
| 659E31000 LIME | 1.34 ACRE | $153 | $80.00 | $210 | $210 | $750 |
| 659E35000 WATER | 18 MGAL | $1.00 | $1.00 | $1.50 | $1.00 | $1.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, 1 WAY | 31 EACH | $7.00 | $10.00 | $7.50 | $10.50 | $10.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 6 EACH | $55.00 | $50.00 | $58.00 | $47.50 | $100 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 7 EACH | $100 | $50.00 | $105 | $47.50 | $100 |
| 614E11630 INCREASED BARRIER DELINEATION | 2,126 FT | $0.50 | $1.50 | $1.00 | $2.00 | $5.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (1 WAY) | 81 EACH | $6.50 | $12.00 | $13.00 | $10.50 | $10.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 81 EACH | $12.00 | $12.00 | $19.00 | $10.50 | $10.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 601E28000 DUMPED ROCK FILL, TYPE D | 2,706 CY | $61 | $165k | 51% |
| 609E23001 COMBINATION CURB AND GUTTER, TYPE 4, AS PER PLAN | 1,398 FT | $22.75 | $32k | 10% |
| 622E41000 PORTABLE BARRIER, 32" | 1,520 FT | $13.75 | $21k | 7% |
| 606E16500 GUARDRAIL REBUILT, TYPE 5 | 1,397 FT | $10.75 | $15k | 5% |
| 203E20000 EMBANKMENT | 876 CY | $16.25 | $14k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,425 | $8k | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,900 | $7k | 2% |
| 203E10000 EXCAVATION | 160 CY | $39 | $6k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,675 | $6k | 2% |